MERC · Maharashtra Electricity Regulatory Commission
Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019
Maharashtra Electricity Regulatory Commission (Grid Interactive Rooftop Renewable Energy Generating Systems) Regulations, 2019
Gazette copyDate not statedNo. MERC / Tech /Regulation/2019 /1234
A Gazette copy of the Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 or of one of its amendments.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Maharashtra Electricity Regulatory Commission issued these principal Regulations under Sections 86(1)(e) and 181 of the Electricity Act, 2003 to govern grid-interactive rooftop and other behind-the-meter renewable energy generating systems in Maharashtra. They extend to the whole State and come into force on Gazette publication, which is not printed here (p31). They apply to net metering, net billing, and behind-the-meter RE systems not opting for either, and to applications received on or after notification (p35).
Pages 31–35 set commencement and definitions. Pages 35–36, Part A, cover scope, non-discriminatory connectivity on a first-come-first-serve basis, interconnection standards, and distribution-transformer-level capacity limits with a proviso allowing higher connectivity after a load study. Part B, pp36–42, sets technical arrangements: eligible consumer and project capacity limits relative to sanctioned load or contract demand, HT consumer connection options, interconnection and safety standards, islanding and anti-islanding protection, harmonic limits, and prior-intimation requirements for systems behind the consumer meter that do not opt for net metering or billing. It also covers metering infrastructure, application and registration procedure, approval validity, and model connection agreements.
Part C, pp42–47, is the commercial core. It specifies net-metering energy accounting and settlement: meter reading, bill disclosures, carry-forward of excess export, annual purchase of unadjusted credits at generic tariff, ToD treatment, grid support charges, treatment when a consumer leaves or changes licensee, and dispute redressal. It then specifies net-billing accounting, the PPA with the distribution licensee at APPC, the billing equation and its components, and defective-meter accounting. It also allocates RPO treatment and excludes these systems from REC issuance.
Part D, p47, contains power to relax, issue practice directions, amend, remove difficulties, and repeal the 2015 rooftop solar net-metering regulations with savings for existing agreements. Annexures 1–6, pp48–62, provide the application procedure, model application form and checklist, model net metering and net billing connection agreements, prior-intimation form, and the distribution-transformer-wise capacity reporting format to be updated quarterly.
Read with this
The regulation
Amendments and corrections
Commencement notices and reasons
- Dated 30 Dec 2019Grid Interactive Rooftop RE Regulations, 2019 — Statement of Reasons
- Dated 16 Nov 2023Grid Interactive Rooftop Renewable Energy Generating Systems (First Amendment) Regulations, 2023 — Statement of Reasons
- Dated 29 Aug 2024Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — Second Amendment, 2024 — Statement of Reasons
Procedures and orders made under it
Proposed changes (drafts with no final yet)
- Released with the notice dated 5 Aug 2023Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — First Amendment, 2023 — Draft
- Dated 5 Aug 2023Public notice: Public Notice — Comments on Draft Open Access, Rooftop Renewable and RPO/REC Amendment Regulations, 2023
- Released with the notice dated 5 Aug 2023Explanatory memorandum: Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — First Amendment, 2023 — Explanatory Memorandum — Draft
- Dated 24 Aug 2023Notice extending the date for comments: Public Notice — Extension of time for comments on Draft Regulations, August 2023
Earlier drafts
- Released with the notice dated 23 May 2024Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — Second Amendment, 2024 — Draft
- Released with the notice dated 23 May 2024Explanatory memorandum: Grid Interactive Rooftop Renewable Energy Generating Systems, 2019 — Second Amendment, 2024 — Explanatory Memorandum
- Dated 23 May 2024Public notice: Public Notice Inviting Comments on Draft Supply Code and Rooftop Renewable Energy Amendment Regulations, 2024
10 more documents belong here and are not on Voltaic: 5 drafts or notices on a draft not held as English text, 4 drafts or notices on a draft and 1 copy in another language.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.