MERC · Maharashtra Electricity Regulatory Commission

Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — Second Amendment, 2024 — Draft

Maharashtra Electricity Regulatory Commission (Grid Interactive Rooftop Renewable Energy Generating Systems) (Second Amendment) Regulations, 2024

Draft amendmentReleased with the notice dated 23 May 2024MERC/Tech/Regulation/___. dated ___May 2024

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a draft MERC notification proposing the Second Amendment to the Commission's 2019 Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, as already amended once in 2023. It is issued for previous publication, with the notification number and the day of the date left blank ('_May 2024'), and the amendments are to take effect from publication in the Official Gazette (p1, p5).

The centrepiece is a Virtual Net Metering (VNM) framework for residential consumers. Section 2 inserts new provisos into Regulation 2.1(j) letting a residential consumer site a system anywhere within the same distribution licensee's area of supply, and letting several residential consumers — including a housing society's common connection — pool into one common system, with total capacity capped at the sum of the capacity each participant is eligible for; it also adds a definition of VNM (p1–2). Section 3 sends grid connectivity and scheduling of VNM systems to the Commission's other regulations (p2).

Sections 4 and 6 are process amendments: an additional check meter for gross-metered and VNM systems, installed by the distribution licensee (Reg 8.11); a defect-rectification notice to be served before an application is rejected, with applications considered in seniority order (Reg 9.7); licensee-executed distribution infrastructure upgrades within Supply Code timelines, with the cost of strengthening carried in the licensee's annual revenue requirement (Reg 9.7(a)); a deemed-feasibility outcome if the technical study is not completed in time and deemed acceptance of complete applications up to 10 kW (Annexure-1, Clause C); and publication of model net metering / net billing / gross metering connection agreements on the licensee's web portal (p2–4).

Sections 5 and 7 carry the settlement mechanics, in near-identical form in Part C (Reg 11.10) and Annexure-3 (new Clause 8.7): bill credits in the agreed procurement ratio, a once-a-financial-year option to change that ratio on two months' notice, time-block matching with surplus treated as off-peak or normal block, carry-forward of surplus as energy credits, year-end treatment through Clause 11.4(c), and exemption from open access charges and losses until installed rooftop solar capacity in Maharashtra reaches 5000 MW (p3–5).

Standard name
Net Metering and Rooftop Solar
Primary topics
Net metering, Billing and payment, New connections and load changes

Read with this

Other copies of these documents (1)

10 more documents belong here and are not on Voltaic: 5 drafts or notices on a draft not held as English text, 4 drafts or notices on a draft and 1 copy in another language.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document