Draft Renewable Power Purchase Obligation and its Compliance Regulations, 2022

Himachal Pradesh Electricity Regulatory Commission (Renewable Power Purchase Obligation and its Compliance) Regulations, 2022

Draft regulationDated 23 Nov 2022No. HPERC/438 dated 23rd November, 2022

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

On 23 November 2022 the Himachal Pradesh Electricity Regulatory Commission issued notification No. HPERC/438 publishing draft Renewable Power Purchase Obligation and its Compliance Regulations, 2022 for objections and suggestions within 30 days. The draft is to commence on publication in the Rajpatra, and the preamble links it to the CERC REC Regulations, 2022 and the Ministry of Power's RPO trajectory up to FY 2029-30 (p1–2).

Regulations 2–3 define the key terms and identify who is obligated: the distribution licensee, open access consumers buying conventional power, and conventional captive plants above 5 MVA for standby use or above 1 MVA for normal use. Regulation 4 sets how consumption and the RPPO quantum are computed, including purchases, own generation, T&D losses, sales and banking. Regulation 5 requires annual compliance by category, with a quarterly endeavour, and lists eligible RE purchases, own generation, free power, banking and certificates; it also bars double counting and allows limited inter-category adjustment and certificate multipliers (p2–7).

Regulation 6 adopts RECs issued under CERC REC Regulations 2022 and 2010 as compliance instruments and restricts accreditation where the same energy is used for RPPO. Regulation 7 makes the Directorate of Energy the State Agency and provides for an RPPO web-portal, quarterly reporting and recommendations to the Commission. Regulation 8 requires online registration and periodic reporting, with verification; Regulation 9 provides a shortfall fund and penalties under section 142, with carry-forward relief. Regulation 10 defines REC-mechanism purchases and allows APPC-based rate fixing (p7–12).

Regulations 11–16 give overriding effect over inconsistent tariff and open access regulations, powers to remove difficulties and issue directions, preservation of inherent powers, repeal of the 2010 RPO Regulations with savings, and final interpretation by the Commission (p12–13). The Schedule sets annual wind, hydro, other and total RPPO percentages for 2022-23 to 2029-30, a separate energy-storage obligation, and conditions on eligible projects, free power, true-up and inter-category use (p14–15).

Standard name
RPO Regulations
Primary topics
Renewable purchase obligation (RPO / RCO), Compliance and reporting, Renewable energy certificates (REC)

Read with this

3 more documents belong here and are not on Voltaic: 1 amendment, 1 commencement notice or statement of reasons and 1 procedure or order made under it.

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document