Proposed Amendments to Regulations for Implementation of the Maharashtra Renewable Energy and Energy Storage Policy, 2025-26 to 2035-36 — Explanatory Memorandum
Draft- 3.1 Vision and Guiding Strategies… It also marks a shift from simply adding renewable energy projects to building reliable, storage-backed clean energy systems. The state has set a target of meeting 65% of its electricity demand through renewable energy, supported by …
- 3.2 Need for Regulatory Review… changes aim to support the policy's target of achieving 65% renewable energy and 10% Energy Storage Obligation (ESO) by FY 2035-36. The focus areas include enabling smooth policy implementation, addressing gaps in existing regulations, …
3 matching passages in this document
Public Notice — Extension of Last Date for Comments, Objections and Counter Submissions on Draft Regulations
DraftMulti Year Tariff Regulations 2015 — Discussion Paper (FY 2016-17 to FY 2019-20)
Draft- 4.4 Hydel Generating Stations › 4.4.2 Norms of Operation for Hydel Generating Stations… Beneficiaries shall be entitled to energy equivalent to 75% of the energy utilized in pumping the water from the lower elevation reservoir to the higher elevation reservoir, from the generating Station during peak hours and the …
- 47.1 For Existing Stations › 50 Pumped Storage Hydro Generating Stations… 50.4 The capacity charge payable to a pumped storage hydel generating Station for a calendar month shall be: (AFC x NDM / NDY) (in Rupees), if actual Generation during the month is >= 75 % of the Pumping Energy consumed by the Station …
3 matching passages in this document
Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — First Amendment, 2023 — Explanatory Memorandum — Draft
Draft- 4 Petition Seeking Removal of Difficulties in … › Issue 1: Offsetting evening peak with banked energy… installation so that such consumers may be encouraged to store excess energy in energy storage system and use it during peak time slots. The Commission has stated as under in the above-said Order: …
- 4 Petition Seeking Removal of Difficulties in … › Issue 1: Offsetting evening peak with banked energy… energy consumed during peak hours is settled with the energy generated during peak hours. However, any surplus banked energy is allowed to be adjusted against off-peak hours. This automatically incentivises the prosumer to install energy …
3 matching passages in this document
Distribution Open Access Regulations, 2015 — Draft
Draft- MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (DISTRIBUTION … › INDEX… Energy Losses 41 Part F: IMBALANCE AND REACTIVE ENERGY CHARGES 42 23. Imbalance Charge 42 24. Banking of Renewable Energy generation 46 25. Reactive Energy Charge 47 Part G: COMMERCIAL MATTERS 48 26. Billing, Collection and Disbursement …
- 24. Banking of Renewable Energy generation › Illustration: Energy banked duringProvided that such deemed purchase may be counted towards the Renewable Purchase Obligation of the Distribution Licensee, at its option, in which case the Generating Station would not be entitled to Renewable Energy Certificates to that …
3 matching passages in this document
Electricity Supply Code and Other Conditions of Supply Regulations, 2015 — Draft
Draft- Hearing in case of suspected theft › Assessment8.25 Where it is established that there is a case of theft of energy based on the consumer's reply/hearing, the Authorised Officer shall assess the energy consumption as per the assessment formula given in Annexure 11.18 to this Code, …
- 6. METERING › Requirement of Meters… The meters shall have a facility for "Time of the Day" metering and storage of at least forty five (45) days. The consumer shall have the option to install meter having facility to record peak hours MDI in addition to above features; (3) …
3 matching passages in this document
Draft Electricity Supply Code and Standards of Performance of Distribution Licensees including Power Quality Regulations, 2020 — Explanatory Memorandum
Draft- 2. Title, extent of applicability and commencement › 3. Definitions… at the central location or intermediate location or any other Data Storage Device;" 3.2.2.The definition of "Clearance(s)" as contained in the existing SOP Regulations, 2014 is proposed to be modified to expand the term to include the …
- 2. Title, extent of applicability and commencement › from network of Licensee at High Voltage; or… has modified the definition of 'Meter' to include Net Meter and Special Energy Meter in the existing definition. In view of the said addition of terms, it is also proposed to add the definition of 'Net Meter' as per MERC Rooftop …
3 matching passages in this document
Electricity Supply Code and Standards of Performance of Distribution Licensees including Power Quality Regulations, 2020 — Draft
Draft- 2. Definitions… used to measure and/or record and store the amount of electrical energy supplied or the quantity of electrical energy contained in the supply, in a given time, which includes whole current meter and metering equipment, such as current …
- 2. Definitions… at the central location or intermediate location or any other Data Storage Device; f. "Average Power Factor" means- (i) the ratio of kilowatt hours consumed in the month to root of sum of squares of kilowatt hours consumed in the month & …
3 matching passages in this document
Draft Demand Flexibility and Demand Side Management Regulations, 2024 — Explanatory Memorandum
Draft· finalised as Demand Flexibility and Demand Side Management Regulations, 2024Explanatory Memorandum on Draft Multi Year Tariff Regulations, 2024
Draft· finalised as Multi Year Tariff Regulations, 2024- LIST OF ABBREVIATIONS… DRE Distributed Renewable Energy DSM Deviation and Settlement Mechanism EA 2003 Electricity Act 2003 ECR Energy Charge Rate EE Energy Efficiency ESO Energy Storage Obligations ESS Energy Storage Service ESSD Energy Storage Service …
- 11 Norms and Principles for determination of determination … › 11.2 Energy Storage Obligation11.2 Energy Storage Obligation 11.2.1 A long-term trajectory for Energy Storage Obligations (ESO) has also been notified by the Ministry of Power on 22 July 2022 to ensure that sufficient storage capacity is available with obligated …
2 matching passages in this document