CERC · Central Electricity Regulatory Commission
Tariff Second Amendment 2011 — Statement of Reasons
Tariff Second Amendment 2011 - Statement of Reasons
Statement of reasonsDated 21 Jun 2011No. L-7/145(160)/2008-CERC dated 21st June, 2011
Replaced by Terms and Conditions of Tariff Regulations, 2014
See that regulation for the date it took effect and for anything it keeps in force.
The commission's reasons for the Terms and Conditions of Tariff Regulations, 2009 or one of its amendments.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is CERC's Statement of Reasons dated 21 June 2011 for the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (Second Amendment) Regulations, 2011 (p1). It explains why CERC proposed changes to the 2009 Tariff Regulations, records stakeholder comments received after a draft was published on the Commission's website on 3.9.2010, and reports the Commission's reasoning after an open hearing on 21.10.2010 (p4). It is not the operative amendment text; the actual Regulations are separate.
It opens with a July 2009 Task Force under CEA chair Rakesh Nath examining peaking power tariffs and differential peak/off-peak tariffs (p1). The Commission proposed peak/off-peak options for existing and new thermal, hydro, gas peaking and pumped storage stations, but dropped them because the Ministry of Power Tariff Policy did not exempt peaking plants from competitive bidding with effect from 5.1.2011 (p5–6).
It then covers amendments to Regulations 5, 6 and 18: linking interest rates to the RBI Base Rate instead of PLR, and retaining SBI Base Rate plus 350 basis points after rejecting stakeholder calls for higher spreads and UPPCL's legal objections (p5–8). For Regulation 7, it explains upfront truing up of capital cost as on 1.4.2009 for un-discharged liabilities, following APTEL's 10.12.2008 judgment and subject to Supreme Court appeals (p8–12). For Regulation 9, it adds additional capitalisation for gas turbine renovation after about 15 years, rejecting extension to coal/lignite stations (p12–14). For Regulation 15, it explains grossing up return on equity with the applicable MAT/tax rate under the Finance Act, with year-on-year settlement (p15–17). For Regulation 18, it clarifies liquid fuel stock is calculated by mode of operation on gas and liquid fuel (p17–18). For Regulation 32, it replaces the transmission charges sharing methodology with the CERC Sharing Regulations 2010 from that regulation's effective date, which the Commission states as 1.7.2011 (p18). Annexure-I lists stakeholders who commented (p19).
Read with this
The regulation
- Dated 19 Jan 2009Terms and Conditions of Tariff Regulations, 2009
Amendments and corrections
- Dated 10 Jun 2009Terms and Conditions of Tariff Regulations, 2009 — Addendum, 2009
- Dated 10 Jun 2009Terms and Conditions of Tariff Regulations, 2009 — Corrigendum, 10 June 2009
- Dated 2 May 2011Terms and Conditions of Tariff Regulations, 2009 — First Amendment, 2011
- Dated 21 Jun 2011Terms and Conditions of Tariff Regulations, 2009 — Second Amendment, 2011
- Dated 31 Dec 2012Terms and Conditions of Tariff (Third Amendment) Regulations, 2012
- Dated 15 Jun 2010Changes some provisions: Sharing of ISTS Charges and Losses Regulations, 2010
- Dated 15 Jun 2010Changes some provisions: Sharing of Inter State Transmission Charges and Losses Regulations, 2010
Commencement notices and reasons
Procedures and orders made under it
Other copies of these documents (5)
- Dated 19 Jan 2009Terms and Conditions of Tariff Regulations, 2009
- Dated 2 Aug 2010Hydro Electric Project Capital Cost Vetting Guidelines, 2010
- Dated 2 May 2011Terms and Conditions of Tariff (First Amendment) Regulations, 2011
- Dated 21 Jun 2011Terms and Conditions of Tariff Regulations, 2009 — Second Amendment, 2011
- Dated 31 Dec 2012Terms and Conditions of Tariff Regulations, 2009 — Third Amendment, 2012
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.