Skip to content

CERC · Central Electricity Regulatory Commission

Connectivity and General Network Access Regulations, 2022 — Removal of Difficulties Order, 2025

Removal of Difficulties in giving effect to certain provisions of Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) Regulations, 2022

OrderDated 8 Dec 2025Petition No. 14/SM/2025 dated 08.12.2025

Made under the Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

CERC's suo motu order in Petition No. 14/SM/2025, dated 08.12.2025, uses the power to remove difficulty in Regulation 42 read with Regulation 44 of the (Connectivity and General Network Access to the inter-State Transmission System) Regulations, 2022 to work through seven implementation problems thrown up by the Third Amendment (notified 31.08.2025, effective 09.09.2025), which introduced solar-hour and non-solar-hour access. It ends in a practice direction to CTUIL (p1–2, p16–17).

Issue No. 1 (p2–6) responds to letters from RE developers and their associations and extends, as a one-time measure, the window for existing solar-based REGS/RPPD to apply for non-solar-hour capacity while converting to solar hour access, and the window for RPPDs to declare SCODs. NSEFI's request to delete Regulation 37.10(g) is refused, but its timeline is extended on the same basis.

Issue No. 2 (p6–8) clarifies that inverters, WTGs or equivalent equipment installed only for reactive power compensation, internal (DTL) losses or other technical compliance at the point of injection are not additional capacity under Regulations 5.1/5.2, attract no additional connectivity bank guarantees or Regulation 5.8 compliance, and are to be confirmed by CTUIL through Conn-4 system studies.

Issue No. 3 (p9–10) lets ESS whose final grant records NIL drawal — and REGS with ESS transitioning under Regulation 37.10(e) — charge from the grid under T-GNA within granted connectivity on available margins, pending the nodal agency's drawal study, which CTU is directed to finish within four months.

Issue No. 4 (p10–11) makes the one-change-only restriction on land parcels operate only on changes sought after the Third Amendment, so earlier changes do not consume the option. Issue No. 5 (p11–14) makes RPPDs eligible to apply for non-solar-hour access only for the limited purpose of exercising ROFR, and aligns the Annexure-IV clause (4) window with Regulation 5.11(b). Issue No. 6 (p14–15) gives entities holding pre-amendment in-principle grants one chance to change renewable energy source under Regulation 9.3, regardless of prior changes or expiry of the 18-month condition. Issue No. 7 (p15–16) directs CTUIL to allow at least nine months from communication of tentative coordinates for land documents where CTU delay leaves no coordinates.

The petition is disposed of (p17).

Standard name
Connectivity and GNA Regulations
Primary topics
Connectivity and GNA, Energy storage deployment, Power quality

Read with this

Consolidated copies, for reference (1)

Other copies of these documents (5)

Earlier drafts

16 more documents belong here and are not on Voltaic: 12 drafts or notices on a draft not held as English text and 4 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document