Skip to content

HPERC · Himachal Pradesh Electricity Regulatory Commission

Renewable Power Purchase Obligation and its Compliance (Seventh Amendment) Regulations, 2021 — Draft

Himachal Pradesh Electricity Regulatory Commission (Renewable Power Purchase Obligation and its Compliance) (Seventh Amendment) Regulations, 2021

Draft amendmentDated 3 Jun 2021No. HPERC/438 dated the 3rd June, 2021

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

HPERC's notification No. HPERC/438, dated 3 June 2021, publishes for public objection a draft Seventh Amendment to the Himachal Pradesh Electricity Regulatory Commission (Renewable Power Purchase Obligation and its Compliance) Regulations, 2010 (p1–2). The preamble grounds the amendment in para 6.4(1) of the revised Tariff Policy of 28 January 2016, the Ministry of Power office memorandum of 8 March 2019 that declared large hydro above 25 MW a renewable source and created a Hydro Purchase Obligation within non-solar RPO, and the Ministry of Power order of 29 January 2021 issuing an RPO trajectory that states may adopt (p1).

The draft itself has three operative regulations (p2–3). Regulation 1 names the regulations and makes them commence on publication in the Rajpatra. Regulation 2 substitutes the definition of "renewable energy sources" — small/mini/micro hydro up to 25 MW, wind, solar, biomass, bio-fuel cogeneration and municipal waste, with large hydro routed to HPO only and a limited cross-use against solar and non-solar obligations above a compliance threshold. Regulation 3 substitutes the year-wise minimum-percentage RPO table in regulation 4 and the Schedule under sub-regulation (2A), which fixes minimum renewable purchase percentages for obligated entities including captive plants, leaving several later years to be specified by the Commission.

The substituted sub-regulation (2A) conditions (p4) set the consumption base for RPPO, the eligibility window and capacity share for HPO from large hydro and pumped storage, the treatment of state free power and Local Area Development Fund contributions, exclusion of hydro imported from outside India, cross-obligation flexibility, the dating of captive capacity augmentation, and a savings note preserving the RPO trajectory as revised from time to time.

Objections and suggestions are invited within thirty days of the notification, addressed to the Secretary at the Commission's Shimla office, with the text also on the Commission's website (p2).

Standard name
RPO Regulations
Primary topics
Renewable purchase obligation (RPO / RCO)

Read with this

Proposed changes (drafts with no final yet)

3 more documents belong here and are not on Voltaic: 1 amendment, 1 commencement notice or statement of reasons and 1 procedure or order made under it.

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document