TNERC · Tamil Nadu Electricity Regulatory Commission

Tamil Nadu Electricity Supply Code — Consolidated as amended up to 31-03-2024

Tamil Nadu Electricity Supply Code (TNESC)

Consolidated copyDated 31 Mar 2024Published in the Gazette 1 Sep 2004TNERC / SC / 7 / 1 dated 21.07.2004

A consolidated copy of the Tamil Nadu Electricity Supply Code (TNESC), published by TNERC for reference. It may not include the latest amendments; read it with the amendments listed for the regulation.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software, from pages 1 to 20 of 93. Check the regulator's original before you rely on it.

This is TNERC's consolidated Tamil Nadu Electricity Supply Code, presented as amended up to 31-03-2024. Pages 1–7 are a consolidation history: 49 notifications from the principal SC/7/1 of 21-07-2004 to SC/7-48 of 02-09-2023, with notification dates, gazette details where printed, a short description of each change and the regulations amended (pp1–7). The operative code begins at p8 under the 2004 notification, made under s.50 read with s.181 of the Electricity Act 2003 (p8).

Chapter 1 (pp8–10) is preliminary: short title and commencement on Gazette publication, plus definitions used across the Code—consumer categories, connected/contracted load and demand, consumer meter card, distribution licensee, engineer, power factor, supply and unauthorised use of electricity. Chapter 2 (pp10–20) covers electricity charges, billing and recovery. Regulation 3 sets out categories of supply by phase, wire and voltage/demand bands, conditions for LT supply above 112 kW up to 150 kW, conversion between voltage levels and a technical-feasibility relaxation where 33 kV network is absent (pp10–12). Regulation 4 lists charges recoverable: tariff charges, wheeling/network charges, HT demand/LT fixed charges, power-factor disincentive, current-harmonic penalty, electricity tax and miscellaneous charges; the harmonic-control regime applies to 11 kV/22 kV/33 kV and above consumers, prosumers and charging stations, with measurement, notice, penalty and disconnection steps (pp12–16). Regulation 5 then deals with capacitor compensation charges and excess demand charges, including HT double-rate treatment, LT exemptions and thresholds, repeated excess-demand occurrences, sanctioned-demand revision, regularization and conversion to HT (pp16–20). The text shows historical and current provisions side by side, with amendment notes and effective dates, so a user must read the boxes and footnotes.

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, Billing and payment, Connection and miscellaneous charges

Read with this

The regulation

Amendments and corrections

Consolidated copies, for reference (3)

Earlier drafts

32 more documents belong here and are not on Voltaic: 30 copies in another language, 1 corrigendum not held as English text and 1 draft or notice on a draft.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗