CERC · Central Electricity Regulatory Commission
Part-Load Compensation Procedure for Thermal Generating Stations, 2025 — Order under Tariff Regulations, 2024
Approval of "Procedure for mechanism of compensation for degradation of Station Heat Rate, Auxiliary Energy Consumption and Secondary fuel oil consumption due to part-load operation and multiple start/stop of the units" under Regulation 70(G)(10) of the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024 as amended time to time.
ProcedureDated 14 Jul 2025No. L-1/268/2022/CERC dated 14th July, 2025
Made under the Terms and Conditions of Tariff Regulations, 2024.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The document is a CERC order dated 14 July 2025 (p1) approving the NLDC's procedure for compensating coal/gas/lignite-based generating stations whose tariff is determined by CERC for degradation of station heat rate (SHR), auxiliary energy consumption (AEC) and secondary fuel oil consumption when they run part-load or start/stop multiple times. The order recounts that the First Amendment Tariff Regulations 2025 placed the obligation to issue this procedure on NLDC and that NLDC submitted its draft on 20 March 2025; CERC approved it with changes, directed NLDC to circulate it to affected generating companies and beneficiaries through RLDCs/RPCs, and made it effective from the date the First Amendment Tariff Regulations 2025 come into force (p2). The order records two different dates for notification of those First Amendment Regulations — 11 April 2025 (p1) and 4 February 2025 (p2).
The annexed procedure (pp3–11) first defines its key terms: designated generating stations, calculation period, average unit loading, effective capacity/generation, and the ECR variants used to measure degradation (pp3–5). Its compensation mechanism is monthly on a cumulative basis with automatic year-end reconciliation. It prescribes how to compute ECR based on scheduled energy and declared capacity, how to derive the compensable ECR difference and compensation payable to the station, and how any gain is shared with beneficiaries; it states that no compensation is payable by a beneficiary that has requisitioned at least the normative annual plant availability factor of its entitlement, and allocates compensation among beneficiaries in proportion to un-requisitioned energy below NAPAF (pp5–8). Generation brought on bar under SCUC is treated separately and paid from the Deviation and Ancillary Services Pool (p8).
A separate section covers secondary fuel oil: start-up compensation is linked to a threshold of seven start-ups per year, with attribution to beneficiaries responsible for low requisition, sharing formulae, a supercritical/ultra-supercritical relaxation, and an additional per-kWh compensation when a station runs below 55% of effective capacity in a 15-minute block (pp8–10). The procedure then addresses billing by generating stations, monthly data submission to RPC/SLDC, issuance of compensation statements, dispute timelines and carrying cost for delay (pp11–12). An annexure sets out the monthly data format (pp12–13).
Read with this
The regulation
- Dated 15 Mar 2024Terms and Conditions of Tariff Regulations, 2024
Amendments and corrections
- Dated 9 Apr 2024Tariff Regulations, 2024 — Corrigendum, 2024
- Dated 4 Feb 2025Terms and Conditions of Tariff Regulations, 2024 — First Amendment, 2025
- Dated 20 Mar 2026Terms and Conditions of Tariff Regulations, 2024 — Second Amendment, 2026
Commencement notices and reasons
Other copies of these documents (3)
- Dated 15 Mar 2024Terms and Conditions of Tariff Regulations, 2024
- Dated 4 Feb 2025Terms and Conditions of Tariff (First Amendment) Regulations, 2025
- Dated 20 Mar 2026Terms and Conditions of Tariff (Second Amendment) Regulations, 2026
Earlier drafts
- Dated 4 Jan 2024Terms and Conditions of Tariff Regulations, 2024 — Draft
- Released with the notice dated 4 Jan 2024Hearing notice: Tentative Programme Schedule — Public Hearing on draft Terms and Conditions of Tariff Regulations, 2024
- Dated 4 Jan 2024Public notice: Public Notice on Draft Terms and Conditions of Tariff Regulations, 2024
- Released with the notice dated 4 Jan 2024Explanatory memorandum: Explanatory Memorandum on Draft Terms and Conditions of Tariff Regulations, 2024
- Dated 30 Jan 2024Notice extending the date for comments: Draft Terms and Conditions of Tariff Regulations, 2024 — Public Notice Extending Comments Deadline to 20.02.2024
- Released with the notice dated 2 Aug 2024Terms and Conditions of Tariff (First Amendment) Regulations, 2024 — Draft
- Dated 2 Aug 2024Explanatory memorandum: Explanatory Memorandum — Draft Terms and Conditions of Tariff (First Amendment) Regulations, 2024
- Released with the notice dated 2 Aug 2024File: CEA Recommendations on Operational Norms of Secondary Fuel Oil Consumption per Start-up
- Dated 2 Aug 2024Public notice: Terms and Conditions of Tariff (First Amendment) Regulations, 2024 — Draft — Public Notice
- Dated 7 Sep 2024Notice extending the date for comments: Terms and Conditions of Tariff (First Amendment) Regulations, 2024 — Comment Deadline Extension Notice
- Dated 27 Sep 2024Hearing notice: Terms and Conditions of Tariff (First Amendment) Regulations, 2024 — public hearing notice, 3 October 2024
- Dated 1 Dec 2025Terms and Conditions of Tariff (Second Amendment) Regulations, 2025 — Draft
- Dated 1 Dec 2025Public notice: Terms and Conditions of Tariff (Second Amendment) Regulations, 2025 — Draft — Public Notice
- Dated 1 Dec 2025Explanatory memorandum: Terms and Conditions of Tariff (Second Amendment) Regulations, 2025 — Explanatory Memorandum — Draft
- Dated 30 Dec 2025Notice extending the date for comments: Terms and Conditions of Tariff (Second Amendment) Regulations, 2025 — Public Notice — Extension of Comments Deadline
- Dated 16 Jan 2026Notice extending the date for comments: Draft Terms and Conditions of Tariff (Second Amendment) Regulations, 2025 — Public Notice, comment deadline extension
- Dated 4 Feb 2026Hearing notice: Public Hearing Notice — Terms and Conditions of Tariff (Second Amendment) Regulations, 2025
4 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft not held as English text.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.