Skip to content

CERC · Central Electricity Regulatory Commission

CEA Recommendations on Operational Norms of Secondary Fuel Oil Consumption per Start-up

Recommendations on Operational norms of secondary fuel oil consumption -reg.

Published with a draftReleased with the notice dated 2 Aug 2024

Published with the Terms and Conditions of Tariff (First Amendment) Regulations, 2024 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

CEA's Thermal Engineering & Technology Development Division issues technical recommendations to CERC on start-up oil consumption norms for coal/lignite thermal units (p1). The covering letter records that CERC asked CEA, by D.O. No. CERC/CEA/T&C/2024 dated 04.10.2024, for operational norms for secondary fuel oil consumption per start-up for different unit sizes and hot, warm and cold starts, and for any other technical aspects relevant to tariff determination (p1, p3). The recommendations are based on five years of thermal station operational data from FY2019-20 to FY2023-24 and OEM start-up oil data (p1, p4).

The letter recommends start-up oil consumption values per start-up for 210 MW series, 500 MW, 660 MW and 800 MW units, differentiated by hot, warm and cold start (p1, p18). It also recommends that supercritical/ultra-supercritical units get 10% extra start-up oil for three years from their date of commercial operation (p2, p18). It advises units with high consumption to improve operational practices toward OEM levels (p2, p18).

The enclosed Explanatory Memorandum/report sets out the existing compensation framework: additional compensation for secondary fuel oil consumption over seven start/stop in a year under Regulation 47 of the Grid Code Regulations 2023, as reflected in IEGC (Fourth Amendment) Regulations, 2016 and the draft CERC (Terms and Conditions of Tariff) (First Amendment) Regulations, 2024 (p3-4). It describes the data received from 71 generating stations, including central, state and private sector units, and exclusions of very high values and wall-fired boilers (p4-6). It analyses 200 MW, 500 MW, 660 MW and 800 MW units sector- and utility-wise, compares actual and OEM values with reference values, and examines newer units and post-overhaul cold starts (pp5-17). The report concludes with summary tables and recommended norms (pp15-18), supported by Annexure-I listing the stations (pp19-21).

Primary topics
Generation tariff

Read with this

The regulation

Commencement notices and reasons

Other copies of these documents (3)

Earlier drafts

4 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document