The Central Electricity Regulatory Commission (Terms and Conditions of Tariff)(third Amendment) Regulations, 2012.

Statement of reasonsDate not statedNo.L-7/142/157/2008-CERC

Replaced by Terms and Conditions of Tariff Regulations, 2014

See that regulation for the date it took effect and for anything it keeps in force.

The commission's reasons for the Terms and Conditions of Tariff Regulations, 2009 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software, from pages 1 to 37 of 47. Check the regulator's original before you rely on it.

This is CERC's Statement of Reasons for the Central Electricity Regulatory Commission (Terms and Conditions of Tariff)(Third Amendment) Regulations, 2012 (p1). It explains why the Commission proposed a mid-term amendment to the 2009 Tariff Regulations, records stakeholder comments from a 4.9.2012 public hearing, and sets out the Commission's final decisions with the amended text. The 2009 Tariff Regulations were in force from 1.4.2009 to 31.3.2014 (p1). The amendment is to apply from the date of notification, not retrospectively (p8).

The document opens with the consultation history and lists eleven broad areas of the draft amendment (a to k) (p1–2). It then works through them section by section. Section A (pp3–11) deals with additional return on equity for reservoir-based hydro projects. After considering objections from beneficiaries and consumer representatives and support from generators, the Commission extends the extra return to run-of-river hydro with pondage, not just storage and pumped storage, and quotes the amended Regulation 15(2) (pp10–11). Section B (pp11–18) covers fuel-price and GCV transparency. It adds provisos to Regulation 21(6) requiring generators to give beneficiaries fuel and blending details, post them on their website for three months, and use Form 15 of Part-I of Appendix I (pp17–18). Section C (pp18–22) allows capital cost or additional capex for infrastructure to supply rural households within 5 km, but only if the generating company does not treat the spending as CSR; the relevant Regulation 7(2) and 9(2)(ix) text is quoted (p21). Section D (pp22–23) retains initial spares norms for pumped storage and GIS substations. Section E (pp23–25) drops the proposed clause 9(2)(x) on indispensable expenditure for coal and lignite stations, because compensation allowance and other provisions already cover such costs.

Section F (pp25–35) is the largest part: it defines 'pumped storage hydro generating station', inserts Regulation 22A, and gives a tariff methodology for pumped storage. It specifies capacity charge and energy charge formulas, a 75% pumping-energy conversion benchmark, treatment of design energy and free power to the home State, sharing or recovery of excess generation, daily reservoir records, day-ahead availability, and an outage adjustment formula. The Commission revised its draft from 80 paise/kWh to 20 paise/kWh and simplified the earlier energy charge credit approach (pp32–34). It also inserts a sub-clause in Regulation 27 to make beneficiaries arrange pumping energy and receive peak-hour energy, with pro-rata reduction if they fail (pp34–35). Section G (pp36–37) relates to NHPC hydro stations in Jammu & Kashmir. It proposes Regulation 22(7a) to reimburse water usage charges and licence fees as additional energy charges, subject to the J&K High Court decision in OWP No.604/2011 and refund if NHPC succeeds (pp36–37).

The contents list at p2 also flags later parts not supplied here: applicability of certain provisions to CPSUs, reimbursement of RLDC charges and licence fees, consideration of post-cut-off-date capital expenditure, and deletion of Regulation 21(8).

Standard name
Tariff Regulations
Primary topics
Tariff determination, Generation tariff, Energy storage deployment

Read with this

The regulation

Commencement notices and reasons

Other copies of these documents (5)

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document