Explanatory Memorandum on Draft Terms and Conditions of Tariff Regulations, 2024

Explanatory Memorandum on Draft Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024

Explanatory memorandum to a draftReleased with the notice dated 4 Jan 2024

Draft

The draft has since been finalised as the Terms and Conditions of Tariff Regulations, 2024.

Explanatory memorandum to the Terms and Conditions of Tariff Regulations, 2024 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CERC's explanatory memorandum on the draft CERC (Terms and Conditions of Tariff) Regulations, 2024 for the 2024-29 control period (p1). It records the Commission's reasoning, stakeholder comments on the May 2023 Approach Paper, and the proposed draft regulation text. Chapters 1-2 set the statutory and regulatory background, list previous tariff regulations, and explain updated or new definitions such as ATQ, capital spares, cut-off date, de-commissioning, force majeure, mining plan, reference rate of interest and useful/operational life (p9-18). Chapter 3 links COD and infirm power to IEGC 2023 and DSM Regulations 2022 (p19-20). Chapter 4 proposes tariff filing within 90 days of actual COD, interim tariff up to 90%/80%, and clubbing rules (p21-27); Chapter 5 simplifies carrying cost (p28-30). Chapters 6-11 deal with capital cost, prudence check, IDC/IEDC, initial spares, additional capitalisation, R&M/special allowance, depreciation, GFA vs modified GFA and de-commissioning, including NCLT-acquired projects and emission-control capex (p31-92). Chapters 12-14 set RoE and tax gross-up, interest on loan and working capital, differentiating existing and new projects and technologies (p93-116). Chapters 15-22 specify O&M expense norms for thermal, hydro and transmission; normative availability for thermal and hydro; gross station heat rate; secondary fuel oil consumption; auxiliary energy consumption and reagent norms; and transmission availability norms (p117-229). Chapters 23-25 cover integrated coal/lignite mines, coal blending, and variable cost/energy charge, including GCV and transit loss (p230-249). Chapters 26-28 cover capacity charge recovery, peak/off-peak incentives and hydro incentives/shortfall recovery (p250-271). Chapters 29-31 address rebate and late payment surcharge, arbitration awards, non-ISTS lines carrying inter-state power, competitive procurement, and the transmission availability procedure (p272-289).

Standard name
Tariff Regulations
Primary topics
Tariff determination, Multi Year Tariff (MYT), Generation tariff

Read with this

The regulation

Commencement notices and reasons

Other copies of these documents (3)

Earlier drafts

4 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document