Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — First Amendment, 2023
Maharashtra Electricity Regulatory Commission (Grid Interactive Rooftop Renewable Energy Generating Systems) (First Amendment) Regulations, 2023
AmendmentDate not statedMERC/Tech/Regulation/___.— dated November, 2023
Amends the Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The document is the First Amendment by the Maharashtra Electricity Regulatory Commission to its 2019 Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, notified under the Electricity Act, 2003 and the Tariff Policy, 2016 (p13). It comes into force from publication in the Official Gazette; the Gazette date is not printed (p13). It responds to the Electricity (Rights of Consumers) Rules, 2020 and Amendment Rules, 2021 (p13).
The amendment expands the regulatory menu beyond net metering. It replaces and inserts definitions of Eligible Consumer, Gross Metering, Gross Metering Connection Agreement, Group Net Metering, Net Billing Arrangement and Prosumer, and caps net metering eligibility at 5 MW or Contract Demand/Sanction Load, whichever is lower, with other arrangements capped at Contract Demand/Sanctioned Load (p13–14). It adds gross metering and behind-the-meter systems to the arrangements covered by Regulations 3 and 4, and confirms that a prosumer keeps consumer status and rights (p14).
Technical and commercial parts are amended: Regulation 8 metering provisions add gross-metering check meters; Regulation 9 requires the application procedure in Annexure-1 and imposes per-day compensation on the distribution licensee for delay; Regulation 10 adds a model gross metering connection agreement and allows early termination to switch to group net metering (p15). Commercial amendments deal with accumulating credit payouts and interest, a Grid Support Charge exemption until rooftop installations reach 5000 MW, group net metering accounting and settlement with priority lists and ToD treatment, a new net billing framework with a billing equation, and gross metering sale of entire generation to the licensee (p15–17). RPO treatment is substituted for net metering/net billing/behind-the-meter and gross metering (p17–18).
Annexures are substituted or added: Annexure-1 agreement requirement, Annexure-2 model application form covering all three arrangements, Annexure-3 group net metering energy offset, Annexure-4 billing/metering and cost provisions, and new Annexure-7 model Gross Metering Connection Agreement with technical, safety, term, liability, commercial settlement and dispute terms (p18–23).
Read with this
The regulation
Amendments and corrections
Commencement notices and reasons
- Dated 30 Dec 2019Grid Interactive Rooftop RE Regulations, 2019 — Statement of Reasons
- Dated 16 Nov 2023Grid Interactive Rooftop Renewable Energy Generating Systems (First Amendment) Regulations, 2023 — Statement of Reasons
- Dated 29 Aug 2024Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — Second Amendment, 2024 — Statement of Reasons
Procedures and orders made under it
Other copies of these documents (1)
Proposed changes (drafts with no final yet)
- Released with the notice dated 5 Aug 2023Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — First Amendment, 2023 — Draft
- Dated 5 Aug 2023Public notice: Public Notice — Comments on Draft Open Access, Rooftop Renewable and RPO/REC Amendment Regulations, 2023
- Released with the notice dated 5 Aug 2023Explanatory memorandum: Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — First Amendment, 2023 — Explanatory Memorandum — Draft
- Dated 24 Aug 2023Notice extending the date for comments: Public Notice — Extension of time for comments on Draft Regulations, August 2023
Earlier drafts
- Released with the notice dated 23 May 2024Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — Second Amendment, 2024 — Draft
- Released with the notice dated 23 May 2024Explanatory memorandum: Grid Interactive Rooftop Renewable Energy Generating Systems, 2019 — Second Amendment, 2024 — Explanatory Memorandum
- Dated 23 May 2024Public notice: Public Notice Inviting Comments on Draft Supply Code and Rooftop Renewable Energy Amendment Regulations, 2024
10 more documents belong here and are not on Voltaic: 5 drafts or notices on a draft not held as English text, 4 drafts or notices on a draft and 1 copy in another language.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.