CERC · Central Electricity Regulatory Commission
Terms and Conditions of Tariff (Third Amendment) Regulations, 2012
Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (Third Amendment) Regulations, 2012
AmendmentDated 31 Dec 2012No.–L- 7/145(160)/2012—CERC dated Dated, the 31st of December 2012
Replaced by Terms and Conditions of Tariff Regulations, 2014
See that regulation for the date it took effect and for anything it keeps in force.
Amends the Terms and Conditions of Tariff Regulations, 2009.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Third Amendment to the CERC (Terms and Conditions of Tariff) Regulations, 2009, notified on 31 December 2012, does one big thing and several smaller ones. The big thing is pumped storage hydro. Clause 2 adds a definition of 'pumped storage hydro generating station' to Regulation 3 and folds such stations into existing references to hydro stations (p1). Regulation 8 places them in the capital-spares category alongside other hydro stations and adds a new sub-category for gas-insulated substations (p2). Regulation 15 sets a higher pre-tax base return on equity for storage-type stations, including pumped storage and run-of-river with pondage, than for thermal stations, transmission and run-of-river stations (p3). A new Regulation 22A then builds a cost-recovery mechanism for these stations: annual fixed cost recovered monthly as capacity charge from beneficiaries in proportion to saleable capacity; a capacity-charge formula keyed to actual generation against pumping energy; and an energy-charge formula with a flat rate adjusted for free energy and pumping energy (p4–6). Regulation 27 obliges beneficiaries to arrange pumping energy and gives them a peak-hour entitlement in return, with pro-rata reduction if they fail (p7).
The rest is a mixed bag. Regulation 9 mirrors this in additional capitalisation (p2). Regulation 11 replaces the frequency-linked UI rate reference with a reference to the 2009 UI Regulations (p3). Regulation 21 requires generators to disclose fuel GCV, prices, blending ratios and e-auction proportions to beneficiaries and on their websites (p3). Regulation 22 adds a water-usage-charge pass-through for NHPC stations in Jammu and Kashmir, expressly subject to a pending High Court case (p4). Clause 13 adds Regulation 42A on reimbursement of fees and charges, with recovery of amounts already paid permitted (p7–8).
The regulations take effect from Gazette publication; the Gazette date is not printed. The closing Note records the publication dates of the Principal Regulations and the first two amendments (p8).
Read with this
The regulation
- Dated 19 Jan 2009Terms and Conditions of Tariff Regulations, 2009
Amendments and corrections
- Dated 10 Jun 2009Terms and Conditions of Tariff Regulations, 2009 — Addendum, 2009
- Dated 10 Jun 2009Terms and Conditions of Tariff Regulations, 2009 — Corrigendum, 10 June 2009
- Dated 2 May 2011Terms and Conditions of Tariff Regulations, 2009 — First Amendment, 2011
- Dated 21 Jun 2011Terms and Conditions of Tariff Regulations, 2009 — Second Amendment, 2011
- Dated 15 Jun 2010Changes some provisions: Sharing of ISTS Charges and Losses Regulations, 2010
- Dated 15 Jun 2010Changes some provisions: Sharing of Inter State Transmission Charges and Losses Regulations, 2010
Commencement notices and reasons
- Dated 3 Feb 2009Terms and Conditions of Tariff Regulations, 2009 — Statement of Objects and Reasons
- Dated 20 Jul 2010Vetting of Capital Cost of Hydro-Electric Projects — Statement of Reasons
- Dated 21 Jun 2011Tariff Second Amendment 2011 — Statement of Reasons
- Date not statedTerms and Conditions of Tariff, 2009 — Third Amendment, 2012 — Statement of Reasons
Procedures and orders made under it
Other copies of these documents (5)
- Dated 19 Jan 2009Terms and Conditions of Tariff Regulations, 2009
- Dated 2 Aug 2010Hydro Electric Project Capital Cost Vetting Guidelines, 2010
- Dated 2 May 2011Terms and Conditions of Tariff (First Amendment) Regulations, 2011
- Dated 21 Jun 2011Terms and Conditions of Tariff Regulations, 2009 — Second Amendment, 2011
- Dated 31 Dec 2012Terms and Conditions of Tariff Regulations, 2009 — Third Amendment, 2012
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.