HPERC · Himachal Pradesh Electricity Regulatory Commission
Renewable Power Purchase Obligation and its Compliance (Seventh Amendment) Regulations, 2021 — Draft
Himachal Pradesh Electricity Regulatory Commission (Renewable Power Purchase Obligation and its Compliance) (Seventh Amendment) Regulations, 2021
Draft amendmentDated 3 Jun 2021No. HPERC/438 dated the 3rd June, 2021
Draft
A proposal that has since been finalised as the Renewable Power Purchase Obligation and its Compliance Regulations, 2010 — Seventh Amendment, 2021.
Summary
Summary written by software. Check the regulator's original before you rely on it.
HPERC's notification No. HPERC/438, dated 3 June 2021, publishes for public objection a draft Seventh Amendment to the Himachal Pradesh Electricity Regulatory Commission (Renewable Power Purchase Obligation and its Compliance) Regulations, 2010 (p1–2). The preamble grounds the amendment in para 6.4(1) of the revised Tariff Policy of 28 January 2016, the Ministry of Power office memorandum of 8 March 2019 that declared large hydro above 25 MW a renewable source and created a Hydro Purchase Obligation within non-solar RPO, and the Ministry of Power order of 29 January 2021 issuing an RPO trajectory that states may adopt (p1).
The draft itself has three operative regulations (p2–3). Regulation 1 names the regulations and makes them commence on publication in the Rajpatra. Regulation 2 substitutes the definition of "renewable energy sources" — small/mini/micro hydro up to 25 MW, wind, solar, biomass, bio-fuel cogeneration and municipal waste, with large hydro routed to HPO only and a limited cross-use against solar and non-solar obligations above a compliance threshold. Regulation 3 substitutes the year-wise minimum-percentage RPO table in regulation 4 and the Schedule under sub-regulation (2A), which fixes minimum renewable purchase percentages for obligated entities including captive plants, leaving several later years to be specified by the Commission.
The substituted sub-regulation (2A) conditions (p4) set the consumption base for RPPO, the eligibility window and capacity share for HPO from large hydro and pumped storage, the treatment of state free power and Local Area Development Fund contributions, exclusion of hydro imported from outside India, cross-obligation flexibility, the dating of captive capacity augmentation, and a savings note preserving the RPO trajectory as revised from time to time.
Objections and suggestions are invited within thirty days of the notification, addressed to the Secretary at the Commission's Shimla office, with the text also on the Commission's website (p2).
Read with this
The regulation
Amendments and corrections
- Dated 3 Oct 2011Renewable Power Purchase Obligation and its Compliance (First Amendment) Regulations, 2011
- Dated 30 Mar 2016Renewable Power Purchase Obligation and its Compliance (Second Amendment) Regulations, 2016
- Dated 6 Dec 2017Renewable Power Purchase Obligation and its Compliance (Fourth Amendment) Regulations, 2017
- Dated 5 Feb 2020Renewable Power Purchase Obligation and its Compliance Regulations, 2010 — Sixth Amendment, 2020
- Dated 15 Jul 2021Renewable Power Purchase Obligation and its Compliance Regulations, 2010 — Seventh Amendment, 2021
Commencement notices and reasons
- Dated 19 Jun 2010Notification of Designated State Agency — RPO Regulations, 2010
- Dated 30 Sep 2010RPPO Applicability to Captive and Open Access Consumers, 2010 — Notification
- Dated 3 Oct 2011Renewable Power Purchase Obligation and its Compliance Regulations, 2010 — First Amendment, 2011 — Statement of Objects/Reasons
- Dated 30 Nov 2016Short/Medium Term PPA for SHPs under REC Mechanism, Himachal Pradesh
- Dated 27 Sep 2017Renewable Power Purchase Obligation and its Compliance Regulations, 2010 — Fourth Amendment, 2017 — Statement of Reasons
- Dated 27 Nov 2018Renewable Power Purchase Obligation and its Compliance (Fifth Amendment) Regulations, 2018 — Statement of Reasons
- Dated 5 Feb 2020Renewable Power Purchase Obligation and its Compliance (Sixth Amendment) Regulations, 2020 — Statement of Reasons
- Dated 15 Jul 2021Renewable Power Purchase Obligation and its Compliance Regulations, 2010 — Seventh Amendment, 2021 — finalisation order
Procedures and orders made under it
- Dated 23 Oct 2010Fixation of Fees and Charges for Accreditation of Renewable Energy Generation Project Order, 2010
- Dated 14 Aug 2015Fixation of Fees and Charges for Accreditation of Renewable Energy Generation Project Order, 2015
- Dated 8 Mar 2016Fixation of Fees and Charges for Accreditation of Renewable Energy Generation Project and Distribution Licensee Order, 2016
- Dated 30 Nov 2016RPO Compliance Formats for Captive Consumers
- Dated 17 Jul 2017Adjustment of Surplus/Shortfall of Renewable Energy Certificates or Renewable Energy w.r.t. RPO of FY 2016-17 in FY 2017-18 Order, 2017
Proposed changes (drafts with no final yet)
Earlier drafts
- Dated 11 Aug 2016Renewable Power Purchase Obligation and its Compliance Regulations, 2010 — Third Amendment, 2016 — Draft
- Dated 27 Sep 2017Renewable Power Purchase Obligation and its Compliance Regulations, 2010 — Fourth Amendment, 2017 — Draft
- Dated 23 Nov 2019Renewable Power Purchase Obligation and its Compliance (Sixth Amendment) Regulations, 2019 — Draft
3 more documents belong here and are not on Voltaic: 1 amendment, 1 commencement notice or statement of reasons and 1 procedure or order made under it.
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.