MERC · Maharashtra Electricity Regulatory Commission

Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — First Amendment, 2023

Maharashtra Electricity Regulatory Commission (Grid Interactive Rooftop Renewable Energy Generating Systems) (First Amendment) Regulations, 2023

AmendmentDate not statedMERC/Tech/Regulation/___.— dated November, 2023

Amends the Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The document is the First Amendment by the Maharashtra Electricity Regulatory Commission to its 2019 Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, notified under the Electricity Act, 2003 and the Tariff Policy, 2016 (p13). It comes into force from publication in the Official Gazette; the Gazette date is not printed (p13). It responds to the Electricity (Rights of Consumers) Rules, 2020 and Amendment Rules, 2021 (p13).

The amendment expands the regulatory menu beyond net metering. It replaces and inserts definitions of Eligible Consumer, Gross Metering, Gross Metering Connection Agreement, Group Net Metering, Net Billing Arrangement and Prosumer, and caps net metering eligibility at 5 MW or Contract Demand/Sanction Load, whichever is lower, with other arrangements capped at Contract Demand/Sanctioned Load (p13–14). It adds gross metering and behind-the-meter systems to the arrangements covered by Regulations 3 and 4, and confirms that a prosumer keeps consumer status and rights (p14).

Technical and commercial parts are amended: Regulation 8 metering provisions add gross-metering check meters; Regulation 9 requires the application procedure in Annexure-1 and imposes per-day compensation on the distribution licensee for delay; Regulation 10 adds a model gross metering connection agreement and allows early termination to switch to group net metering (p15). Commercial amendments deal with accumulating credit payouts and interest, a Grid Support Charge exemption until rooftop installations reach 5000 MW, group net metering accounting and settlement with priority lists and ToD treatment, a new net billing framework with a billing equation, and gross metering sale of entire generation to the licensee (p15–17). RPO treatment is substituted for net metering/net billing/behind-the-meter and gross metering (p17–18).

Annexures are substituted or added: Annexure-1 agreement requirement, Annexure-2 model application form covering all three arrangements, Annexure-3 group net metering energy offset, Annexure-4 billing/metering and cost provisions, and new Annexure-7 model Gross Metering Connection Agreement with technical, safety, term, liability, commercial settlement and dispute terms (p18–23).

Standard name
Net Metering and Rooftop Solar
Primary topics
Net metering, Gross metering, Net billing

Read with this

Other copies of these documents (1)

10 more documents belong here and are not on Voltaic: 5 drafts or notices on a draft not held as English text, 4 drafts or notices on a draft and 1 copy in another language.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.