MERC · Maharashtra Electricity Regulatory Commission
Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — Second Amendment, 2024 — Draft
Maharashtra Electricity Regulatory Commission (Grid Interactive Rooftop Renewable Energy Generating Systems) (Second Amendment) Regulations, 2024
Draft amendmentReleased with the notice dated 23 May 2024MERC/Tech/Regulation/___. dated ___May 2024
Draft
A proposal that has since been finalised as the Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — Second Amendment, 2024.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a draft MERC notification proposing the Second Amendment to the Commission's 2019 Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, as already amended once in 2023. It is issued for previous publication, with the notification number and the day of the date left blank ('_May 2024'), and the amendments are to take effect from publication in the Official Gazette (p1, p5).
The centrepiece is a Virtual Net Metering (VNM) framework for residential consumers. Section 2 inserts new provisos into Regulation 2.1(j) letting a residential consumer site a system anywhere within the same distribution licensee's area of supply, and letting several residential consumers — including a housing society's common connection — pool into one common system, with total capacity capped at the sum of the capacity each participant is eligible for; it also adds a definition of VNM (p1–2). Section 3 sends grid connectivity and scheduling of VNM systems to the Commission's other regulations (p2).
Sections 4 and 6 are process amendments: an additional check meter for gross-metered and VNM systems, installed by the distribution licensee (Reg 8.11); a defect-rectification notice to be served before an application is rejected, with applications considered in seniority order (Reg 9.7); licensee-executed distribution infrastructure upgrades within Supply Code timelines, with the cost of strengthening carried in the licensee's annual revenue requirement (Reg 9.7(a)); a deemed-feasibility outcome if the technical study is not completed in time and deemed acceptance of complete applications up to 10 kW (Annexure-1, Clause C); and publication of model net metering / net billing / gross metering connection agreements on the licensee's web portal (p2–4).
Sections 5 and 7 carry the settlement mechanics, in near-identical form in Part C (Reg 11.10) and Annexure-3 (new Clause 8.7): bill credits in the agreed procurement ratio, a once-a-financial-year option to change that ratio on two months' notice, time-block matching with surplus treated as off-peak or normal block, carry-forward of surplus as energy credits, year-end treatment through Clause 11.4(c), and exemption from open access charges and losses until installed rooftop solar capacity in Maharashtra reaches 5000 MW (p3–5).
Read with this
The regulation
Amendments and corrections
Commencement notices and reasons
- Dated 30 Dec 2019Grid Interactive Rooftop RE Regulations, 2019 — Statement of Reasons
- Dated 16 Nov 2023Grid Interactive Rooftop Renewable Energy Generating Systems (First Amendment) Regulations, 2023 — Statement of Reasons
- Dated 29 Aug 2024Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — Second Amendment, 2024 — Statement of Reasons
Procedures and orders made under it
Other copies of these documents (1)
Proposed changes (drafts with no final yet)
- Released with the notice dated 5 Aug 2023Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — First Amendment, 2023 — Draft
- Dated 5 Aug 2023Public notice: Public Notice — Comments on Draft Open Access, Rooftop Renewable and RPO/REC Amendment Regulations, 2023
- Released with the notice dated 5 Aug 2023Explanatory memorandum: Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — First Amendment, 2023 — Explanatory Memorandum — Draft
- Dated 24 Aug 2023Notice extending the date for comments: Public Notice — Extension of time for comments on Draft Regulations, August 2023
Earlier drafts
- Released with the notice dated 23 May 2024Explanatory memorandum: Grid Interactive Rooftop Renewable Energy Generating Systems, 2019 — Second Amendment, 2024 — Explanatory Memorandum
- Dated 23 May 2024Public notice: Public Notice Inviting Comments on Draft Supply Code and Rooftop Renewable Energy Amendment Regulations, 2024
10 more documents belong here and are not on Voltaic: 5 drafts or notices on a draft not held as English text, 4 drafts or notices on a draft and 1 copy in another language.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.