HPERC · Himachal Pradesh Electricity Regulatory Commission
Renewable Power Purchase Obligation and its Compliance Regulations, 2010 — Seventh Amendment, 2021
Himachal Pradesh Electricity Regulatory Commission (Renewable Power Purchase Obligation and its Compliance) (Seventh Amendment) Regulations, 2021
AmendmentDated 15 Jul 2021No. HPERC-H(1)-438 dated the 15th July, 2021
Replaced by Renewable Power Purchase Obligation and its Compliance Regulations, 2023
See that regulation for the date it took effect and for anything it keeps in force.
Amends the Renewable Power Purchase Obligation and its Compliance Regulations, 2010.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Seventh Amendment to the Himachal Pradesh Electricity Regulatory Commission (Renewable Power Purchase Obligation and its Compliance) Regulations, 2010, issued by the Commission in Shimla on 15 July 2021 (p1). It has three operative provisions and comes into force on publication in the Himachal Pradesh Rajpatra; the Gazette date is not printed (p1).
Regulation 2 replaces clause (g) of Regulation 2 of the 2010 Regulations, rewriting the definition of "renewable energy sources" to list the eligible non-conventional sources and their capacity thresholds, and — the substantive change — to bring Large Hydro Projects above 25 MW, including pumped storage, commissioned on or after 8 March 2019, within the definition (p1). This is the hook for the new Hydro Power Purchase Obligation (HPO) that runs through the rest of the amendment.
Regulation 3 amends Regulation 4 in three ways. Sub-clause (a) substitutes the Table in sub-regulation (1), setting the year-wise minimum percentages for Solar RPO, Other Non-Solar RPO, HPO, Total Non-Solar RPO and Total RPO as a share of total consumption (p1–2). A set of lettered caveats follows: the RPPO base excludes certain consumption, HPO is to be met from large hydro including free power to the State, hydro imported from outside India cannot count toward HPO, and shortfalls can be offset by excess solar, hydro or other non-solar energy once 85% compliance is reached (p2–3).
Sub-clause (b) substitutes the Schedule under sub-regulation (2A), which does the same job for captive generating plants, keyed to the year the plant's original capacity was commissioned or augmented (p2–3). A Note saves any RPO trajectory the Commission specifies from time to time in regulations, schedules or other instruments (p3).
Sub-clause (c) amends sub-regulation (3): the word "and" in clause (ii) is omitted and a new clause (iv) is added so that renewable energy purchased from Power Exchange(s) counts (p3). The instrument is signed by the Secretary for the Commission (p3).
Read with this
The regulation
Amendments and corrections
- Dated 3 Oct 2011Renewable Power Purchase Obligation and its Compliance (First Amendment) Regulations, 2011
- Dated 30 Mar 2016Renewable Power Purchase Obligation and its Compliance (Second Amendment) Regulations, 2016
- Dated 6 Dec 2017Renewable Power Purchase Obligation and its Compliance (Fourth Amendment) Regulations, 2017
- Dated 5 Feb 2020Renewable Power Purchase Obligation and its Compliance Regulations, 2010 — Sixth Amendment, 2020
Commencement notices and reasons
- Dated 19 Jun 2010Notification of Designated State Agency — RPO Regulations, 2010
- Dated 30 Sep 2010RPPO Applicability to Captive and Open Access Consumers, 2010 — Notification
- Dated 3 Oct 2011Renewable Power Purchase Obligation and its Compliance Regulations, 2010 — First Amendment, 2011 — Statement of Objects/Reasons
- Dated 30 Nov 2016Short/Medium Term PPA for SHPs under REC Mechanism, Himachal Pradesh
- Dated 27 Sep 2017Renewable Power Purchase Obligation and its Compliance Regulations, 2010 — Fourth Amendment, 2017 — Statement of Reasons
- Dated 27 Nov 2018Renewable Power Purchase Obligation and its Compliance (Fifth Amendment) Regulations, 2018 — Statement of Reasons
- Dated 5 Feb 2020Renewable Power Purchase Obligation and its Compliance (Sixth Amendment) Regulations, 2020 — Statement of Reasons
- Dated 15 Jul 2021Renewable Power Purchase Obligation and its Compliance Regulations, 2010 — Seventh Amendment, 2021 — finalisation order
Procedures and orders made under it
- Dated 23 Oct 2010Fixation of Fees and Charges for Accreditation of Renewable Energy Generation Project Order, 2010
- Dated 14 Aug 2015Fixation of Fees and Charges for Accreditation of Renewable Energy Generation Project Order, 2015
- Dated 8 Mar 2016Fixation of Fees and Charges for Accreditation of Renewable Energy Generation Project and Distribution Licensee Order, 2016
- Dated 30 Nov 2016RPO Compliance Formats for Captive Consumers
- Dated 17 Jul 2017Adjustment of Surplus/Shortfall of Renewable Energy Certificates or Renewable Energy w.r.t. RPO of FY 2016-17 in FY 2017-18 Order, 2017
Proposed changes (drafts with no final yet)
Earlier drafts
- Dated 11 Aug 2016Renewable Power Purchase Obligation and its Compliance Regulations, 2010 — Third Amendment, 2016 — Draft
- Dated 27 Sep 2017Renewable Power Purchase Obligation and its Compliance Regulations, 2010 — Fourth Amendment, 2017 — Draft
- Dated 23 Nov 2019Renewable Power Purchase Obligation and its Compliance (Sixth Amendment) Regulations, 2019 — Draft
- Dated 3 Jun 2021Renewable Power Purchase Obligation and its Compliance (Seventh Amendment) Regulations, 2021 — Draft
3 more documents belong here and are not on Voltaic: 1 amendment, 1 commencement notice or statement of reasons and 1 procedure or order made under it.
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.