Terms and Conditions of Tariff (Second Amendment) Regulations, 2025 — Explanatory Memorandum — Draft

Explanatory Memorandum for the "Draft Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (Second Amendment) Regulations, 2025.

Explanatory memorandum to a draftDated 1 Dec 2025

Explanatory memorandum to the Terms and Conditions of Tariff (Second Amendment) Regulations, 2025 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The document is CERC's Explanatory Memorandum for the draft CERC (Terms and Conditions of Tariff) (Second Amendment) Regulations, 2025. It explains why CERC proposes to amend the Tariff Regulations, 2024, and summarises each proposed change. The draft amendment was issued on 1 December 2025 for stakeholder comments; the memorandum itself does not contain the operative draft text. (p1, p45)

Section 1 (pp1–4) sets out the background: growth of variable renewable generation, the need for flexibility from coal-based thermal stations, the need for grid reliability, and gaps in borrowing, ash transportation, mine input price and sandbox frameworks. It lists the headline amendments. Section 2 (pp4–8) gives a clause-by-clause overview, mapping proposed changes to regulations of the 2024 principal regulations. It covers the integrated energy storage system (IESS), borrowing discipline, O&M expenses, input price of integrated mines, regulatory sandbox, and additional amendments such as transmission availability for TCSC/Fixed Series Reactors and filing forms. Section 3 (pp8–11) describes enablers for storage: Central Government policies, VGF schemes, ancillary services eligibility, technical characteristics, and National Electricity Plan capacity projections.

Proposals I–V (pp11–33) deal with storage integration. Proposal I (pp11–16) would allow a transmission licensee to establish a dedicated ESS integrated with an ISTS substation, treated as a transmission element, with NLDC-prepared charging/scheduling procedures, CTU-identified location, separate tariff as additional capital expenditure, and income ploughed back to reduce transmission charges. Proposal II (pp17–21) would allow a generating company to integrate ESS with an existing or new thermal station to improve flexibility, store surplus generation, and shift output to peak hours; ownership of stored energy and commercial arrangements are specified. Proposal III (pp21–29) is the core tariff design: a separate two-part supplementary tariff comprising supplementary storage charges (fixed) and supplementary energy charges (variable), with in-principle approval, beneficiary/RPC consultation, and recovery mechanisms for generating-station and ISTS IESS. Proposal IV (pp29–31) covers scheduling, dispatch, energy accounting, metering, and connectivity margins. Proposal V (pp31–33) covers utilisation of stored electricity in the open or ancillary market when beneficiaries do not use it.

Proposals VI–X (pp33–45) cover non-storage changes. Proposal VI (pp33–34) addresses related-party borrowing and interest-rate restructuring. Proposal VII (pp34–35) streamlines O&M norms for ash transportation, the Bhakra Beas Management Board transmission system, and new hydro projects. Proposal VIII (pp36–41) strengthens the input-price framework for integrated coal and lignite mines, including interim input price, recognition of older mining statutes, performance incentive, additional capital expenditure, land depreciation, recovery of input price, and overburden/GCV adjustment. Proposal IX (pp41–43) creates a regulatory sandbox framework for approved innovation projects. Proposal X (pp43–45) contains additional amendments on transmission R&M, ramp-rate measurement, TCSC/Fixed Series Reactor availability, and hydro energy-charge true-up. Section 14 (p45) records publication of the draft on 1 December 2025 and the invitation for comments.

Standard name
Tariff Regulations
Primary topics
Energy storage deployment, Tariff determination, Generation tariff

Read with this

The regulation

Commencement notices and reasons

Other copies of these documents (3)

Earlier drafts

4 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document