Skip to content

CERC · Central Electricity Regulatory Commission

Terms and Conditions of Tariff Regulations, 2024 — First Amendment, 2025

Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (First Amendment) Regulations, 2025

AmendmentDated 4 Feb 2025In force from 1 Apr 2024No. L-1/268/2022/CERC

Amends the Terms and Conditions of Tariff Regulations, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a Central Electricity Regulatory Commission notification dated 4 February 2025 that makes the first set of amendments to the CERC (Terms and Conditions of Tariff) Regulations, 2024 — the instrument under which the Commission determines tariffs for the generating stations it regulates (p1). It is made under section 178 read with section 61 of the Electricity Act, 2003, and it states that it comes into force from 1.4.2024, i.e. retrospectively, well before the date it was signed (p1).

The first block of changes is about the money benchmark. Paragraph 2 inserts a definition of "Bank Rate" into Regulation 3, being the one-year SBI marginal cost of lending rate or its replacement plus 100 basis points (p1). Paragraphs 3 and 5 then replace the older "1-year SBI MCLR plus 100 basis points" wording with "the bank rate" in the specified sub-regulations of Regulations 9, 10 and 37 (p1–3).

The next block touches cost recovery. Paragraph 4 changes the self-insurance premium factor in Regulation 36 and adds a proviso requiring the self-insurance premium to be held in a separate fund, usable for claims and reportable to the Commission on demand (p2). Paragraph 5 rewrites the proviso to Regulation 37(2) so that a generating company may ask for an interim input price for coal, which the Commission may allow up to 90% of the claimed price after the first hearing, with the difference trued up later (p2). Paragraph 6 shifts the benchmark for obtaining prior consent of beneficiaries from Coal India's notified price to the price of alternative coal available to the station, and adds an explanation of what counts as alternative coal (p3).

Paragraph 7 substitutes Regulation 51 outright with a new overburden-removal adjustment regime: removal as per the Mining Plan, a formula-based adjustment for shortfall or excess, treatment where a Mine Developer and Operator is engaged, carry-forward of non-attributable excess beyond the tariff period to 31.3.2029, and an exclusion for integrated mines allotted through auction under the Coal Mines (Special Provisions) Act, 2015 (p3–5). Paragraphs 8 and 9 are narrow corrections — a substituted reference in Regulation 55 and a clause cross-reference in Regulation 64 (p5).

The largest change is Paragraph 10, which amends Regulation 70: it adjusts the scope wording in 70(A) and 70(B), corrects an auxiliary consumption figure for Chandrapur TPS in the 70(E) table, and adds a new Clause (G) creating a compensation framework for stations operated below their normative plant availability factor — degradation of station heat rate and auxiliary energy consumption, additional secondary fuel oil for start-ups, sharing of gains with beneficiaries, annual reconciliation, and a mechanism to be issued by NLDC with the Commission's approval (p5–9). Paragraph 11 lowers the availability figure for three named hydro stations in Regulation 71 (p9). A closing note records the parent notification and gazette details of the Principal Regulations (p9).

Standard name
Tariff Regulations
Primary topics
Tariff determination, Generation tariff, Operating costs and other income

Read with this

The regulation

Amendments and corrections

Commencement notices and reasons

Other copies of these documents (3)

Earlier drafts

4 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document