Skip to content

CERC · Central Electricity Regulatory Commission

Terms and Conditions of Tariff (First Amendment) Regulations, 2024 — Draft

Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (First Amendment) Regulations, 2024

Draft amendmentReleased with the notice dated 2 Aug 2024No. L-1/268/2022/CERC

Draft

A proposal that has since been finalised as the Terms and Conditions of Tariff Regulations, 2024 — First Amendment, 2025.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a draft CERC notification proposing the First Amendment to the CERC (Terms and Conditions of Tariff) Regulations, 2024. It is made under section 178 read with section 61 of the Electricity Act, 2003 and states that it follows previous publication (p1). Clause 1 names the instrument and fixes its commencement at 1 April 2024 (p1).

Clauses 2–3 introduce a defined "Bank Rate" — the SBI one-year MCLR plus a fixed margin — and replace the existing MCLR-plus-margin formulations in Regulations 9 and 10 with that bank rate (p1–2). Clause 4 changes the self-insurance premium percentage in Regulation 36 and adds a proviso requiring the premium to be held in a separate fund, with expenditure made available to the Commission (p2). Clause 5 lets a generating company plead an interim input price capped below its full claim after the first hearing and makes the difference recoverable or payable at true-up, while also switching the carrying rate to the bank rate (p2). Clause 6 replaces the Coal India notified-price benchmark in Regulation 50 with the price of alternate coal available to the station and restates the beneficiary-consent requirement (p3).

Clause 7 substitutes Regulation 51 and creates an overburden-removal (OB) adjustment regime. The generating company must remove overburden as specified in its Mining Plan; a shortfall against the year-wise schedule triggers a formula-based adjustment against either the Mining Charge (where an MDO is appointed) or O&M expenses. Shortfall or excess can be adjusted over the remaining tariff years up to 31 March 2029, with limited carry-forward beyond the period at true-up, and integrated mines auctioned under the Coal Mines (Special Provisions) Act, 2015 are excluded (p3–5).

Clauses 8–9 make small corrections to Regulations 55 and 64 (p5). Clause 10 amends Regulation 70: it extends the 31 March 2024 cut-off wording, adjusts the unit-size table and a Chandrapur auxiliary-consumption figure, and inserts Clause (G), a compensation scheme for stations operated below their normative plant availability factor. The scheme requires the entity that caused the below-normative scheduling to bear the compensation, provides degradation tables for heat rate, auxiliary consumption and secondary fuel oil, sets equal sharing of financial gains, requires annual reconciliation and leaves the detailed procedure to NLDC with Commission approval (p5–9). Clause 11 lowers the NAPAF for Karcham Wangtoo in the Regulation 71(A) table (p9).

Standard name
Tariff Regulations
Primary topics
Generation tariff, Fuel price and supply, Return, financing and working capital

Read with this

The regulation

Commencement notices and reasons

Other copies of these documents (3)

Earlier drafts

4 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document