Explanatory Memorandum — Draft Terms and Conditions of Tariff (First Amendment) Regulations, 2024

Explanatory Memorandum for the "Draft Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (First Amendment) Regulations, 2024.

Explanatory memorandum to a draftDated 2 Aug 2024

Explanatory memorandum to the Terms and Conditions of Tariff (First Amendment) Regulations, 2024 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Central Electricity Regulatory Commission's explanatory memorandum accompanying the draft CERC (Terms and Conditions of Tariff) (First Amendment) Regulations, 2024. It is explanatory, not operative: it sets out why each change is proposed and how the Principal Regulations, 2024, would be altered. The draft amendment was issued on 2 August 2024 for stakeholder comments (p1).

The background explains that the 2024 Principal Regulations largely retained the integrated-mine input-price framework from the 2021 Second Amendment, which had been applied in cases such as Barsingsar and Talabira mines, and that implementation experience plus CEA recommendations on part-load operation justify changes; transmission and hydro norms also need correction (pp1–2). An overview lists the amendment groups (pp2–3).

The substantive sections take each proposed change in turn. Section 3.1 would define 'Bank Rate' and amend Regulations 3, 9 and 10 so refund or recovery of differential tariff aligns with Section 62(6) of the Act (p3). Section 3.2 would raise the permissible self-insurance limit for transmission assets and add oversight of the reserve fund (pp3–4). Sections 3.3 and 3.4 address integrated coal mines: after a tariff petition, a generating company could seek an interim input price subject to prudence check, and Regulation 50 would compare the input price with alternative coal available to the station instead of Coal India Ltd's notified price (pp4–6). Section 3.5 rewrites the Regulation 51 overburden-adjustment framework, including treatment where an MDO is or is not appointed, a corrected adjustment-factor formula, treatment of differences between contract and regulatory OB adjustment, and an adjustment period aligned with the tariff period with true-up carry-forward (pp6–10). Section 3.6 expands Regulation 55 to recognise third-party sampling guidelines from other Government of India authorities besides the Ministry of Coal (pp10–11). Section 3.7 clarifies the 30-year COD norm by adding 'or thereafter' to the cut-off date (p11). Section 3.8 aligns Chandrapur TPS auxiliary consumption with similar units (p11). Section 3.9 proposes a Regulation 70(G) part-load compensation framework for Section 62 stations, with the detailed procedure to be issued by NLDC (pp11–13). Section 3.10 would revise the Karcham Wangtoo HEP NAPAF in line with similar and downstream projects (p13).

Standard name
Tariff Regulations
Primary topics
Tariff determination, Generation tariff, Fuel price and supply

Read with this

The regulation

Commencement notices and reasons

Other copies of these documents (3)

Earlier drafts

4 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document