HPERC · Himachal Pradesh Electricity Regulatory Commission
Renewable Power Purchase Obligation and its Compliance (Fifth Amendment) Regulations, 2018 — Statement of Reasons
In the matter of draft amendment Regulations of the Himachal Pradesh Electricity Regulatory Commission (Renewable Power Purchase Obligation and its Compliance) (Fifth Amendment) Regulations, 2018.
Statement of reasonsDated 27 Nov 2018
Replaced by Renewable Power Purchase Obligation and its Compliance Regulations, 2023
See that regulation for the date it took effect and for anything it keeps in force.
The commission's reasons for the Renewable Power Purchase Obligation and its Compliance Regulations, 2010 or one of its amendments.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Commission's Statement of Reasons for finalising the draft HPERC (Renewable Power Purchase Obligation and its Compliance) (Fifth Amendment) Regulations, 2018. It records why the amendment was made and how the consultation was handled — it is not the amended regulation text itself.
Pages 1–2 set out the background: the 2010 RPPO Regulations published in the Rajpatra dated 29 May 2010 (p1); the revised Central Tariff Policy notified on 28.01.2016, whose Para 6.4(1) requires the Appropriate Commission to fix minimum renewable purchase percentages and, within that, a reserved solar minimum (p1); the Ministry of Power's long-term RPO trajectory order of 22 July 2016 for 2016-17 to 2018-19, already adopted by the Commission by notification dated 24 March 2017 published in the Rajpatra of 27 March 2017 (p2); and the follow-on MoP order (No. 23/03/2016-R&R) dated 14 June 2018 extending the trajectory to 2019-20 to 2021-22 (p2). The draft Fifth Amendment was published in the Rajpatra on 30 October 2018 under s.181(1) of the Electricity Act, 2003 (p2).
Pages 2–3 deal with the consultation required by s.181(3) and the Electricity (Procedure of Previous Publication) Rules, 2005: newspaper notices on 2 November 2018, the draft posted on the Commission's website, and letters to named stakeholders. Only two responded — the Directorate of Energy, which sought a steeper non-solar/hydro trajectory through MoP and the Forum of Regulators, and the Consumer Representative, who welcomed the flexibility of meeting solar and non-solar RPO shortfalls against each other and sought a higher capacity threshold for hydro to count as renewable, plus a separate hydro-specific obligation.
Pages 3–4 give the Commission's view: hydro consumption is excluded from the RPO base, the State is encouraged to sell surplus hydro to other discoms, and a hydro purchase obligation benefit for stalled hydro projects is under consideration with the Government of India. The draft amendment was finalised without modification and approved for notification (p4). The SoR is signed at Shimla on 27 November 2018 (p4).
Read with this
The regulation
Amendments and corrections
- Dated 3 Oct 2011Renewable Power Purchase Obligation and its Compliance (First Amendment) Regulations, 2011
- Dated 30 Mar 2016Renewable Power Purchase Obligation and its Compliance (Second Amendment) Regulations, 2016
- Dated 6 Dec 2017Renewable Power Purchase Obligation and its Compliance (Fourth Amendment) Regulations, 2017
- Dated 5 Feb 2020Renewable Power Purchase Obligation and its Compliance Regulations, 2010 — Sixth Amendment, 2020
- Dated 15 Jul 2021Renewable Power Purchase Obligation and its Compliance Regulations, 2010 — Seventh Amendment, 2021
Commencement notices and reasons
- Dated 19 Jun 2010Notification of Designated State Agency — RPO Regulations, 2010
- Dated 30 Sep 2010RPPO Applicability to Captive and Open Access Consumers, 2010 — Notification
- Dated 3 Oct 2011Renewable Power Purchase Obligation and its Compliance Regulations, 2010 — First Amendment, 2011 — Statement of Objects/Reasons
- Dated 30 Nov 2016Short/Medium Term PPA for SHPs under REC Mechanism, Himachal Pradesh
- Dated 27 Sep 2017Renewable Power Purchase Obligation and its Compliance Regulations, 2010 — Fourth Amendment, 2017 — Statement of Reasons
- Dated 5 Feb 2020Renewable Power Purchase Obligation and its Compliance (Sixth Amendment) Regulations, 2020 — Statement of Reasons
- Dated 15 Jul 2021Renewable Power Purchase Obligation and its Compliance Regulations, 2010 — Seventh Amendment, 2021 — finalisation order
Procedures and orders made under it
- Dated 23 Oct 2010Fixation of Fees and Charges for Accreditation of Renewable Energy Generation Project Order, 2010
- Dated 14 Aug 2015Fixation of Fees and Charges for Accreditation of Renewable Energy Generation Project Order, 2015
- Dated 8 Mar 2016Fixation of Fees and Charges for Accreditation of Renewable Energy Generation Project and Distribution Licensee Order, 2016
- Dated 30 Nov 2016RPO Compliance Formats for Captive Consumers
- Dated 17 Jul 2017Adjustment of Surplus/Shortfall of Renewable Energy Certificates or Renewable Energy w.r.t. RPO of FY 2016-17 in FY 2017-18 Order, 2017
Proposed changes (drafts with no final yet)
Earlier drafts
- Dated 11 Aug 2016Renewable Power Purchase Obligation and its Compliance Regulations, 2010 — Third Amendment, 2016 — Draft
- Dated 27 Sep 2017Renewable Power Purchase Obligation and its Compliance Regulations, 2010 — Fourth Amendment, 2017 — Draft
- Dated 23 Nov 2019Renewable Power Purchase Obligation and its Compliance (Sixth Amendment) Regulations, 2019 — Draft
- Dated 3 Jun 2021Renewable Power Purchase Obligation and its Compliance (Seventh Amendment) Regulations, 2021 — Draft
3 more documents belong here and are not on Voltaic: 1 amendment, 1 commencement notice or statement of reasons and 1 procedure or order made under it.
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.