Terms and Conditions of Tariff (Second Amendment) Regulations, 2026

Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (Second Amendment) Regulations, 2026

Amendment · Gazette copyDated 20 Mar 2026Published in the Gazette 10 Apr 2026F. No. L-1/268/2022/CERC dated 20th March, 2026

The Gazette copy of the Terms and Conditions of Tariff Regulations, 2024 — Second Amendment, 2026.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software, from pages 1 to 63 of 65. Check the regulator's original before you rely on it.

This is the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (Second Amendment) Regulations, 2026 (pp1, 33). Notified on 20 March 2026 (p33) and published in the Gazette on 10 April 2026 (p1), it amends the CERC (Terms and Conditions of Tariff) Regulations, 2024 (the Principal Regulations) to bring integrated energy storage systems (ESS) co-located with coal/lignite/gas thermal generating stations or inter-state transmission systems into the regulated tariff framework (pp33–41). The readable English text runs pp33–54, followed by two filing-form appendices, pp55–63.

Regulations 1–4 (pp33–35) set the short title and commencement, make the amendments to Regulations 51 and 52 retrospective from 1.4.2024, extend the Principal Regulations to ESS, and insert definitions for the integrated ESS, battery cell, battery cycle, C-rate, COD(ess), DC(ess), MCR(ess), PAFess, rated capacity, round-trip efficiency and state of charge. Regulations 5–21 (pp35–41) amend the application, capital-cost and supplementary-tariff provisions: ESS capital expenditure is brought into additional capitalisation, supplementary tariff petitions are to be filed within a prescribed period after commercial operation, and new Regulations 29A and 29B lay down the consultation and in-principle approval route for ESS at existing generating stations and transmission systems, with an exception for viability-gap-funded projects.

Regulations 22–32 (pp41–46) deal with financial norms — return on equity, related-party loans, depreciation, working capital, O&M expenses and integrated mines. Regulations 33–47 (pp46–52) amend coal/lignite mining provisions, prescribe the supplementary capacity and energy charge methodologies for ESS, insert operating norms for ESS, provide for dispatch and first right of discharge, and add sharing-of-gains rules and a regulatory sandbox. Regulations 48–51 and Appendices A and B (pp52–63) amend depreciation schedules, element definitions and the thermal and transmission tariff filing forms to capture ESS data. The document matters because it creates a separate supplementary tariff and cost-recovery route for storage attached to regulated thermal and transmission assets.

Standard name
Tariff Regulations
Primary topics
Tariff determination, Energy storage deployment, Capital cost and investment

Read with this

The regulation

Commencement notices and reasons

Other copies of these documents (2)

Earlier drafts

4 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document