Skip to content

CERC · Central Electricity Regulatory Commission

Part-Load Compensation Procedure for Thermal Generating Stations, 2025 — Order under Tariff Regulations, 2024

Approval of "Procedure for mechanism of compensation for degradation of Station Heat Rate, Auxiliary Energy Consumption and Secondary fuel oil consumption due to part-load operation and multiple start/stop of the units" under Regulation 70(G)(10) of the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024 as amended time to time.

ProcedureDated 14 Jul 2025No. L-1/268/2022/CERC dated 14th July, 2025

Made under the Terms and Conditions of Tariff Regulations, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The document is a CERC order dated 14 July 2025 (p1) approving the NLDC's procedure for compensating coal/gas/lignite-based generating stations whose tariff is determined by CERC for degradation of station heat rate (SHR), auxiliary energy consumption (AEC) and secondary fuel oil consumption when they run part-load or start/stop multiple times. The order recounts that the First Amendment Tariff Regulations 2025 placed the obligation to issue this procedure on NLDC and that NLDC submitted its draft on 20 March 2025; CERC approved it with changes, directed NLDC to circulate it to affected generating companies and beneficiaries through RLDCs/RPCs, and made it effective from the date the First Amendment Tariff Regulations 2025 come into force (p2). The order records two different dates for notification of those First Amendment Regulations — 11 April 2025 (p1) and 4 February 2025 (p2).

The annexed procedure (pp3–11) first defines its key terms: designated generating stations, calculation period, average unit loading, effective capacity/generation, and the ECR variants used to measure degradation (pp3–5). Its compensation mechanism is monthly on a cumulative basis with automatic year-end reconciliation. It prescribes how to compute ECR based on scheduled energy and declared capacity, how to derive the compensable ECR difference and compensation payable to the station, and how any gain is shared with beneficiaries; it states that no compensation is payable by a beneficiary that has requisitioned at least the normative annual plant availability factor of its entitlement, and allocates compensation among beneficiaries in proportion to un-requisitioned energy below NAPAF (pp5–8). Generation brought on bar under SCUC is treated separately and paid from the Deviation and Ancillary Services Pool (p8).

A separate section covers secondary fuel oil: start-up compensation is linked to a threshold of seven start-ups per year, with attribution to beneficiaries responsible for low requisition, sharing formulae, a supercritical/ultra-supercritical relaxation, and an additional per-kWh compensation when a station runs below 55% of effective capacity in a 15-minute block (pp8–10). The procedure then addresses billing by generating stations, monthly data submission to RPC/SLDC, issuance of compensation statements, dispute timelines and carrying cost for delay (pp11–12). An annexure sets out the monthly data format (pp12–13).

Standard name
Tariff Regulations
Primary topics
Generation tariff, Ancillary services and reserves, Energy accounting and settlement

Read with this

The regulation

Commencement notices and reasons

Other copies of these documents (3)

Earlier drafts

4 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document