Search the library
Filters
Topic
DistributionGeneral / AdministrativeRenewable EnergyTariff & PricingGrid OperationsOpen AccessLicensing & ComplianceTransmissionYear
Showing the best matches for “energy storage obligation”: 17 documents. There may be more. Add words, or choose a regulator or a type, to narrow the search.
Renewable Energy Purchase Obligation Regulations, 2023
2 amendments on Voltaic
- 11. Power to remove difficulties.- › Annexure-I (Minimum percentage for Renewable Purchase …… The Energy Storage Obligation in para (10) above shall be calculated in energy terms as a percentage of total consumption of electricity and shall be treated as fulfilled only when at least 85% of the total energy stored in the Energy …
- 11. Power to remove difficulties.- › Annexure-I (Minimum percentage for Renewable Purchase …… The said MoP notification has redefined the RPO components besides adding energy storage obligation. The said notification also recommends the State Commissions to consider notifying the RPO trajectory including HPO and energy storage …
3 matching passages in this document
Renewable Energy Purchase Obligation Regulations, 2023 — Amendment, 2025
Amends the Renewable Energy Purchase Obligation Regulations, 2023
- 2. Amendment to the Regulation 4 of the Principal … › 4. Amendment to the Annexure-I of the Principal Regulations… "Annexure-I (Minimum percentage for Renewable Purchase Obligation) (1) Every obligated entity as mandated in the Regulation 3 shall purchase energy from renewable energy sources under the Renewable Purchase Obligation (RPO) …
- TAMIL NADU GOVERNMENT GAZETTE › Statements showing existing provisions and provisions as …… HPO obligation of the State/Distribution Provided further that in case of distributed renewable Licensee may be met out of the free power energy installations installed by various prosumers in the being provided to the State from Hydro …
3 matching passages in this document
State Load Dispatch Centre Functions and Accountability Regulations, 2026
Framework for Resource Adequacy Regulations, 2025
- Part VI—Section 2 › 14. Procurement Resource Mix… The power capacity procurement from renewable energy sources for fulfilling the RPO targets shall be carried out as per Tamil Nadu Electricity Regulatory Commission (Renewable Energy Purchase Obligation) Regulations, 2023 and amendments …
- Part VI—Section 2 › 4. Definitions… storage systems for energy shift, and demand response measures for managing the intermittency and variability of renewable energy sources. x. "Resource Adequacy Requirement" or "RAR" shall mean the requirement of resource capacity to be …
2 matching passages in this document
Tamil Nadu Electricity Grid Code, 2026
- 9.3. Data to be furnished prior to notice of Trial Run › (b) Primary Control… second for generating stations and energy storage systems and ten (10) seconds for the State control area. (xv) The SRLDC shall calculate actual frequency response characteristics of all the control areas within its region. …
- NOTIFICATIONS BY HEADS OF DEPARTMENTS, ETC. › 2.1. Glossary and Definitions… means the state in which one or more operational parameters are 68 Energy Storage System (ESS) in relation to the electricity system, means a facility where electrical into the grid. …
3 matching passages in this document
Procedure for Grant of Connectivity to the Distribution System, 33 kV and below — under Grid Connectivity and Intra State Open Access Regulations, 2014
Terms and Conditions for Green Energy Open Access Regulations, 2025
Tamil Nadu Electricity Supply Code — Consolidated as amended up to 31-03-2024
Procedure for Grant of Connectivity to the Intra-State Transmission System
Terms and Conditions for Determination of Tariff Regulations, 2005
10 amendments on Voltaic
RE Curtailment Management Procedure for Wind and Solar Generation, 2024
Tamil Nadu Electricity Supply Code, 2004 — Amendments, 2023
Amends the Tamil Nadu Electricity Supply Code (TNESC)
Tamil Nadu Electricity Grid Code
Replaced byTamil Nadu Electricity Grid Code, 2026Grid Interactive Solar PV Energy Generating Systems (GISS) Regulations, 2021
Terms and Conditions for Determination of Tariff Regulations, 2005 — Consolidated as amended up to 31-12-2010
Terms and Conditions for Determination of Tariff Regulations, 2005 — Republished as amended upto 31-12-2009
Battery Energy Storage Systems Regulations, 2026 — Draft
Draft- 2. Objectives › 3.0 Definitions… 16 --> the supply and delivery of electrical energy and/or storage capacity from a Battery Energy Storage System, including obligations relating to charging, discharging, availability, scheduling, and performance, on agreed technical and …
- 15.3 Tariff Structure… reference to cost-plus principles, prevailing market benchmarks, charging energy arrangements, operational characteristics of the BESS, storage duration, cycling profile, dispatch obligations and such other factors as may be considered …
2 matching passages in this document