Skip to content

CERC · Central Electricity Regulatory Commission

Terms and Conditions of Tariff (Second Amendment) Regulations, 2025 — Draft

Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (Second Amendment) Regulations, 2025

Draft amendmentDated 1 Dec 2025No. L-1/236/2018/CERC dated 1st December, 2025

Draft

A proposal that has since been finalised as the Terms and Conditions of Tariff Regulations, 2024 — Second Amendment, 2026.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a CERC draft notification dated 1 December 2025 proposing the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (Second Amendment) Regulations, 2025. Its main purpose is to bring integrated energy storage systems (ESS) co-located with coal-, lignite- or gas-based generating stations and inter-state transmission systems into the CERC tariff framework (p1). The regulations would commence on Gazette notification, except amendments to Regulations 51 and 52, which would apply from 1.4.2024 (p1).

Clauses 2–4 insert the application rule and a set of ESS-specific definitions — declared capacity, round-trip efficiency, auxiliary consumption, state of charge and related terms (pp1–3). Clauses 5–14 create a supplementary tariff route for integrated ESS, separate from the main station or transmission tariff, covering supplementary fixed storage charges and energy charges, filing requirements and additional capitalisation (pp3–6). Clauses 15–20 deal with capital cost, initial spares and approval procedures for ESS added to existing generating stations and transmission systems, including sharing proposals with beneficiaries, CTU and RLDC (pp6–8).

Clauses 21–36 amend financial and operating norms: return on equity, related-party borrowing, depreciation, working capital, O&M, and pass-through of coal-mining and ash-transportation costs (pp8–13). Clauses 37–46 set the computation of supplementary capacity and energy charges, charging sources, incentive for excess discharge, norms of operation, scheduling and dispatch, and sharing of gains from storage services (pp13–18). Clause 47 introduces a regulatory sandbox provision with a cost-recovery cap (p18). Clauses 48–50 and Appendices A and B amend availability formulae and the thermal and transmission tariff filing forms to add ESS line items and parameters (pp18–30). The draft also carries non-ESS amendments on integrated mines, OB adjustment, GCV adjustment and ash transportation.

Standard name
Tariff Regulations
Primary topics
Tariff determination, Energy storage deployment, Generation tariff

Read with this

The regulation

Commencement notices and reasons

Other copies of these documents (3)

Earlier drafts

4 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document