Renewable Power Purchase Obligation and its Compliance (Sixth Amendment) Regulations, 2019 — Draft

Himachal Pradesh Electricity Regulatory Commission (Renewable Power Purchase Obligation and its Compliance) (Sixth Amendment) Regulations, 2019

Draft amendmentDated 23 Nov 2019No. HPERC/438 dated 23rd November, 2019

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is HPERC's consultation notice No. HPERC/438 dated 23 November 2019, publishing draft Sixth Amendment Regulations to the Commission's Renewable Power Purchase Obligation and its Compliance Regulations, 2010 (p1). Nothing is amended by the notice itself: the draft is published under s.181(3) of the Electricity Act 2003 and rule 3 of the Electricity (Procedure for Previous Publication) Rules 2005 so that objections and suggestions can reach the Secretary within 21 days of the notification, after which the draft will be taken into consideration (p1–2).

The preamble explains why: the Ministry of Power clarified on 1 February 2019 that the RPO of a captive power plant is pegged to the RPO level of the year in which the plant was commissioned, with additional RPO only when fossil-fuel capacity is added, and issued a further clarification on applicability over time; the Commission says this requires clarity in the 2010 Regulations on applicability to captive plants by year of commissioning or augmentation (p1).

The operative part is deliberately narrow. Regulation 1 gives the title and a commencement date of 1 April 2020 (p2). Regulation 2 substitutes regulation 4(2) — setting out how total consumption is measured for consumers taking power from sources other than the distribution licensee, including open access and power bought under the REC mechanism, and whether consumption counts at the State periphery or the generating bus bar, with energy presumed non-hydro unless the State Agency is satisfied otherwise — and inserts new sub-regulations 4(2A) and 4(2AA) covering drawal from captive generating plants and consumers consuming partly under each route (p2–3). The Schedule (p4) sets minimum solar, non-solar and total RPPO percentages by the year in which the captive plant's original capacity was commissioned or augmented, with footnotes on the consumption base, partial compliance and augmentation.

Standard name
RPO Regulations
Primary topics
Renewable purchase obligation (RPO / RCO)

Read with this

Proposed changes (drafts with no final yet)

3 more documents belong here and are not on Voltaic: 1 amendment, 1 commencement notice or statement of reasons and 1 procedure or order made under it.

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.