Renewable Power Purchase Obligation and its Compliance Regulations, 2010

Himachal Pradesh Electricity Regulatory Commission (Renewable Power Purchase Obligation and its Compliance) Regulations, 2010

RegulationDated 26 May 2010HPERC/438 dated 26th May, 2010

Replaced by Renewable Power Purchase Obligation and its Compliance Regulations, 2023

See that regulation for the date it took effect and for anything it keeps in force.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The notification (p1) issues the HPERC (Renewable Power Purchase Obligation and its Compliance) Regulations, 2010 under the Electricity Act, 2003. They commence on publication in the Rajpatra, Himachal Pradesh; the Gazette date is not printed. Regulations 1–2 give the short title, commencement and definitions, including 'obligated entity', 'renewable energy sources', 'Central Agency', 'State Agency' and 'Certificate' (p1–2).

Regulation 3 makes the RPPO applicable to the distribution licensee and to any person consuming electricity from a conventional captive generating plant of 1 MW and above for own use and/or procuring conventional generation through open access third-party sale (p2). Regulation 4 sets the obligation as a defined minimum percentage of consumption — for the distribution licensee including T&D losses and for captive/open access consumers on total consumption — with a table of percentages that is not reproduced in the available text (p2–3). Solar must be met from solar sources; the obligation is inclusive of RE purchases, own RE generation and RE-sourced purchases from other licensees; existing PPAs continue; the Commission may revise targets; the FY 2012-13 target continues until revised (p2–3).

Regulation 5 treats CERC renewable energy certificates as valid compliance instruments, with solar and non-solar certificate categories, deposited with the Commission through the Central Agency's procedure (p3–4). Regulation 6 covers the designated State Agency for accreditation, project recommendation, quarterly compliance reporting and remuneration (p4). Regulation 7 requires the distribution licensee to estimate its renewable purchase in tariff/annual performance review petitions, carries shortfall forward and disallows credit for excess purchase (p5). Regulation 8 applies the RPPO to captive/open access consumers from a Gazette notification date, requires annual data by 30 April to the State Agency, and provides for compensation on shortfall and REC compliance (p5).

Regulation 9 sets the default consequences: deposit into a separate fund computed from the shortfall and the CERC forbearance price, use of the fund for certificates and RE evacuation infrastructure, 15-day deposit on pain of licence breach, section 142 penalty, and carry-forward where certificates are genuinely unavailable (p5–6). Regulations 10–14 deal with overriding effect over tariff/open access regulations, removal of difficulties, orders and practice directions, inherent powers and final Commission interpretation (p6–7). A footnote records a corrigendum dated 20-07-2010 changing the 2010-11 table figure from 10.1% to 10.0% (p3).

Standard name
RPO Regulations
Primary topics
Renewable purchase obligation (RPO / RCO), Renewable energy certificates (REC), Compliance and reporting

Read with this

Proposed changes (drafts with no final yet)

3 more documents belong here and are not on Voltaic: 1 amendment, 1 commencement notice or statement of reasons and 1 procedure or order made under it.

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document