Terms and Conditions of Tariff (Third Amendment) Regulations, 2012

Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (Third Amendment) Regulations, 2012

AmendmentDated 31 Dec 2012No.–L- 7/145(160)/2012—CERC dated Dated, the 31st of December 2012

Replaced by Terms and Conditions of Tariff Regulations, 2014

See that regulation for the date it took effect and for anything it keeps in force.

Amends the Terms and Conditions of Tariff Regulations, 2009.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Third Amendment to the CERC (Terms and Conditions of Tariff) Regulations, 2009, notified on 31 December 2012, does one big thing and several smaller ones. The big thing is pumped storage hydro. Clause 2 adds a definition of 'pumped storage hydro generating station' to Regulation 3 and folds such stations into existing references to hydro stations (p1). Regulation 8 places them in the capital-spares category alongside other hydro stations and adds a new sub-category for gas-insulated substations (p2). Regulation 15 sets a higher pre-tax base return on equity for storage-type stations, including pumped storage and run-of-river with pondage, than for thermal stations, transmission and run-of-river stations (p3). A new Regulation 22A then builds a cost-recovery mechanism for these stations: annual fixed cost recovered monthly as capacity charge from beneficiaries in proportion to saleable capacity; a capacity-charge formula keyed to actual generation against pumping energy; and an energy-charge formula with a flat rate adjusted for free energy and pumping energy (p4–6). Regulation 27 obliges beneficiaries to arrange pumping energy and gives them a peak-hour entitlement in return, with pro-rata reduction if they fail (p7).

The rest is a mixed bag. Regulation 9 mirrors this in additional capitalisation (p2). Regulation 11 replaces the frequency-linked UI rate reference with a reference to the 2009 UI Regulations (p3). Regulation 21 requires generators to disclose fuel GCV, prices, blending ratios and e-auction proportions to beneficiaries and on their websites (p3). Regulation 22 adds a water-usage-charge pass-through for NHPC stations in Jammu and Kashmir, expressly subject to a pending High Court case (p4). Clause 13 adds Regulation 42A on reimbursement of fees and charges, with recovery of amounts already paid permitted (p7–8).

The regulations take effect from Gazette publication; the Gazette date is not printed. The closing Note records the publication dates of the Principal Regulations and the first two amendments (p8).

Standard name
Tariff Regulations
Primary topics
Energy storage deployment, Tariff determination, Generation tariff

Read with this

The regulation

Other copies of these documents (5)

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document