Terms and Conditions of Tariff Regulations, 2024 — Second Amendment, 2026

Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (Second Amendment) Regulations, 2026

AmendmentDated 20 Mar 2026No. L-1/268/2022/CERC dated 20th March, 2026

Amends the Terms and Conditions of Tariff Regulations, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

Notification dated 20 March 2026 by which CERC makes the Second Amendment to its Terms and Conditions of Tariff Regulations, 2024 (p1). Its dominant purpose is to write a new regime for an 'integrated energy storage system' — storage co-located with a coal, lignite or gas-based thermal generating station, or with an inter-state transmission system — into the principal tariff regulations.

Clauses 1–4 do the groundwork: they bring such storage within the regulations' scope (a new Reg 2(2a)), extend the capital-cost definitions in Reg 3, add a lithium-ion battery useful life, and insert a full new Regulation 3A of ESS-specific definitions — auxiliary consumption, battery cell and cycle, C-rate, COD(ess), declared capacity, maximum continuous rating, plant availability factor, rated capacity, round-trip efficiency and state of charge (pp1–3).

Clauses 5–21 thread ESS through the tariff-determination machinery: date of commercial operation per the Grid Code, supplementary tariff petitions within 90 days of COD, capital cost, additional capitalisation and interest during construction, initial spares and working capital. Two new regulations, 29A and 29B, create separate in-principle approval routes for additional capitalisation on generating stations and on transmission systems, with consultation of beneficiaries, long-term customers, RPCs, CTU, NLDC/RLDC and a special filing window for viability-gap-funded storage (pp3–9).

Clauses 22–36 are a mixed bag: ESS return on equity, depreciation and working capital provisions sit alongside non-ESS changes — related-party loan interest benchmarked to the SBI MCLR (Reg 32), revised O&M escalation percentages, monthly recovery of water and security expenses, ash transportation expenses, Bhakra Beas Management Board O&M, and coal/lignite integrated-mine changes on ATQ incentives, GCV adjustment and Mine Developer and Operator contracts, plus substitution of the statutory references in Regs 39 and 53 (pp9–14).

Clauses 37–47 carry the core pricing rules: new Regulations 61A, 64A and 64B set out the charging-cost and cost-recovery formulae for supplementary capacity and supplementary energy charges; Regulation 70(FF) sets ESS operating norms; and Regulations 74, 78 and 84A cover first right of discharge, the NLDC-drafted charging/scheduling/dispatch procedure, sharing of ESS charges through the Sharing Regulations, and sharing of gains on storage services. A new Regulation 101A opens a regulatory sandbox for RDI with a cost cap (pp14–20). Clauses 48–51 amend the appendices and, through Appendices A and B, the thermal and transmission tariff filing forms, which are reworked to capture ESS capital cost, cycles, depth of discharge, availability, round-trip efficiency and useful life (pp20–32).

Standard name
Tariff Regulations
Primary topics
Energy storage deployment, Tariff determination, Generation tariff

Read with this

The regulation

Amendments and corrections

Commencement notices and reasons

Other copies of these documents (3)

Earlier drafts

4 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document