Renewable Power Purchase Obligation and its Compliance Regulations, 2010 — Seventh Amendment, 2021

Himachal Pradesh Electricity Regulatory Commission (Renewable Power Purchase Obligation and its Compliance) (Seventh Amendment) Regulations, 2021

AmendmentDated 15 Jul 2021No. HPERC-H(1)-438 dated the 15th July, 2021

Replaced by Renewable Power Purchase Obligation and its Compliance Regulations, 2023

See that regulation for the date it took effect and for anything it keeps in force.

Amends the Renewable Power Purchase Obligation and its Compliance Regulations, 2010.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Seventh Amendment to the Himachal Pradesh Electricity Regulatory Commission (Renewable Power Purchase Obligation and its Compliance) Regulations, 2010, issued by the Commission in Shimla on 15 July 2021 (p1). It has three operative provisions and comes into force on publication in the Himachal Pradesh Rajpatra; the Gazette date is not printed (p1).

Regulation 2 replaces clause (g) of Regulation 2 of the 2010 Regulations, rewriting the definition of "renewable energy sources" to list the eligible non-conventional sources and their capacity thresholds, and — the substantive change — to bring Large Hydro Projects above 25 MW, including pumped storage, commissioned on or after 8 March 2019, within the definition (p1). This is the hook for the new Hydro Power Purchase Obligation (HPO) that runs through the rest of the amendment.

Regulation 3 amends Regulation 4 in three ways. Sub-clause (a) substitutes the Table in sub-regulation (1), setting the year-wise minimum percentages for Solar RPO, Other Non-Solar RPO, HPO, Total Non-Solar RPO and Total RPO as a share of total consumption (p1–2). A set of lettered caveats follows: the RPPO base excludes certain consumption, HPO is to be met from large hydro including free power to the State, hydro imported from outside India cannot count toward HPO, and shortfalls can be offset by excess solar, hydro or other non-solar energy once 85% compliance is reached (p2–3).

Sub-clause (b) substitutes the Schedule under sub-regulation (2A), which does the same job for captive generating plants, keyed to the year the plant's original capacity was commissioned or augmented (p2–3). A Note saves any RPO trajectory the Commission specifies from time to time in regulations, schedules or other instruments (p3).

Sub-clause (c) amends sub-regulation (3): the word "and" in clause (ii) is omitted and a new clause (iv) is added so that renewable energy purchased from Power Exchange(s) counts (p3). The instrument is signed by the Secretary for the Commission (p3).

Standard name
RPO Regulations
Primary topics
Renewable purchase obligation (RPO / RCO), Power markets and exchanges

Read with this

Proposed changes (drafts with no final yet)

3 more documents belong here and are not on Voltaic: 1 amendment, 1 commencement notice or statement of reasons and 1 procedure or order made under it.

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document