Search the library
Filters
Topicclear
DistributionGeneral / AdministrativeRenewable EnergyTariff & PricingGrid OperationsOpen AccessLicensing & ComplianceTransmissionYear
Showing the best matches for “energy storage obligation”: 12 documents. There may be more. Add words, or choose a regulator or a type, to narrow the search.
The state and topic filters do not apply to a word search yet; the regulator, document type and year filters do.
BESS Regulations, 2025 — Statement of Reasons
- 1. Short Title, Commencement, and Applicability › 2. Definitions… Energy Storage, etc., within license area. The aggregators shall assist the DISCOMs, inter alia, in the promotion of Distributed Generation/storage like Solar Rooftop projects with/without storage for all categories of consumers by …
- Commission's analysis and decision… further observes that BESS can act as a critical enabler for renewable energy integration, and consumption of RE stored in BESS should retain its renewable character. To incentivise storage-backed RE consumption, …
3 matching passages in this document
Renewable Power Purchase Obligation (Compliance by Purchase of RE/REC) Regulation, 2022 — Statement of Reasons
- ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION › Introduction… the Terms and Conditions for Renewable Energy Certificate for Renewable Energy Generation Regulations, 2022 issued by CERC on 09.05.2022 and the MOP notification dated 22.07.2022 on the Renewable Purchase Obligation and Energy Storage …
- Commission's analysis and decisionCommission's analysis and decision Grid-Scale energy storage technology is still in its nascent stage and costly and will take time to mature. Therefore, it is too early to specify a Storage Purchase Obligation.
3 matching passages in this document
BESS Regulations, 2025 — Regulation 5
- ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION KURNOOL › 2. Definitions… laid down in the Andhra Pradesh Electricity Regulatory Commission (Green Energy Open Access, Charges, and Banking) Regulation, 2024 (Regulation No 3 of 2024) as amended from time to time. …
- ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION KURNOOL › 4. Ownership and Business Models… Renewable Energy Developers; An independent energy storage service provider Aggregators; Any other third-party investors. 4.2 BESS may be deployed as: Co-located with renewable or conventional generators; Grid-connected standalone …
3 matching passages in this document
Renewable Power Purchase Obligation Regulations, 2022 — First Amendment, 2023 — Consolidated
- 2. Definitions and Interpretation: In these Regulations, …'Hybrid Energy Sources' means two or more Renewable Energy Sources used together or any single Renewable Energy Source coupled with any Storage Technology (Battery and/or Pumped Storage utilising renewable energy to store energy, etc.) …
- 2. Definitions and Interpretation: In these Regulations, …… Pumped Hydro Storage utilising Renewable Energy, Municipal Waste, Industrial Waste, Biomass, Bagasse, Wind, Solar, Hybrid Energy Sources, biofuel cogeneration, Geo- thermal, Tidal and such other sources as recognized or approved by MNRE; …
3 matching passages in this document
Framework for Resource Adequacy Regulation, 2026 — Statement of Reasons
- 24. Timeline for Submission of State-specific Capacity … › Objections/views/comments… without considering fluctuating demand and existing PPAs ignores state obligations. Prayas (Energy Group) recommended that the Regulations also include compliance with the Energy Storage Obligation (ESO) targets notified by the Ministry …
- Generation Resource Parameters (Existing and Planned) › System Planning and Constraints… The RPO, including Energy Storage Obligation targets. Identified and listed constraints, such as penalties for unmet demand, forced outages, system emission limits defined by the State Grid Code and the Indian Electricity Grid Code, and …
3 matching passages in this document
Green Energy Open Access, Charges and Banking Regulation, 2024
Order dated 01-05-2024
Green Energy Open Access, Charges and Banking Regulation, 2024 — Consolidated (First and Second Amendments)
Framework for Resource Adequacy, 2026 — Regulation 04
- 9. Preparation of Generation Resource Planning › System Planning and Constraints… The RPO, including Energy Storage Obligation targets. Identified and listed constraints, such as penalties for unmet demand, forced outages, system emission limits defined by the State Grid Code and the Indian Electricity Grid Code, and …
- PART II EXTRAORDINARY › Introduction… envisages a substantial addition of renewable energy capacity, with a long-term target of up to 160 GW. The State has been facilitating the development of renewable energy projects and energy storage infrastructure, including Pumped …
2 matching passages in this document
RE Tariff Determination Regulation, 2025 — Statement of Reasons
- Annexure-1 List of Objectors › 2. Definitions and Interpretation… z) 'Renewable energy with storage project' means combination of renewable energy projects with storage or combination of renewable hybrid energy projects with storage at the same interconnection point; …
- Parameters for refuse-derived fuel (RDF) based municipal … › 71. Storage Efficiency… Provided that the minimum efficiency for storage based on the technology of solid-state batteries shall be 85%: (2) The efficiency of the storage component of renewable energy with storage project shall be measured as the ratio of output …
3 matching passages in this document
Green Energy Open Access, Charges and Banking Regulation, 2024 — First Amendment, 2025 — Statement of Reasons
Regulation 11 of 2025 — First Amendment
Amends the Regulation 6 of 2025