EXPLANATORY MEMORANDUM ON DRAFT MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (GRID INNTERACTIVE ROOFTOP RENEWABLE ENERGY GENERATING SYSTEMS) (FIRST AMENDMENT) REGULATIONS, 2023

Explanatory memorandum to a draftReleased with the notice dated 5 Aug 2023

Draft

Voltaic holds no final regulation made from this draft.

Explanatory memorandum to the Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — First Amendment, 2023 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Commission's explanatory memorandum for the draft First Amendment to the MERC (Grid Interactive Rooftop Renewable Energy Generating Systems) Regulations, 2019, issued in August 2023 (p1). It explains why each proposed change is needed; it is not the amendment itself and quotes only the clauses being changed.

Chapter 1 sets the background: the Commission's RE tariff, RPO and rooftop regulations of 2019, national RE targets, and the MoP letter of 13 September 2022 asking ERCs to align their regulations with the Electricity (Rights of Consumers) Rules, 2020 (p3–5). Chapter 2 explains the alignment with the 2020 Rules: a new 'Prosumer' definition while retaining 'Eligible Consumer', a statement that a prosumer keeps consumer status, and a compensation provision where the distribution licensee delays the connectivity process (p5–7). Chapter 3 turns to the First Amendment Rules of 2021. It explains the need to distinguish gross metering from net billing, proposes definitions and a gross metering connection agreement, revises the 'Eligible Consumer' definition with capacity limits (1 MW for net metering; contract demand or sanctioned load for other arrangements), extends references to gross metering across the regulations, adjusts metering and annexure provisions, and inserts a model Gross Metering Connection Agreement (p8–19). It also revises the net-billing definition and provides energy accounting and billing settlement provisions (p17–18).

Chapter 4 records the petition of Shri R.B. Goenka in Case No. 140 of 2022 and the Commission's order of 25 November 2022. It examines four issues. For banking/ToD settlement, load factor incentive and capacity/hosting limits, it concludes that no amendment is needed (p20–24). For cash settlement of accumulated net-metering credit, it reviews discom data and proposes a proviso splitting the accumulated credit between cash and bill credit after three years of continuous increase (p26–28).

Standard name
Net Metering and Rooftop Solar
Primary topics
Net metering, Gross metering, Net billing

Read with this

Other copies of these documents (1)

Proposed changes (drafts with no final yet)

10 more documents belong here and are not on Voltaic: 5 drafts or notices on a draft not held as English text, 4 drafts or notices on a draft and 1 copy in another language.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document