HPERC · Himachal Pradesh Electricity Regulatory Commission

Renewable Power Purchase Obligation and its Compliance (Sixth Amendment) Regulations, 2020 — Statement of Reasons

In the matter of draft amendment Regulations of the Himachal Pradesh Electricity Regulatory Commission (Renewable Power Purchase Obligation and its Compliance) (Sixth Amendment) Regulations, 2020.

Statement of reasonsDated 5 Feb 2020Published in the Gazette 26 Nov 2019

Replaced by Renewable Power Purchase Obligation and its Compliance Regulations, 2023

See that regulation for the date it took effect and for anything it keeps in force.

The commission's reasons for the Renewable Power Purchase Obligation and its Compliance Regulations, 2010 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Commission's Statement of Reasons for the HPERC (Renewable Power Purchase Obligation and its Compliance) (Sixth Amendment) Regulations — the explanatory record published alongside the amendment to the 2010 RPO Regulations (p1). It explains why the Commission is capping the RPO obligation of captive power plants rather than changing the RPO trajectory itself.

The trigger is a Ministry of Power clarification of 1 February 2019 on its 2016 and 2018 RPO trajectory orders, under which a CPP's RPO is pegged at the level applicable in the year the CPP was commissioned, with additional RPO only if new fossil-fuel capacity is added (p1). The Commission notes it had already raised the standby DG-set capacity limit from 1.00 MW to units exceeding 5 MVA (p3–4).

Pages 2–4 record the consultation: publication of the draft in the Rajpatra on 26 November 2019, a newspaper notice on 29 November 2019, and letters to stakeholders. The Directorate of Energy had no objection; B.B.N. Industries Association sought exemption of standby power from RPO (p2–3), and UltraTech Cement sought a lower solar RPO and exclusion of T&D losses from REC consumption (p3). The Commission rejects both, on the grounds that the present exercise is confined to capping CPP RPO, that solar RECs are available at the same floor price as non-solar, and that RPO is a corporate social responsibility (p3–4).

Page 5 sets out the operative content: past RPO trajectories substituted or repealed by earlier amendments remain applicable to obligated entities for their respective years, and a savings note is to be inserted below the table in regulation 4(1). The document is signed at Shimla on 5 February 2020.

Standard name
RPO Regulations
Primary topics
Renewable purchase obligation (RPO / RCO)

Read with this

Proposed changes (drafts with no final yet)

3 more documents belong here and are not on Voltaic: 1 amendment, 1 commencement notice or statement of reasons and 1 procedure or order made under it.

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.