Skip to content

CERC · Central Electricity Regulatory Commission

Terms and Conditions of Tariff Regulations, 2009

Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2009

Regulation · Gazette copyDated 19 Jan 2009In force from 1 Apr 2009No. L-7/145(160)/2008-CERC. dated the 19th January, 2009

Replaced by Terms and Conditions of Tariff Regulations, 2014

See that regulation for the date it took effect and for anything it keeps in force.

The Gazette copy of the Terms and Conditions of Tariff Regulations, 2009.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software, from pages 1 to 233 of 341. Check the regulator's original before you rely on it.

This is the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2009, notified at New Delhi on 19 January 2009 under No. L-7/145(160)/2008-CERC (p191). They come into force on 1.4.2009 and, unless reviewed earlier or extended, run for five years — the 2009-14 tariff period. They apply wherever the Commission determines tariff for a generating station or a unit of it (excluding non-conventional energy sources) or for a transmission system, under section 62 read with section 79 of the Electricity Act (pp191–192).

Chapter 1 (pp191–199) sets commencement, the transitional rule for projects already under commercial operation, and the working vocabulary for everything that follows: capital cost, COD, cut-off date, declared capacity, design energy, PAF/NAPAF, infirm power, useful life by asset class, and the special meaning given to 'change in law'.

Chapter 2 (pp200–209) is the procedural and capital-cost half of the regulation. It describes how tariff applications are filed (units or lines completed or projected within six months), how existing projects bill provisionally until tariff is approved and how over- or under-recovery is settled with interest, and the truing-up exercise on capital expenditure with its filing deadline (pp200–202). It then defines capital cost and prudence check, including benchmark norms and special treatment for hydro sites awarded by two-stage bidding, R&R costs and the developer's RGGVY contribution (pp203–205); ceiling norms for capitalising initial spares (p205); the heads of admissible additional capitalisation before and after the cut-off date (pp205–207); the renovation-and-modernisation route and the optional 'special allowance' for coal/lignite stations taken in lieu of capital cost revision (pp207–208); and the debt-equity treatment of equity in excess of, or below, the norm (pp208–209).

Chapter 3 (pp210–231) computes the tariff. It splits thermal and hydro tariffs into capacity charge and energy charge and ISTS tariff into a transmission charge (p210), lists the components of annual fixed cost (p210), and then works through each component in turn — return on equity and its grossing-up for tax, interest on loan and the sharing of re-financing savings, depreciation, interest on working capital with its fuel-stock and spares build-up, normative O&M expenses by station type, size and technology, secondary fuel oil cost with fuel-price adjustment, and the monthly formulae for capacity charge, energy charge and transmission charge (pp211–230). Embedded here are the treatment of infirm power as UI, the hydro ECR cap and rolling design-energy moderation, and unscheduled interchange for deviations (pp208, 221–230).

Chapter 4 (from p231) contains the norms of operation — normative annual plant availability factor, gross station heat rate and the rest — and makes recovery of capacity charge, energy charge, transmission charge and incentive conditional on achieving them; the Commission may itself revise heat-rate norms for stations on relaxed norms. Appendices I–IV (application format, commissioning timelines, depreciation rates, transmission availability computation) are cross-referenced throughout.

Standard name
Tariff Regulations
Primary topics
Tariff determination, Generation tariff, Transmission tariff

Read with this

The regulation

Other copies of these documents (4)

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document