CERC · Central Electricity Regulatory Commission
Terms and Conditions of Tariff (First Amendment) Regulations, 2024 — Draft
Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (First Amendment) Regulations, 2024
Draft amendmentReleased with the notice dated 2 Aug 2024No. L-1/268/2022/CERC
Draft
A proposal that has since been finalised as the Terms and Conditions of Tariff Regulations, 2024 — First Amendment, 2025.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a draft CERC notification proposing the First Amendment to the CERC (Terms and Conditions of Tariff) Regulations, 2024. It is made under section 178 read with section 61 of the Electricity Act, 2003 and states that it follows previous publication (p1). Clause 1 names the instrument and fixes its commencement at 1 April 2024 (p1).
Clauses 2–3 introduce a defined "Bank Rate" — the SBI one-year MCLR plus a fixed margin — and replace the existing MCLR-plus-margin formulations in Regulations 9 and 10 with that bank rate (p1–2). Clause 4 changes the self-insurance premium percentage in Regulation 36 and adds a proviso requiring the premium to be held in a separate fund, with expenditure made available to the Commission (p2). Clause 5 lets a generating company plead an interim input price capped below its full claim after the first hearing and makes the difference recoverable or payable at true-up, while also switching the carrying rate to the bank rate (p2). Clause 6 replaces the Coal India notified-price benchmark in Regulation 50 with the price of alternate coal available to the station and restates the beneficiary-consent requirement (p3).
Clause 7 substitutes Regulation 51 and creates an overburden-removal (OB) adjustment regime. The generating company must remove overburden as specified in its Mining Plan; a shortfall against the year-wise schedule triggers a formula-based adjustment against either the Mining Charge (where an MDO is appointed) or O&M expenses. Shortfall or excess can be adjusted over the remaining tariff years up to 31 March 2029, with limited carry-forward beyond the period at true-up, and integrated mines auctioned under the Coal Mines (Special Provisions) Act, 2015 are excluded (p3–5).
Clauses 8–9 make small corrections to Regulations 55 and 64 (p5). Clause 10 amends Regulation 70: it extends the 31 March 2024 cut-off wording, adjusts the unit-size table and a Chandrapur auxiliary-consumption figure, and inserts Clause (G), a compensation scheme for stations operated below their normative plant availability factor. The scheme requires the entity that caused the below-normative scheduling to bear the compensation, provides degradation tables for heat rate, auxiliary consumption and secondary fuel oil, sets equal sharing of financial gains, requires annual reconciliation and leaves the detailed procedure to NLDC with Commission approval (p5–9). Clause 11 lowers the NAPAF for Karcham Wangtoo in the Regulation 71(A) table (p9).
Read with this
The regulation
- Dated 15 Mar 2024Terms and Conditions of Tariff Regulations, 2024
Amendments and corrections
- Dated 9 Apr 2024Tariff Regulations, 2024 — Corrigendum, 2024
- Dated 4 Feb 2025Terms and Conditions of Tariff Regulations, 2024 — First Amendment, 2025
- Dated 20 Mar 2026Terms and Conditions of Tariff Regulations, 2024 — Second Amendment, 2026
Commencement notices and reasons
Procedures and orders made under it
Other copies of these documents (3)
- Dated 15 Mar 2024Terms and Conditions of Tariff Regulations, 2024
- Dated 4 Feb 2025Terms and Conditions of Tariff (First Amendment) Regulations, 2025
- Dated 20 Mar 2026Terms and Conditions of Tariff (Second Amendment) Regulations, 2026
Earlier drafts
- Dated 4 Jan 2024Terms and Conditions of Tariff Regulations, 2024 — Draft
- Released with the notice dated 4 Jan 2024Hearing notice: Tentative Programme Schedule — Public Hearing on draft Terms and Conditions of Tariff Regulations, 2024
- Dated 4 Jan 2024Public notice: Public Notice on Draft Terms and Conditions of Tariff Regulations, 2024
- Released with the notice dated 4 Jan 2024Explanatory memorandum: Explanatory Memorandum on Draft Terms and Conditions of Tariff Regulations, 2024
- Dated 30 Jan 2024Notice extending the date for comments: Draft Terms and Conditions of Tariff Regulations, 2024 — Public Notice Extending Comments Deadline to 20.02.2024
- Dated 1 Dec 2025Terms and Conditions of Tariff (Second Amendment) Regulations, 2025 — Draft
- Dated 1 Dec 2025Public notice: Terms and Conditions of Tariff (Second Amendment) Regulations, 2025 — Draft — Public Notice
- Dated 1 Dec 2025Explanatory memorandum: Terms and Conditions of Tariff (Second Amendment) Regulations, 2025 — Explanatory Memorandum — Draft
- Dated 30 Dec 2025Notice extending the date for comments: Terms and Conditions of Tariff (Second Amendment) Regulations, 2025 — Public Notice — Extension of Comments Deadline
- Dated 16 Jan 2026Notice extending the date for comments: Draft Terms and Conditions of Tariff (Second Amendment) Regulations, 2025 — Public Notice, comment deadline extension
- Dated 4 Feb 2026Hearing notice: Public Hearing Notice — Terms and Conditions of Tariff (Second Amendment) Regulations, 2025
- Dated 2 Aug 2024Explanatory memorandum: Explanatory Memorandum — Draft Terms and Conditions of Tariff (First Amendment) Regulations, 2024
- Released with the notice dated 2 Aug 2024File: CEA Recommendations on Operational Norms of Secondary Fuel Oil Consumption per Start-up
- Dated 2 Aug 2024Public notice: Terms and Conditions of Tariff (First Amendment) Regulations, 2024 — Draft — Public Notice
- Dated 7 Sep 2024Notice extending the date for comments: Terms and Conditions of Tariff (First Amendment) Regulations, 2024 — Comment Deadline Extension Notice
- Dated 27 Sep 2024Hearing notice: Terms and Conditions of Tariff (First Amendment) Regulations, 2024 — public hearing notice, 3 October 2024
4 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft not held as English text.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.