MERC · Maharashtra Electricity Regulatory Commission
Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — First Amendment, 2023 — Explanatory Memorandum — Draft
EXPLANATORY MEMORANDUM ON DRAFT MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (GRID INNTERACTIVE ROOFTOP RENEWABLE ENERGY GENERATING SYSTEMS) (FIRST AMENDMENT) REGULATIONS, 2023
Explanatory memorandum to a draftReleased with the notice dated 5 Aug 2023
Draft
Voltaic holds no final regulation made from this draft.
Explanatory memorandum to the Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — First Amendment, 2023 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Commission's explanatory memorandum for the draft First Amendment to the MERC (Grid Interactive Rooftop Renewable Energy Generating Systems) Regulations, 2019, issued in August 2023 (p1). It explains why each proposed change is needed; it is not the amendment itself and quotes only the clauses being changed.
Chapter 1 sets the background: the Commission's RE tariff, RPO and rooftop regulations of 2019, national RE targets, and the MoP letter of 13 September 2022 asking ERCs to align their regulations with the Electricity (Rights of Consumers) Rules, 2020 (p3–5). Chapter 2 explains the alignment with the 2020 Rules: a new 'Prosumer' definition while retaining 'Eligible Consumer', a statement that a prosumer keeps consumer status, and a compensation provision where the distribution licensee delays the connectivity process (p5–7). Chapter 3 turns to the First Amendment Rules of 2021. It explains the need to distinguish gross metering from net billing, proposes definitions and a gross metering connection agreement, revises the 'Eligible Consumer' definition with capacity limits (1 MW for net metering; contract demand or sanctioned load for other arrangements), extends references to gross metering across the regulations, adjusts metering and annexure provisions, and inserts a model Gross Metering Connection Agreement (p8–19). It also revises the net-billing definition and provides energy accounting and billing settlement provisions (p17–18).
Chapter 4 records the petition of Shri R.B. Goenka in Case No. 140 of 2022 and the Commission's order of 25 November 2022. It examines four issues. For banking/ToD settlement, load factor incentive and capacity/hosting limits, it concludes that no amendment is needed (p20–24). For cash settlement of accumulated net-metering credit, it reviews discom data and proposes a proviso splitting the accumulated credit between cash and bill credit after three years of continuous increase (p26–28).
Read with this
The regulation
Amendments and corrections
Commencement notices and reasons
- Dated 30 Dec 2019Grid Interactive Rooftop RE Regulations, 2019 — Statement of Reasons
- Dated 16 Nov 2023Grid Interactive Rooftop Renewable Energy Generating Systems (First Amendment) Regulations, 2023 — Statement of Reasons
- Dated 29 Aug 2024Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — Second Amendment, 2024 — Statement of Reasons
Procedures and orders made under it
Other copies of these documents (1)
Proposed changes (drafts with no final yet)
- Released with the notice dated 5 Aug 2023Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — First Amendment, 2023 — Draft
- Dated 5 Aug 2023Public notice: Public Notice — Comments on Draft Open Access, Rooftop Renewable and RPO/REC Amendment Regulations, 2023
- Dated 24 Aug 2023Notice extending the date for comments: Public Notice — Extension of time for comments on Draft Regulations, August 2023
Earlier drafts
- Released with the notice dated 23 May 2024Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — Second Amendment, 2024 — Draft
- Released with the notice dated 23 May 2024Explanatory memorandum: Grid Interactive Rooftop Renewable Energy Generating Systems, 2019 — Second Amendment, 2024 — Explanatory Memorandum
- Dated 23 May 2024Public notice: Public Notice Inviting Comments on Draft Supply Code and Rooftop Renewable Energy Amendment Regulations, 2024
10 more documents belong here and are not on Voltaic: 5 drafts or notices on a draft not held as English text, 4 drafts or notices on a draft and 1 copy in another language.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.