Explanatory Memorandum for the "Draft Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (Second Amendment) Regulations, 2025.
Explanatory memorandum to a draftDated 1 Dec 2025
Draft
The draft has since been finalised as the Terms and Conditions of Tariff Regulations, 2024 — Second Amendment, 2026.
Explanatory memorandum to the Terms and Conditions of Tariff (Second Amendment) Regulations, 2025 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The document is CERC's Explanatory Memorandum for the draft CERC (Terms and Conditions of Tariff) (Second Amendment) Regulations, 2025. It explains why CERC proposes to amend the Tariff Regulations, 2024, and summarises each proposed change. The draft amendment was issued on 1 December 2025 for stakeholder comments; the memorandum itself does not contain the operative draft text. (p1, p45)
Section 1 (pp1–4) sets out the background: growth of variable renewable generation, the need for flexibility from coal-based thermal stations, the need for grid reliability, and gaps in borrowing, ash transportation, mine input price and sandbox frameworks. It lists the headline amendments. Section 2 (pp4–8) gives a clause-by-clause overview, mapping proposed changes to regulations of the 2024 principal regulations. It covers the integrated energy storage system (IESS), borrowing discipline, O&M expenses, input price of integrated mines, regulatory sandbox, and additional amendments such as transmission availability for TCSC/Fixed Series Reactors and filing forms. Section 3 (pp8–11) describes enablers for storage: Central Government policies, VGF schemes, ancillary services eligibility, technical characteristics, and National Electricity Plan capacity projections.
Proposals I–V (pp11–33) deal with storage integration. Proposal I (pp11–16) would allow a transmission licensee to establish a dedicated ESS integrated with an ISTS substation, treated as a transmission element, with NLDC-prepared charging/scheduling procedures, CTU-identified location, separate tariff as additional capital expenditure, and income ploughed back to reduce transmission charges. Proposal II (pp17–21) would allow a generating company to integrate ESS with an existing or new thermal station to improve flexibility, store surplus generation, and shift output to peak hours; ownership of stored energy and commercial arrangements are specified. Proposal III (pp21–29) is the core tariff design: a separate two-part supplementary tariff comprising supplementary storage charges (fixed) and supplementary energy charges (variable), with in-principle approval, beneficiary/RPC consultation, and recovery mechanisms for generating-station and ISTS IESS. Proposal IV (pp29–31) covers scheduling, dispatch, energy accounting, metering, and connectivity margins. Proposal V (pp31–33) covers utilisation of stored electricity in the open or ancillary market when beneficiaries do not use it.
Proposals VI–X (pp33–45) cover non-storage changes. Proposal VI (pp33–34) addresses related-party borrowing and interest-rate restructuring. Proposal VII (pp34–35) streamlines O&M norms for ash transportation, the Bhakra Beas Management Board transmission system, and new hydro projects. Proposal VIII (pp36–41) strengthens the input-price framework for integrated coal and lignite mines, including interim input price, recognition of older mining statutes, performance incentive, additional capital expenditure, land depreciation, recovery of input price, and overburden/GCV adjustment. Proposal IX (pp41–43) creates a regulatory sandbox framework for approved innovation projects. Proposal X (pp43–45) contains additional amendments on transmission R&M, ramp-rate measurement, TCSC/Fixed Series Reactor availability, and hydro energy-charge true-up. Section 14 (p45) records publication of the draft on 1 December 2025 and the invitation for comments.
Read with this
The regulation
- Dated 15 Mar 2024Terms and Conditions of Tariff Regulations, 2024
Amendments and corrections
- Dated 9 Apr 2024Tariff Regulations, 2024 — Corrigendum, 2024
- Dated 4 Feb 2025Terms and Conditions of Tariff Regulations, 2024 — First Amendment, 2025
- Dated 20 Mar 2026Terms and Conditions of Tariff Regulations, 2024 — Second Amendment, 2026
Commencement notices and reasons
Procedures and orders made under it
Other copies of these documents (3)
- Dated 15 Mar 2024Terms and Conditions of Tariff Regulations, 2024
- Dated 4 Feb 2025Terms and Conditions of Tariff (First Amendment) Regulations, 2025
- Dated 20 Mar 2026Terms and Conditions of Tariff (Second Amendment) Regulations, 2026
Earlier drafts
- Dated 4 Jan 2024Terms and Conditions of Tariff Regulations, 2024 — Draft
- Released with the notice dated 4 Jan 2024Hearing notice: Tentative Programme Schedule — Public Hearing on draft Terms and Conditions of Tariff Regulations, 2024
- Dated 4 Jan 2024Public notice: Public Notice on Draft Terms and Conditions of Tariff Regulations, 2024
- Released with the notice dated 4 Jan 2024Explanatory memorandum: Explanatory Memorandum on Draft Terms and Conditions of Tariff Regulations, 2024
- Dated 30 Jan 2024Notice extending the date for comments: Draft Terms and Conditions of Tariff Regulations, 2024 — Public Notice Extending Comments Deadline to 20.02.2024
- Released with the notice dated 2 Aug 2024Terms and Conditions of Tariff (First Amendment) Regulations, 2024 — Draft
- Dated 2 Aug 2024Explanatory memorandum: Explanatory Memorandum — Draft Terms and Conditions of Tariff (First Amendment) Regulations, 2024
- Released with the notice dated 2 Aug 2024File: CEA Recommendations on Operational Norms of Secondary Fuel Oil Consumption per Start-up
- Dated 2 Aug 2024Public notice: Terms and Conditions of Tariff (First Amendment) Regulations, 2024 — Draft — Public Notice
- Dated 7 Sep 2024Notice extending the date for comments: Terms and Conditions of Tariff (First Amendment) Regulations, 2024 — Comment Deadline Extension Notice
- Dated 27 Sep 2024Hearing notice: Terms and Conditions of Tariff (First Amendment) Regulations, 2024 — public hearing notice, 3 October 2024
- Dated 1 Dec 2025Terms and Conditions of Tariff (Second Amendment) Regulations, 2025 — Draft
- Dated 1 Dec 2025Public notice: Terms and Conditions of Tariff (Second Amendment) Regulations, 2025 — Draft — Public Notice
- Dated 30 Dec 2025Notice extending the date for comments: Terms and Conditions of Tariff (Second Amendment) Regulations, 2025 — Public Notice — Extension of Comments Deadline
- Dated 16 Jan 2026Notice extending the date for comments: Draft Terms and Conditions of Tariff (Second Amendment) Regulations, 2025 — Public Notice, comment deadline extension
- Dated 4 Feb 2026Hearing notice: Public Hearing Notice — Terms and Conditions of Tariff (Second Amendment) Regulations, 2025
4 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft not held as English text.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.