Skip to content

MERC · Maharashtra Electricity Regulatory Commission

State Grid Code, 2020 — Second Amendment, 2026 — Draft

Maharashtra Electricity Regulatory Commission (State Grid Code) (Second Amendment) Regulations, 2026

Draft amendmentReleased with the explanatory memorandum dated 22 Sep 2026No. MERC/Tech/Regulation/2026/ dated ____ September, 2026

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a draft MERC notification amending the Maharashtra Electricity Regulatory Commission (State Grid Code) Regulations, 2020 as already amended by the First Amendment Regulations, 2026. Clause 1 gives the short title, extends the regulations to the whole of Maharashtra, and makes them effective from Gazette publication with continuance until the Commission amends them (p1).

Clause 2 inserts two definitions into Regulation 2.1 — Energy Storage System (ESS) and Renewable Energy Generating Station (REGS), the latter covering renewable stations with or without storage and renewable hybrids (p1).

The remaining clauses write storage and renewables into the Grid Code's operative chapters. A proviso under Regulation 17 (Connection Standards) subjects BESS and REGS connected to, or seeking connection with, the Intra-State Transmission System to the Grid Code together with CEA technical standards and Commission-approved connectivity, communication and protection standards (p2). New Regulations 30.15–30.17 place BESS under SLDC directions on charging, discharging and system security, require real-time operational data to SLDC, and require compliance with SLDC instructions on frequency support, voltage regulation, congestion management, reserves and system restoration (p2). New Regulations 50.2.17–50.2.18 bring BESS into scheduling and despatch with separately identified charge/discharge schedules and DSM exposure, and deem the BESS owner or operator a State Entity carrying six listed duties spanning connectivity, data, telemetry, SLDC directions, schedules and further obligations (p2–3). Clause 7 adds ESS and REGS connected to InSTS to the matters listed under Regulation 70.1 of Part H, the Metering Code (p3). Clause 3 announces an amendment to Regulation 4 on scope but sets out no operative text (p1–2).

Standard name
Grid Code
Primary topics
Energy storage deployment, Grid operation and grid code, Scheduling and despatch

Read with this

The regulation

Amendments and corrections

2 more documents belong here and are not on Voltaic: 1 copy in another language and 1 draft or notice on a draft not held as English text.

Voltaic last read MERC's website for final documents on 28 Nov 2026 (8 pages) and for drafts on 28 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document