CERC · Central Electricity Regulatory Commission
Terms and Conditions of Tariff Regulations, 2009
Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2009
Regulation · Gazette copyDated 19 Jan 2009In force from 1 Apr 2009No. L-7/145(160)/2008-CERC. dated the 19th January, 2009
Replaced by Terms and Conditions of Tariff Regulations, 2014
See that regulation for the date it took effect and for anything it keeps in force.
The Gazette copy of the Terms and Conditions of Tariff Regulations, 2009.
Summary
Summary written by software, from pages 1 to 233 of 341. Check the regulator's original before you rely on it.
This is the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2009, notified at New Delhi on 19 January 2009 under No. L-7/145(160)/2008-CERC (p191). They come into force on 1.4.2009 and, unless reviewed earlier or extended, run for five years — the 2009-14 tariff period. They apply wherever the Commission determines tariff for a generating station or a unit of it (excluding non-conventional energy sources) or for a transmission system, under section 62 read with section 79 of the Electricity Act (pp191–192).
Chapter 1 (pp191–199) sets commencement, the transitional rule for projects already under commercial operation, and the working vocabulary for everything that follows: capital cost, COD, cut-off date, declared capacity, design energy, PAF/NAPAF, infirm power, useful life by asset class, and the special meaning given to 'change in law'.
Chapter 2 (pp200–209) is the procedural and capital-cost half of the regulation. It describes how tariff applications are filed (units or lines completed or projected within six months), how existing projects bill provisionally until tariff is approved and how over- or under-recovery is settled with interest, and the truing-up exercise on capital expenditure with its filing deadline (pp200–202). It then defines capital cost and prudence check, including benchmark norms and special treatment for hydro sites awarded by two-stage bidding, R&R costs and the developer's RGGVY contribution (pp203–205); ceiling norms for capitalising initial spares (p205); the heads of admissible additional capitalisation before and after the cut-off date (pp205–207); the renovation-and-modernisation route and the optional 'special allowance' for coal/lignite stations taken in lieu of capital cost revision (pp207–208); and the debt-equity treatment of equity in excess of, or below, the norm (pp208–209).
Chapter 3 (pp210–231) computes the tariff. It splits thermal and hydro tariffs into capacity charge and energy charge and ISTS tariff into a transmission charge (p210), lists the components of annual fixed cost (p210), and then works through each component in turn — return on equity and its grossing-up for tax, interest on loan and the sharing of re-financing savings, depreciation, interest on working capital with its fuel-stock and spares build-up, normative O&M expenses by station type, size and technology, secondary fuel oil cost with fuel-price adjustment, and the monthly formulae for capacity charge, energy charge and transmission charge (pp211–230). Embedded here are the treatment of infirm power as UI, the hydro ECR cap and rolling design-energy moderation, and unscheduled interchange for deviations (pp208, 221–230).
Chapter 4 (from p231) contains the norms of operation — normative annual plant availability factor, gross station heat rate and the rest — and makes recovery of capacity charge, energy charge, transmission charge and incentive conditional on achieving them; the Commission may itself revise heat-rate norms for stations on relaxed norms. Appendices I–IV (application format, commissioning timelines, depreciation rates, transmission availability computation) are cross-referenced throughout.
Read with this
The regulation
- Dated 19 Jan 2009Terms and Conditions of Tariff Regulations, 2009
Amendments and corrections
- Dated 10 Jun 2009Terms and Conditions of Tariff Regulations, 2009 — Addendum, 2009
- Dated 10 Jun 2009Terms and Conditions of Tariff Regulations, 2009 — Corrigendum, 10 June 2009
- Dated 2 May 2011Terms and Conditions of Tariff Regulations, 2009 — First Amendment, 2011
- Dated 21 Jun 2011Terms and Conditions of Tariff Regulations, 2009 — Second Amendment, 2011
- Dated 31 Dec 2012Terms and Conditions of Tariff (Third Amendment) Regulations, 2012
- Dated 15 Jun 2010Changes some provisions: Sharing of ISTS Charges and Losses Regulations, 2010
- Dated 15 Jun 2010Changes some provisions: Sharing of Inter State Transmission Charges and Losses Regulations, 2010
Commencement notices and reasons
- Dated 3 Feb 2009Terms and Conditions of Tariff Regulations, 2009 — Statement of Objects and Reasons
- Dated 20 Jul 2010Vetting of Capital Cost of Hydro-Electric Projects — Statement of Reasons
- Dated 21 Jun 2011Tariff Second Amendment 2011 — Statement of Reasons
- Date not statedTerms and Conditions of Tariff, 2009 — Third Amendment, 2012 — Statement of Reasons
Procedures and orders made under it
Other copies of these documents (4)
- Dated 2 Aug 2010Hydro Electric Project Capital Cost Vetting Guidelines, 2010
- Dated 2 May 2011Terms and Conditions of Tariff (First Amendment) Regulations, 2011
- Dated 21 Jun 2011Terms and Conditions of Tariff Regulations, 2009 — Second Amendment, 2011
- Dated 31 Dec 2012Terms and Conditions of Tariff Regulations, 2009 — Third Amendment, 2012
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.