Skip to content

CERC · Central Electricity Regulatory Commission

Sharing of Inter State Transmission Charges and Losses Regulations, 2010

Central Electricity Regulatory Commission (Sharing of Inter State Transmission Charges and Losses) Regulations, 2010

RegulationDated 15 Jun 2010In force from 1 Jan 2011No.L-1/44/2010-CERC dated 15th June 2010

Replaced by Sharing of Inter-State Transmission Charges and Losses Regulations, 2020

See that regulation for the date it took effect and for anything it keeps in force.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken under the repealed regulations shall be deemed to have been done or taken under these regulations.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software, from pages 1 to 34 of 42. Check the regulator's original before you rely on it.

The Central Electricity Regulatory Commission's Sharing of Inter State Transmission Charges and Losses Regulations, 2010, notified on 15 June 2010, come into force on 1.1.2011 and remain in force for five years unless reviewed earlier or extended (p1). They bind Designated ISTS Customers, Inter State Transmission Licensees, NLDC, RLDCs, SLDCs and RPCs (p1).

The preliminary and scope chapters define the building blocks — approved injection and withdrawal (long, medium and short term), the Basic Network (132 kV and above, 110 kV where generators connect, plus HVDC and connected generation/load), the Designated ISTS Customer, the hybrid pricing methodology, Point of Connection (PoC) charges, the uniform/postage-stamp charge and Yearly Transmission Charge — and name the four categories of DIC that share ISTS charges and losses (pp1–5). Chapter 3 establishes the principles: load-flow based computation of PoC charges and loss allocation factors using the hybrid method set out in Annexure I, full and exact recovery of YTC, monthly recovery in Rs/MW/month (Rs/MW/hour for short-term open access), and loss apportionment through loss allocation factors (pp5–7).

Chapter 4 is the operational core: data collection and forecasting, AC load flow on the Basic Network, validation by a committee chaired by a Commission nominee with annual December approval, network truncation, apportionment of substation cost to lines, seasonal and peak/off-peak blocks, a transition weighting between the hybrid and postage-stamp mechanisms for the first two years, zoning rules (including separate zones for large thermal and hydro pooling stations), the deeming rule where generation falls off the reduced network, and an exemption from ISTS charges and losses for solar-based generation (pp7–14). Chapters 5 and 6 cover money and contracts: RPC monthly transmission accounts, four-part CTU billing (PoC charges, additional medium-term open access, true-up adjustments, deviations), collection and disbursement by RTGS, payment security, the mandatory Transmission Service Agreement and Model TSA, realignment of existing contracts and dispute resolution (pp15–22). Chapter 7 sets information and publication duties; Chapter 8 designates the Implementing Agency (NLDC for the first two years); Chapter 9 repeals specified provisions of the 2009 Tariff Regulations and the 2008 Open Access Regulations with a savings clause, and grants relaxation and difficulty-removal powers (pp22–26). Annexure I explains the PoC pricing philosophy, compares marginal and average participation methods, justifies the hybrid, sets out the eight-step implementation sequence and gives detailed load-flow input data formats (pp27–34).

Standard name
Sharing of Inter-State Transmission Charges and Losses
Primary topics
Transmission tariff, Losses and loss reduction, Billing and payment

Read with this

Other copies of these documents (7)

Earlier drafts

2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document