MERC · Maharashtra Electricity Regulatory Commission
State Grid Code, 2020 — Second Amendment, 2026 — Draft
Maharashtra Electricity Regulatory Commission (State Grid Code) (Second Amendment) Regulations, 2026
Draft amendmentReleased with the explanatory memorandum dated 22 Sep 2026No. MERC/Tech/Regulation/2026/ dated ____ September, 2026
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a draft MERC notification amending the Maharashtra Electricity Regulatory Commission (State Grid Code) Regulations, 2020 as already amended by the First Amendment Regulations, 2026. Clause 1 gives the short title, extends the regulations to the whole of Maharashtra, and makes them effective from Gazette publication with continuance until the Commission amends them (p1).
Clause 2 inserts two definitions into Regulation 2.1 — Energy Storage System (ESS) and Renewable Energy Generating Station (REGS), the latter covering renewable stations with or without storage and renewable hybrids (p1).
The remaining clauses write storage and renewables into the Grid Code's operative chapters. A proviso under Regulation 17 (Connection Standards) subjects BESS and REGS connected to, or seeking connection with, the Intra-State Transmission System to the Grid Code together with CEA technical standards and Commission-approved connectivity, communication and protection standards (p2). New Regulations 30.15–30.17 place BESS under SLDC directions on charging, discharging and system security, require real-time operational data to SLDC, and require compliance with SLDC instructions on frequency support, voltage regulation, congestion management, reserves and system restoration (p2). New Regulations 50.2.17–50.2.18 bring BESS into scheduling and despatch with separately identified charge/discharge schedules and DSM exposure, and deem the BESS owner or operator a State Entity carrying six listed duties spanning connectivity, data, telemetry, SLDC directions, schedules and further obligations (p2–3). Clause 7 adds ESS and REGS connected to InSTS to the matters listed under Regulation 70.1 of Part H, the Metering Code (p3). Clause 3 announces an amendment to Regulation 4 on scope but sets out no operative text (p1–2).
Read with this
The regulation
- Date not statedState Grid Code Regulations, 2020
Amendments and corrections
- Dated 21 Sep 2026State Grid Code, 2020 — First Amendment Regulations, 2026
Commencement notices and reasons
- Dated 2 Sep 2020State Grid Code Regulations, 2020 — Statement of Reasons
- Dated 25 Sep 2020Operationalisation of Merit Order Stack and Technical Minimum at 55% under State Grid Code Regulations, 2020 — Notification
- Dated 9 Mar 2022Reactive Energy Accounting Framework for Intra-State Hydro Generating Stations under the State Grid Code Regulations, 2020 — Notification, 2022
- Dated 21 Sep 2026State Grid Code (First Amendment) Regulations, 2026 — Statement of Reasons
Earlier drafts
- Released with the notice dated 1 Mar 2020Maharashtra State Grid Code Regulations, 2020 — Draft
- Released with the notice dated 1 Mar 2020Explanatory memorandum: Draft State Grid Code Regulations, 2020 — Explanatory Memorandum
- Dated 1 Mar 2020Public notice: Draft State Grid Code Regulations, 2020 — Public Consultation Notice
- Dated 23 Mar 2020Notice extending the date for comments: Draft State Grid Code Regulations, 2020 — Extension of Time for Submitting Comments
- Dated 16 Apr 2020Notice extending the date for comments: Draft State Grid Code Regulations, 2020 — Comment Deadline Extension Notice, 16 April 2020
- Released with the notice dated 2 Aug 2025State Grid Code (First Amendment) Regulations, 2025 — Draft
- Dated 2 Aug 2025Public notice: Public Notice — Comments on Draft Deviation Settlement Mechanism Regulations, 2025 and Draft State Grid Code (First Amendment) Regulations, 2025
- Released with the notice dated 2 Aug 2025Explanatory memorandum: State Grid Code Regulations, 2020 — First Amendment, 2025 — Explanatory Memorandum — Draft
- Dated 5 Sep 2025Notice extending the date for comments: Public Notice — Extension of time for filing comments on Draft Deviation Settlement Mechanism Regulations, 2025 and Draft State Grid Code (First Amendment) Regulations, 2025
2 more documents belong here and are not on Voltaic: 1 copy in another language and 1 draft or notice on a draft not held as English text.
Voltaic last read MERC's website for final documents on 28 Nov 2026 (8 pages) and for drafts on 28 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.