Search the library
Filters
Topic
DistributionGeneral / AdministrativeRenewable EnergyTariff & PricingGrid OperationsOpen AccessLicensing & ComplianceTransmissionYear
Showing the best matches for “storage drawal T-GNA”: 12 documents. There may be more. Add words, or choose a regulator or a type, to narrow the search.
Connectivity and GNA to the inter-State Transmission System Regulations, 2022 — Third Amendment, 2025
Amends the Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022
- Modalities of Solar Hour Access and Non-Solar Hour Access › (1) Grant of Connectivity with non-solar hour access to an …… from the Grid throughout the day for the purpose of charging power for storage, for quantum as applied for and permitted by the Nodal Agency vide the grant of Connectivity to such entity, in terms of these regulations, subject to …
- 54. Amendment to Regulation 37.2 of the Principal … › 55. New Regulation 37.10Entity shall specify the maximum drawal required from the grid for such additional capacity (for the purpose of charging power for storage), within the quantum of Connectivity, which shall be processed by the Nodal Agency based on …
3 matching passages in this document
Sharing of Inter-State Transmission Charges and Losses (First Amendment) Regulations, 2023
Amends the Sharing of Inter-State Transmission Charges and Losses Regulations, 2020
- 9. Amendment to Regulation 11 of the Principal Regulations › 10. Amendment to Regulation 12 of the Principal Regulations… transmission deviation in a time block shall be net metered drawal in excess of sum of GNA and T-GNA for all drawee DICs which are intra-State entities in that State: Provided that, where a State has net metered injection in a time …
- 9. Amendment to Regulation 11 of the Principal Regulations › 10. Amendment to Regulation 12 of the Principal Regulations… transmission deviation in a time block shall be net metered drawal in excess of sum of [scheduled drawl under GNARE and T-GNARE from identified sources as specified in subclauses (i) to (iii) under Regulation 13(2) of the Principal …
3 matching passages in this document
Connectivity and General Network Access Regulations, 2022 — Removal of Difficulties Order, 2025
Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022
4 amendments on Voltaic
Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022 — Consolidated
- ISTS drawal at HVDC substations have been combined at … › Modalities of Solar Hour Access and Non-Solar Hour Access… from the Grid throughout the day for the purpose of charging power for storage, for quantum as applied for and permitted by the Nodal Agency vide the grant of Connectivity to such entity, in terms of these regulations, subject to …
- 1. Short Title and Commencement › 2. Definition… (ii) the agency designated for T-GNA for bilateral transactions which shall be RLDC of the region where point of drawal is located, for the purpose of Regulations 26 to 36 of these regulations; …
3 matching passages in this document
Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022 — Third Amendment, 2025
- 62. New Annexure-IV › (1) Grant of Connectivity with non-solar hour access to an …… from the Grid throughout the day for the purpose of charging power for storage, for quantum as applied for and permitted by the Nodal Agency vide the grant of Connectivity to such entity, in terms of these regulations, subject to …
- 54. Amendment to Regulation 37.2 of the Principal … › 55. New Regulation 37.10Entity shall specify the maximum drawal required from the grid for such additional capacity (for the purpose of charging power for storage), within the quantum of Connectivity, which shall be processed by the Nodal Agency based on …
3 matching passages in this document
Indian Electricity Grid Code Regulations, 2023 — Third Removal of Difficulties Order, 2024
Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022
- Preliminary › 2. Definition(ii) the agency designated for T-GNA for bilateral transactions which shall be RLDC of the region where point of drawal is located, for the purpose of Regulations 26 to 36 of these regulations;
- 28. Application for grant of T-GNA › 28.6. Application for grant of T-GNA, under bilateral …Application for grant of T-GNA for collective transactions by a power exchange shall contain Regional entity-wise injection or drawal (in MW) for each block. 28.8. The application fees in case of rejection of application for T-GNA shall be …
2 matching passages in this document
Indian Electricity Grid Code Regulations, 2023
1 amendment on Voltaic
Indian Electricity Grid Code Regulations, 2023
Connectivity and General Network Access to the inter-State Transmission System (First Amendment) Regulations, 2023
Amends the Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022
- 22.2. The number "24" shall be substituted with number "18" … › 23. New Regulation 26.4, Regulation 26.5 and Regulation 26.6… or (b) it may convert full T-GNARE into T-GNA by making an application to the Nodal Agency. 26.5 The entities covered under Regulation 26.4 of these regulations may apply for additional GNARE or T-GNARE, in case their drawal requirement …
- 14.1. A new Regulation, namely, Regulation 18.3 shall be … › 16.1. New Regulations 20.4, 20.5 and 20.6 shall be added …20.5 The entities covered under Regulation 20.4 of these regulations may apply for additional GNARE or T-GNARE, in case their drawal requirement is more than quantum of GNARE. …
3 matching passages in this document
Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022 — First Amendment, 2023
- 16. New Regulation 20.4, Regulation 20.5 and Regulation 20.6 › 23. New Regulation 26.4, Regulation 26.5 and Regulation 26.6… or (b) it may convert full T-GNARE into T-GNA by making an application to the Nodal Agency. 26.5 The entities covered under Regulation 26.4 of these regulations may apply for additional GNARE or T-GNARE, in case their drawal requirement …
- CENTRAL ELECTRICITY REGULATORY COMMISSION NOTIFICATION › 16. New Regulation 20.4, Regulation 20.5 and Regulation 20.620.5 The entities covered under Regulation 20.4 of these regulations may apply for additional GNARE or T-GNARE, in case their drawal requirement is more than quantum of GNARE. …
3 matching passages in this document