CERC · Central Electricity Regulatory Commission
Hydro Electric Project Capital Cost Vetting Guidelines, 2010
Guidelines for vetting of the capital cost of hydro electric projects by Designated Independent Agencies or Institutions or Experts and other related matters
Gazette copyDated 2 Aug 2010Published in the Gazette 7 Aug 2010No. L-1/50/2010-CERC dated the 2nd August, 2010
Replaced by Terms and Conditions of Tariff Regulations, 2014
See that regulation for the date it took effect and for anything it keeps in force.
A Gazette copy of the Terms and Conditions of Tariff Regulations, 2009 or of one of its amendments.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a CERC notification publishing guidelines for how the capital cost of hydro-electric projects is to be vetted by independent agencies or experts before CERC determines the project's tariff. The Gazette masthead is dated 7 August 2010 (p1); the notification itself is dated 2 August 2010 and numbered L-1/50/2010-CERC (p8). The guidelines are issued because the third proviso to Regulation 7(2) of the CERC (Terms and Conditions of Tariff) Regulations, 2009 allows the Commission to issue such guidelines (p8).
Sections 2–4 set the title, applicability and objectives. They apply to designated independent agencies/experts and to central generating companies or generating companies with a composite scheme for sale of power in more than one State whose hydro project tariffs are determined by CERC (p8–9). They come into force from the date of notification in the Official Gazette (p9). The objectives are to describe roles, information exchange, scope and stages of vetting, and the vetting procedure for tariff purposes (p9). Definitions cover the designated agency/expert and the generating company, with other terms read from the Electricity Act 2003 or the 2009 Tariff Regulations (p9–10).
Sections 5–6 deal with selection and fees. CERC publishes a panel of agencies/experts and may add or delete names (p10). The generating company selects from the panel, invites bids from two or more and picks the lowest quotation, with a single-bid exception and conflict-of-interest rules; it may change agency in specified circumstances with prior intimation (p10–11). Consultancy charges are capped at the lower of a percentage of capital cost excluding IDC and financing charges, or a fixed rupee amount, with a pro-rata addition for geological surprises (p12).
Sections 7–8 allocate responsibilities. The independent agency appraises capital cost against an enumerated list of technical, geological, hydrological, environmental, resettlement, cost, funding and schedule factors, reports attributable and non-attributable cost overruns, and submits its appraisal within stated timelines, including provisos for design changes, ongoing projects and natural calamities; its monitoring is limited to cost appraisal and it must appear before CERC in tariff hearings (p12–14). The generating company prepares the DPR per CEA/CWC guidelines, includes a checklist and clearances, sets out a PERT/CPM schedule, updates changes, furnishes tender and award information, and files the agency's appraisal with its tariff petition; the vetted capital cost is then considered by CERC under the 2009 Tariff Regulations (p15–17).
Read with this
The regulation
- Dated 19 Jan 2009Terms and Conditions of Tariff Regulations, 2009
Amendments and corrections
- Dated 10 Jun 2009Terms and Conditions of Tariff Regulations, 2009 — Addendum, 2009
- Dated 10 Jun 2009Terms and Conditions of Tariff Regulations, 2009 — Corrigendum, 10 June 2009
- Dated 2 May 2011Terms and Conditions of Tariff Regulations, 2009 — First Amendment, 2011
- Dated 21 Jun 2011Terms and Conditions of Tariff Regulations, 2009 — Second Amendment, 2011
- Dated 31 Dec 2012Terms and Conditions of Tariff (Third Amendment) Regulations, 2012
- Dated 15 Jun 2010Changes some provisions: Sharing of ISTS Charges and Losses Regulations, 2010
- Dated 15 Jun 2010Changes some provisions: Sharing of Inter State Transmission Charges and Losses Regulations, 2010
Commencement notices and reasons
- Dated 3 Feb 2009Terms and Conditions of Tariff Regulations, 2009 — Statement of Objects and Reasons
- Dated 20 Jul 2010Vetting of Capital Cost of Hydro-Electric Projects — Statement of Reasons
- Dated 21 Jun 2011Tariff Second Amendment 2011 — Statement of Reasons
- Date not statedTerms and Conditions of Tariff, 2009 — Third Amendment, 2012 — Statement of Reasons
Procedures and orders made under it
Other copies of these documents (4)
- Dated 19 Jan 2009Terms and Conditions of Tariff Regulations, 2009
- Dated 2 May 2011Terms and Conditions of Tariff (First Amendment) Regulations, 2011
- Dated 21 Jun 2011Terms and Conditions of Tariff Regulations, 2009 — Second Amendment, 2011
- Dated 31 Dec 2012Terms and Conditions of Tariff Regulations, 2009 — Third Amendment, 2012
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.