Skip to content

CERC · Central Electricity Regulatory Commission

Terms and Conditions of Tariff Regulations, 2024 — Draft

Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024

Draft regulationDated 4 Jan 2024No.L-1/268/2022/CERC dated 4 th January, 2024

Draft

A proposal that has since been finalised as the Terms and Conditions of Tariff Regulations, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The CERC issued this draft notification on 4 January 2024 to make the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024 (p1). It is the principal tariff regulation for the 2024–29 control period: it comes into force on 1.4.2024 and remains in force for five years to 31.3.2029 unless reviewed earlier or extended (p1). It is made under section 178 read with section 61 of the Electricity Act, 2003 (p1). It applies to tariff for generating stations and transmission systems that CERC determines under section 62 read with section 79, and excludes tariff discovered through section 63 competitive bidding and renewable energy tariffs determined under the 2020 RE tariff regulations (p2).

Chapter 1 (pp1–19) contains definitions and interpretation for the whole framework, including capital cost, additional capitalisation, date of commercial operation, emission control system, integrated mine, input price, useful life, force majeure and change in law. Chapter 2 (pp20–21) specifies how the date of commercial operation is fixed for stations, transmission and integrated mines, and treats infirm power and pre-COD supply of coal or lignite from an integrated mine. Chapter 3 (pp22–31) sets the procedure for tariff determination: the filings required, timelines, interim and final tariff, supplementary tariff for emission control systems, input-price petitions, and truing up for 2019–24 and 2024–29.

Chapter 4 (pp32–34) sets the tariff structure: two-part capacity and energy charges for thermal, capacity and energy charges for hydro, transmission charges for ISTS, and separate supplementary capacity and energy charges for emission control systems. Chapter 5 (pp35–36) specifies the capital structure, principally the debt-equity ratio. Chapter 6 (pp37–47) governs computation and prudence check of capital cost, including IDC and IEDC, controllable and uncontrollable factors, and initial spares. Chapter 7 (pp48–56) covers additional capitalisation within and beyond original scope, before and after cut-off, renovation and modernisation, special allowance for coal/lignite stations, and revised emission standards.

Chapter 8 (pp57–77) provides for computation of annual fixed cost: return on equity and tax, interest on loan, depreciation, interest on working capital, decommissioning, and normative O&M expenses for thermal, hydro and transmission systems. Chapter 9 (pp78–99) is a self-contained code for the input price of coal or lignite from integrated mines: ROM cost, additional charges, capital cost, additional capital expenditure, annual extraction cost, capital structure, depreciation, O&M, working capital, mine closure, determination and recovery of input price, overburden/GCV/non-tariff-income adjustments, credit adjustment notes and quality measurement. Chapter 10 (pp100–102) specifies energy charge components: landed fuel cost, transit and handling losses, GCV of primary fuel, and landed cost of reagent.

Chapter 11 (pp103–124) gives formulae and payment mechanics for capacity and energy charges for thermal stations, supplementary charges for emission control systems, hydro and pumped-storage stations, transmission and communication systems, and deviation charges. Chapter 12 (pp125–141) sets operational norms for thermal, hydro, pumped-storage and transmission systems: availability factors, plant load factor for incentive, station heat rate, secondary fuel oil consumption, auxiliary energy consumption, reagent consumption and transmission availability. Chapter 13 (pp142–146) covers scheduling, metering, billing, sharing of transmission charges, rebate and late payment surcharge. Chapter 14 (pp147–150) provides for sharing of gains from controllable norms, refinancing savings, non-tariff income, clean development mechanism benefits and other business income. Chapter 15 (pp150–158) contains miscellaneous provisions, including ceiling norms and tariff, deferred tax, hedging and foreign exchange variation, arbitration awards, non-ISTS lines carrying inter-State power, fees, special provisions for NLC, DVC, BBMB/SSP and certain projects, competitive bidding, and powers to relax, remove difficulty and issue practice directions.

Appendices I–V (pp159–172) provide depreciation schedules for existing projects, new projects and integrated mines, and the procedure and formulae for calculating transmission system availability.

Standard name
Tariff Regulations
Primary topics
Tariff determination, Multi Year Tariff (MYT), Generation tariff

Read with this

The regulation

Commencement notices and reasons

Other copies of these documents (3)

Earlier drafts

4 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document