CERC · Central Electricity Regulatory Commission
Vetting of Capital Cost of Hydro-Electric Projects — Statement of Reasons
GUIDELINES FOR VETTING OF CAPITAL COST OF HYDRO-ELECTIC PROJECTS BY THE DESIGNATED INDEPENDENT AGENCIES/INSTITUTIONS/EXPERTS
Statement of reasonsDated 20 Jul 2010L-1/50/2010-CERC dated 20th of July, 2010
Replaced by Terms and Conditions of Tariff Regulations, 2014
See that regulation for the date it took effect and for anything it keeps in force.
The commission's reasons for the Terms and Conditions of Tariff Regulations, 2009 or one of its amendments.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Central Electricity Regulatory Commission's Statement of Reasons (dated 20 July 2010) explaining and finalising the Guidelines for Vetting of Capital Cost of Hydro-Electric Projects by Designated Independent Agencies/Institutions/Experts. It is not itself the guidelines text; it records the statutory basis, stakeholder objections and the Commission's decisions, and directs the Secretary to notify the guidelines (p15).
Part 1 (p1–5) sets out the statutory basis: CERC regulates the tariff of central generating companies and multi-state generating companies under s.79(1)(a)-(b), read with s.61 and s.178(2)(s); the 2009 Tariff Regulations require it; and the third and fourth provisos to Regulation 7(2) empower guidelines for independent vetting of hydro capital cost and approval of commissioning schedules. It identifies two responsibilities: ascertaining the reasonableness of capital cost of hydro projects, and scrutinising and approving commissioning schedules of private hydro projects, following the 2008 amended tariff policy (Hydro Power Policy 2008). The draft guidelines were circulated by public notice dated 19.4.2010 and a public hearing was held on 20.5.2010 (p4).
Part 2 (p5–8) decides applicability: CPSUs are not exempted; projects set up by CPSUs will also be examined by designated independent agencies/experts, but due regard must be had to CEA concurrence and PIB/CCEA cost approval. CEA-concurred schemes still require cost vetting. Ongoing projects are covered, with agencies to be engaged within reasonable time after notification.
Parts 3–4 (p8–9) address selection of the agency/expert and the ceiling on consultancy charges; the Commission permits replacement in specified circumstances and caps consultancy charges payable by the generating company for vetting. Part 5 (p9–10) defines the parameters for appraisal: vetting is limited to the reasonableness of capital cost, not technical design; design responsibility remains with the developer, and the agency must examine gold plating and delay/cost implications, considering CEA/PIB/CCEA observations.
Parts 6–9 (p10–15) deal with conflict of interest (including a two-year prior-dealing test and allowing the same agency for subsequent projects), confidentiality of sensitive information (limited document submission and no public use to the generating company's detriment), no separate penalty on the agency (contractual safeguards and removal from the panel instead), and independent monitoring as the sole cost-monitoring mechanism for time and cost overruns. Annexure (p16) lists stakeholders who commented or attended the public hearing.
Read with this
The regulation
- Dated 19 Jan 2009Terms and Conditions of Tariff Regulations, 2009
Amendments and corrections
- Dated 10 Jun 2009Terms and Conditions of Tariff Regulations, 2009 — Addendum, 2009
- Dated 10 Jun 2009Terms and Conditions of Tariff Regulations, 2009 — Corrigendum, 10 June 2009
- Dated 2 May 2011Terms and Conditions of Tariff Regulations, 2009 — First Amendment, 2011
- Dated 21 Jun 2011Terms and Conditions of Tariff Regulations, 2009 — Second Amendment, 2011
- Dated 31 Dec 2012Terms and Conditions of Tariff (Third Amendment) Regulations, 2012
- Dated 15 Jun 2010Changes some provisions: Sharing of ISTS Charges and Losses Regulations, 2010
- Dated 15 Jun 2010Changes some provisions: Sharing of Inter State Transmission Charges and Losses Regulations, 2010
Commencement notices and reasons
Procedures and orders made under it
Other copies of these documents (5)
- Dated 19 Jan 2009Terms and Conditions of Tariff Regulations, 2009
- Dated 2 Aug 2010Hydro Electric Project Capital Cost Vetting Guidelines, 2010
- Dated 2 May 2011Terms and Conditions of Tariff (First Amendment) Regulations, 2011
- Dated 21 Jun 2011Terms and Conditions of Tariff Regulations, 2009 — Second Amendment, 2011
- Dated 31 Dec 2012Terms and Conditions of Tariff Regulations, 2009 — Third Amendment, 2012
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.