CERC · Central Electricity Regulatory Commission
Terms and Conditions of Tariff Regulations, 2009 — Third Amendment, 2012
Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (Third Amendment) Regulations, 2012
Amendment · Gazette copyDated 31 Dec 2012Published in the Gazette 1 Jan 2013No. L-7/145(160)/2012—CERC. dated 31st December 2012
Replaced by Terms and Conditions of Tariff Regulations, 2014
See that regulation for the date it took effect and for anything it keeps in force.
The Gazette copy of the Terms and Conditions of Tariff (Third Amendment) Regulations, 2012.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a CERC notification publishing the Third Amendment Regulations, 2012 to the CERC (Terms and Conditions of Tariff) Regulations, 2009 (p10). It makes a series of amendments to the Principal Regulations, adding and modifying definitions, cost and tariff provisions, and creating new regulations for pumped storage hydro stations and reimbursement of fees and expenses.
After the short title and commencement clause, the amendments begin with Regulation 3, inserting a definition of 'pumped storage hydro generating station' and bringing such stations within existing references to hydro generating stations (p10). Regulation 7 is amended to allow the Commission to issue guidelines for scrutiny and commissioning of hydro-electric projects in line with tariff policy, and to include rural household supply infrastructure within capital cost under a new proviso (p11). Regulation 8 is amended to include pumped storage hydro and gas insulated substations (p11). Regulation 9 allows projected capital expenditure and adds rural infrastructure expenditure (p12). Regulation 11 substitutes the UI rate reference with the CERC UI Regulations 2009 (p12). Regulation 15 is substituted to specify pre-tax return on equity by station type (p12).
Regulation 21 is amended to require generating companies to provide fuel GCV/price details and website disclosures (p12). Regulation 22 heading is revised and a new clause 7a added for water usage charges payable by beneficiaries of NHPC hydro stations in Jammu & Kashmir, subject to High Court decision (p13). A new Regulation 22A sets out capacity charge and energy charge computation for pumped storage hydro stations (p13–15). Regulation 27 is amended to address pumping energy arrangement and beneficiary entitlements (p16). Regulation 32 deletes the exclusion of a State controlled or owned company from a proviso (p16). A new Regulation 42A is added for reimbursement of fees and charges (p16–17). The note records prior publication dates of the Principal Regulations and first two amendments (p17).
Read with this
The regulation
- Dated 19 Jan 2009Terms and Conditions of Tariff Regulations, 2009
Amendments and corrections
- Dated 10 Jun 2009Terms and Conditions of Tariff Regulations, 2009 — Addendum, 2009
- Dated 10 Jun 2009Terms and Conditions of Tariff Regulations, 2009 — Corrigendum, 10 June 2009
- Dated 2 May 2011Terms and Conditions of Tariff Regulations, 2009 — First Amendment, 2011
- Dated 21 Jun 2011Terms and Conditions of Tariff Regulations, 2009 — Second Amendment, 2011
- Dated 31 Dec 2012Terms and Conditions of Tariff (Third Amendment) Regulations, 2012
- Dated 15 Jun 2010Changes some provisions: Sharing of ISTS Charges and Losses Regulations, 2010
- Dated 15 Jun 2010Changes some provisions: Sharing of Inter State Transmission Charges and Losses Regulations, 2010
Commencement notices and reasons
- Dated 3 Feb 2009Terms and Conditions of Tariff Regulations, 2009 — Statement of Objects and Reasons
- Dated 20 Jul 2010Vetting of Capital Cost of Hydro-Electric Projects — Statement of Reasons
- Dated 21 Jun 2011Tariff Second Amendment 2011 — Statement of Reasons
- Date not statedTerms and Conditions of Tariff, 2009 — Third Amendment, 2012 — Statement of Reasons
Procedures and orders made under it
Other copies of these documents (4)
- Dated 19 Jan 2009Terms and Conditions of Tariff Regulations, 2009
- Dated 2 Aug 2010Hydro Electric Project Capital Cost Vetting Guidelines, 2010
- Dated 2 May 2011Terms and Conditions of Tariff (First Amendment) Regulations, 2011
- Dated 21 Jun 2011Terms and Conditions of Tariff Regulations, 2009 — Second Amendment, 2011
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.