Showing the best matches for “T-GNA corridor allocation”: 11 documents. There may be more. Add words, or choose a regulator or a type, to narrow the search.
Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022 — Consolidated
- 35. Information about applications under T-GNAOnce the day ahead schedule is finalised for the GNA grantees, schedule for T-GNA grantees under Advance application category of T-GNA shall be finalised over the balance transmission corridor. …
- 35. Information about applications under T-GNAChapter 7 Allocation of Transmission Corridor under GNA and T-GNA
3 matching passages in this document
Gujarat Electricity Grid Code, 2026
- 10.7. Minimum turndown level for Intra-State generating … › 10.12. Procedure for Scheduling and Despatch for …Other drawee T-GNA grantees, who are Regional Entities, shall furnish time block-wise requisition for drawl to RLDC in accordance with contracts by 9:00 AM of 'D-1' day. (iii) Allocation of corridors by RLDC for T-GNA grantees: …
- 10.7. Minimum turndown level for Intra-State generating … › 10.12. Procedure for Scheduling and Despatch for …Allocation of corridors by RLDC for GNA grantees: (i) SLDC shall check if drawl schedules as requisitioned by drawee GNA grantees can be allowed based on available transmission capability: …
3 matching passages in this document
Himachal Pradesh Electricity Grid Code Regulations, 2026
- (F) Allocation of corridors by NRLDC for GNA grantees.-The SLDC on behalf of intra-State entities which are T-GNA grantees, shall furnish time block-wise requisition for drawl, to the NRLDC in accordance with contracts by 9.15 AM of "D-1" day. (III) Allocation of corridors by NRLDC for T-GNA …
- (F) Allocation of corridors by NRLDC for GNA grantees.- › (G) Requisition of schedule by T-GNA grantees.--… the available transmission corridor shall be allocated to the T-GNA grantees in proportion to their T-GNA. (IV) NRLDC shall issue final drawl schedules for T-GNA grantees by 9.45 AM of "D-1" day. …
3 matching passages in this document
Sikkim Electricity Grid Code Regulations, 2025
- 7.9. Procedure for Scheduling and Despatch Timelines for …… Allocation of corridors by RLDC for GNA grantees as per IEGC. i. RLDC will check if drawal schedules as requisitioned by drawee GNA grantees can be allowed based on available transmission capability: …
- 7.9. Procedure for Scheduling and Despatch Timelines for …Provided that incase of constraint in transmission system, the available transmission corridor shall be allocated to the T-GNA grantees in proportion to their T-GNA.
3 matching passages in this document
State Grid Code, 2020 — First Amendment Regulations, 2026
Amends the State Grid Code Regulations, 2020
- 5. Amendment to Regulation 50.2.1 and 50.2.2 of the … › 52.5 Scheduling and Despatch Procedure and timelines for …… SLDC will run a Pilot look-ahead SCED considering the central allocation, allocated reserve considering SCUC. j) By 0800 hrs every day, based on the entitlement declared in accordance with the provisions of IEGC, 2023, SLDC or GNA …
- 5. Amendment to Regulation 50.2.1 and 50.2.2 of the … › 52.5 Scheduling and Despatch Procedure and timelines for …… day for the "D" day and update the availability of balance transmission corridors, if any, after finalisation of schedules for exigency applications on its website. The balance transmission corridor may be utilised by GNA grantees by way …
3 matching passages in this document
Electricity Grid Code Regulations, 2024
- 8.6 Rules for revision in schedule › 8.6.1 Curtailment of scheduled transactions for grid …… it becomes inevitable to curtail power flow on a transmission corridor, the transactions already scheduled may be curtailed with immediate effect by the SLDC (in co-ordination with Regional Load Despatch Centre, as applicable) …
- CHAPTER 8SCHEDULE AND DESPATCH CODE › 8.5 Scheduling Process… The balance transmission corridor may be utilised by way of revision of schedule, under any contract within its GNA or for exigency applications or in real time market on first-come-first-served basis. 8.5.19 Scheduling of transactions …
3 matching passages in this document
Connectivity and General Network Access to Intra-State Transmission and State Distribution System Regulations, 2026 — Draft
Draft- Commercial Matters › 34 Scheduling and Metering… Exigency applications for grant of T-GNA received till 13:00 hrs of 'S-1' day or such time as specified in the State Grid Code, shall be allocated the transmission corridor. 33.5 After the allocation of transmission corridors under …
- 33 Allocation of Transmission Corridor under GNA and T-GNA …Chapter 7 # 33 Allocation of Transmission Corridor under GNA and T-GNA Allocation of Transmission Corridor 30.4 SLDC may revise the quantum or period of the Standing Clearance issued in respect of any T-GNA grantee only in case of …
3 matching passages in this document
Gujarat Electricity Grid Code, 2026 — Draft
DraftHimachal Pradesh Electricity Grid Code Regulations, 2025 — Draft
DraftMeghalaya Terms and Conditions of Open Access Regulations, 2026 — Draft
DraftProposed Amendments to Regulations for Implementation of the Maharashtra Renewable Energy and Energy Storage Policy, 2025-26 to 2035-36 — Explanatory Memorandum