Indian Electricity Grid Code Regulations, 2023 — Third Removal of Difficulties Order, 2024

Removal of difficulties (Third Order) in giving effect to certain provisions of Central Electricity Regulatory Commission (Indian Electricity Grid Code) Regulations, 2023.

OrderDated 22 Dec 2024Petition No. 11/SM/2024 dated 22.12.2024

Made under the Indian Electricity Grid Code Regulations, 2023.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a CERC suo motu order (Petition 11/SM/2024, dated 22.12.2024) that clears practical difficulties in working the Indian Electricity Grid Code, 2023 until the Code itself is amended (p1, p8). It is the third such removal-of-difficulties order, after those of 30.09.2023 and 18.12.2023, and it sits alongside the Grid Code's First Amendment of 29.10.2024 (p1).

The trigger is scheduling of 'infirm' power — electricity injected before a plant's commercial operation date (COD) for testing and commissioning. NLDC's letter of 30.09.2024 asked the Commission to spell out scheduling modalities, noting the Grid Code covers scheduling under GNA and T-GNA but not infirm power, and proposing separate routes: for general sellers (other than REGS/ESS) after first synchronization, with a maximum infirm-injection period; and for WS sellers (REGS including ESS) after successful trial run, from 00 hours of D+2 (pp1–2). The Commission records that RLDCs already schedule such power, and that the DSM First Amendment Regulations 2024, effective 23.12.2024, make charges for injection of infirm power zero while applying general-seller/WS-seller deviation charges above scheduled infirm power (p3).

After reviewing Regulations 19, 21, 22, 24, 25(2), 26 and 27 of the Grid Code (pp3–7), the Commission directs three things. First, for projects under Regulation 22(3)(a) with installed capacity of 250 MW or more, trial runs may be performed in instalments with no limit on the number of instalments (p4). Second, notwithstanding anything contrary in a PPA, scheduling of power is allowed only after the RLDC issues a successful trial run certificate; before that, each occasion of infirm-power interchange needs prior RLDC permission, and RLDCs must keep records (p6). Third, power injected after a successful trial run is governed by the PPA where it speaks to it, otherwise beneficiaries (or the REIA/intermediary procurer) get a first right of refusal on seven days' notice, with non-response treated as deemed refusal and market sale permitted (p7).

The directions are issued under Regulation 58 read with Regulation 60 of the Grid Code, remain in force only until the Grid Code is amended, and dispose of the petition (p8).

Standard name
Grid Code
Primary topics
Grid operation and grid code, Scheduling and despatch, Deviation settlement (DSM)

Read with this

The regulation

Amendments and corrections

Commencement notices and reasons

Other copies of these documents (2)

Earlier drafts

6 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft not held as English text and 2 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document