Grid Interactive Rooftop RE Regulations, 2019 — Statement of Reasons

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (GRID INTERACTIVE ROOFTOP RENEWABLE ENERGY GENERATING SYSTEMS) REGULATIONS, 2019 — STATEMENT OF REASONS

Statement of reasonsDated 30 Dec 2019

The commission's reasons for the Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software, from pages 1 to 28 of 68. Check the regulator's original before you rely on it.

This is MERC's Statement of Reasons (SoR) for the MERC (Grid Interactive Rooftop Renewable Energy Generating Systems) Regulations, 2019, dated 30 December 2019 (p1). It is organised clause by clause: for each clause it reproduces the text proposed in the October 2019 draft, summarises what stakeholders said, and records the Commission's analysis and decision, often quoting the clause as finally modified (p3).

The introduction (pp1–3) sets out the lineage — the 2015 Net Metering Regulations, their July 2017 first amendment extending scope to all grid-connected RE systems, and the FOR Model Regulations 2019 — and the consultation: draft plus Explanatory Memorandum published on the website on 26 October 2019, newspaper notices in Marathi and English, a comment deadline of 18 November 2019 extended to 25 November 2019, and roughly 3,800 responses. Commenters are listed at Annexure-I (p2). The SoR retains the draft's regulation numbering and notes suo-motu consequential changes (p3).

Clauses 1.1 and 1.7 (pp3–5, 10–12) settle commencement and scope: prospective effect, applying to installations whose applications are received on or after notification, with pending applications and systems commissioned under the 2015 Regulations continuing under those Regulations; capacity enhancement pulls the whole installation into the new regime.

Clauses 1.2–1.6 (pp5–10) work through definitions — Eligible Consumer, Generic Tariff, the newly added APPC, Inter-connection Point, Renewable Energy Generating System (now "with or without energy storage") and RE Generation Meter — and the Commission's rulings on ownership versus third-party leasing, the 1 MW net-metering cap, the meaning of "premises", HT-side metering, and hybrid systems.

Clause 1.8 (pp12–25) is the substantive heart. It records near-unanimous stakeholder opposition to confining Net Metering to residential consumers, and the Commission's reversal: Net Metering for all eligible categories up to 1 MW without a consumption limit, with Net Billing available to all categories as the consumer's choice. To address the resulting cost-shifting it introduces Grid Support Charges on gross generation under Net Metering, to be determined category-wise through tariff orders on the licensee's proposal, exempting consumers with sanctioned load up to 10 kW (pp23–25). Regulations 11 and 12 are rewritten for energy accounting — carry-forward of credited units, year-end purchase of unadjusted units at generic tariff, ToD treatment of injections — and Net Billing purchases are moved to APPC.

Clauses 1.9–1.11 (pp25–28) cover capacity limits: the cumulative rooftop capacity on a distribution transformer is raised from 40% to 70% of rated capacity, not applying to behind-the-meter systems; individual system capacity stays capped at sanctioned load/contract demand; and DT-rating constraints with a permitted capacity variation are retained.

Standard name
Net Metering and Rooftop Solar
Primary topics
Net metering, Net billing, Energy banking

Read with this

Other copies of these documents (1)

10 more documents belong here and are not on Voltaic: 5 drafts or notices on a draft not held as English text, 4 drafts or notices on a draft and 1 copy in another language.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗