CERC · Central Electricity Regulatory Commission
Sharing of Inter State Transmission Charges and Losses Regulations, 2010
Central Electricity Regulatory Commission (Sharing of Inter State Transmission Charges and Losses) Regulations, 2010
RegulationDated 15 Jun 2010In force from 1 Jan 2011No.L-1/44/2010-CERC dated 15th June 2010
Replaced by Sharing of Inter-State Transmission Charges and Losses Regulations, 2020
See that regulation for the date it took effect and for anything it keeps in force.
Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken under the repealed regulations shall be deemed to have been done or taken under these regulations.”
Summary
Summary written by software, from pages 1 to 34 of 42. Check the regulator's original before you rely on it.
The Central Electricity Regulatory Commission's Sharing of Inter State Transmission Charges and Losses Regulations, 2010, notified on 15 June 2010, come into force on 1.1.2011 and remain in force for five years unless reviewed earlier or extended (p1). They bind Designated ISTS Customers, Inter State Transmission Licensees, NLDC, RLDCs, SLDCs and RPCs (p1).
The preliminary and scope chapters define the building blocks — approved injection and withdrawal (long, medium and short term), the Basic Network (132 kV and above, 110 kV where generators connect, plus HVDC and connected generation/load), the Designated ISTS Customer, the hybrid pricing methodology, Point of Connection (PoC) charges, the uniform/postage-stamp charge and Yearly Transmission Charge — and name the four categories of DIC that share ISTS charges and losses (pp1–5). Chapter 3 establishes the principles: load-flow based computation of PoC charges and loss allocation factors using the hybrid method set out in Annexure I, full and exact recovery of YTC, monthly recovery in Rs/MW/month (Rs/MW/hour for short-term open access), and loss apportionment through loss allocation factors (pp5–7).
Chapter 4 is the operational core: data collection and forecasting, AC load flow on the Basic Network, validation by a committee chaired by a Commission nominee with annual December approval, network truncation, apportionment of substation cost to lines, seasonal and peak/off-peak blocks, a transition weighting between the hybrid and postage-stamp mechanisms for the first two years, zoning rules (including separate zones for large thermal and hydro pooling stations), the deeming rule where generation falls off the reduced network, and an exemption from ISTS charges and losses for solar-based generation (pp7–14). Chapters 5 and 6 cover money and contracts: RPC monthly transmission accounts, four-part CTU billing (PoC charges, additional medium-term open access, true-up adjustments, deviations), collection and disbursement by RTGS, payment security, the mandatory Transmission Service Agreement and Model TSA, realignment of existing contracts and dispute resolution (pp15–22). Chapter 7 sets information and publication duties; Chapter 8 designates the Implementing Agency (NLDC for the first two years); Chapter 9 repeals specified provisions of the 2009 Tariff Regulations and the 2008 Open Access Regulations with a savings clause, and grants relaxation and difficulty-removal powers (pp22–26). Annexure I explains the PoC pricing philosophy, compares marginal and average participation methods, justifies the hybrid, sets out the eight-step implementation sequence and gives detailed load-flow input data formats (pp27–34).
Read with this
Amendments and corrections
- Dated 24 Nov 2011Sharing of inter-State Transmission Charges and Losses, 2010 — First Amendment, 2011
- Dated 28 Mar 2012Sharing of inter-State Transmission Charges and Losses (Second Amendment) Regulations, 2012
- Dated 1 Apr 2015Sharing of Inter-State Transmission Charges and Losses Regulations, 2010 — Third Amendment, 2015
- Dated 1 Apr 2015Sharing of Inter-State Transmission Charges and Losses Regulations, 2010 — Third Amendment, 2015
- Dated 3 Jul 2015Sharing of inter-State Transmission Charges and Losses (Fourth Amendment) Regulations, 2015
- Dated 14 Dec 2017Sharing of Inter-State Transmission Charges and Losses (Fifth Amendment) Regulations, 2017
- Dated 27 Mar 2019Sharing of inter-State Transmission Charges and Losses Regulations, 2010 — Sixth Amendment, 2019
Commencement notices and reasons
- Dated 11 Jun 2010Sharing of Inter State Transmission Charges and Losses Regulations, 2010 — Statement of Reasons
- Dated 21 Nov 2011Sharing of inter-State Transmission Charges and Losses Regulations, 2010 — First Amendment, 2011 — Statement of Reasons
- Dated 2 May 2012Sharing of inter-State Transmission Charges and Losses Regulations, 2010 — Second Amendment, 2012 — Statement of Reasons
- Dated 18 Sep 2015Sharing of inter-State Transmission Charges and Losses (Fourth Amendment) Regulations, 2015 — Statement of Reasons
- Dated 26 Oct 2015Sharing of Inter-State Transmission Charges and Losses (Third Amendment) Regulations, 2015 — Statement of Reasons
- Dated 15 Dec 2017Sharing of Inter-State Transmission Charges and Losses Regulations, 2010 — 5th Amendment, 2017 — Statement of Reasons
- Dated 23 Apr 2019Sharing of inter-State Transmission Charges and Losses Regulations, 2010 — Sixth Amendment, 2018 — Statement of Reasons
- Date not statedComments on Draft Amendment to Sharing of Inter-State Transmission Charges and Losses (Third Amendment) Regulations, 2014
- Date not statedAppendix-II — Stakeholder comments on draft Third Amendment to the Sharing of Inter-State Transmission Charges and Losses Regulations, 2014
Procedures and orders made under it
Other copies of these documents (7)
- Dated 30 Dec 2010Sharing of Inter-State Transmission Charges and Losses Regulations, 2010 — Commencement Notification
- Dated 30 Dec 2010Sharing of Inter-State Transmission Charges and Losses Regulations, 2010 — Commencement Notification
- Dated 24 Nov 2011Sharing of Inter-State Transmission Charges and Losses Regulations, 2010 — First Amendment, 2011
- Dated 28 Mar 2012Sharing of Inter-State Transmission Charges and Losses (Second Amendment) Regulations, 2012
- Dated 3 Jul 2015Sharing of inter-State Transmission Charges and Losses Regulations, 2010 — Fourth Amendment, 2015
- Dated 14 Dec 2017Sharing of Inter-State Transmission Charges and Losses (Fifth Amendment) Regulations, 2017
- Dated 27 Mar 2019Sharing of inter-State Transmission Charges and Losses (Sixth Amendment) Regulations, 2019
Earlier drafts
- Dated 7 Feb 2014Sharing of Inter-State Transmission Charges and Losses, 2010 — Third Amendment, 2014 — Draft
- Released with the notice dated 7 Feb 2014Explanatory memorandum: Sharing of inter-State Transmission Charges and Losses Regulations, 2010 — Third Amendment — Explanatory Memorandum
- Dated 7 Feb 2014Public notice: Draft Sharing of inter-State Transmission Charges and Losses (Third Amendment) Regulations, 2014 — Public Notice
- Dated 24 Feb 2014Notice extending the date for comments: Public Notice — Extension of time for comments on draft Sharing of Inter-state Transmission Charges and Losses (Third Amendment) Regulations, 2014
- Dated 27 May 2015Sharing of inter-State Transmission Charges and Losses (Fourth Amendment) Regulations, 2015 — Draft
- Released with the notice dated 27 May 2015Explanatory memorandum: Explanatory Memorandum — Draft Sharing of inter-State Transmission Charges and Losses (Fourth Amendment) and Power System Development Fund (First Amendment) Regulations, 2015
- Dated 27 May 2015Public notice: Public Notice — Draft Sharing of inter-State Transmission Charges and Losses (Fourth Amendment) Regulations, 2015 and Draft Power System Development Fund (First Amendment) Regulations, 2015
- Dated 28 Oct 2016Sharing of Inter-State Transmission Charges and Losses Regulations, 2010 — Fifth Amendment, 2016 — Draft
- Released with the draft dated 28 Oct 2016Explanatory memorandum: Explanatory Memorandum to draft Connectivity, LTA and MTOA (Sixth Amendment) Regulations, 2015 and Sharing of Inter-State Transmission Charges and Losses (Fifth Amendment) Regulations, 2016 — Draft
- Dated 16 Nov 2016Notice extending the date for comments: Public Notice — Extension of comment deadline on draft Connectivity, LTA and MTOA (Sixth Amendment) and Sharing of Inter-State Transmission Charges & Losses (Fifth Amendment) Regulations, 2016
- Dated 27 Apr 2018Sharing of Inter State Transmission Charges and Losses Regulations, 2010 — Sixth Amendment, 2018 — Draft
- Dated 27 Apr 2018Public notice: Sharing of Inter-State Transmission Charges and Losses Regulations, 2010 — Sixth Amendment, 2018 — Draft — Public Notice
- Released with the notice dated 27 Apr 2018Explanatory memorandum: Sharing of Inter State Transmission Charges and Losses Regulations, 2010 — Sixth Amendment — Explanatory Memorandum — Draft
2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.