MERC · Maharashtra Electricity Regulatory Commission
Public Notice — Extension of time for comments on Draft Regulations, August 2023
Extension of time for comments on Draft Regulations
Notice extending the date for comments on a draftDated 24 Aug 2023
Draft
Voltaic holds no final regulation made from this draft.
Notice extending the date for comments on the Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — First Amendment, 2023 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a single-page public notice from the Maharashtra Electricity Regulatory Commission (MERC), signed by its Secretary at Mumbai on 24 August 2023 (p1). It concerns the consultation already opened by an earlier Public Notice dated 5 August 2023 on three draft amendment regulations: the Draft MERC (Distribution Open Access) (Second Amendment) Regulations, 2023; the Draft MERC (Grid Interactive Rooftop Renewable Energy Generating Systems) (First Amendment) Regulations, 2023; and the Draft MERC (RPO, its Compliance and implementation of REC framework) (First Amendment) Regulations, 2023 (p1).
The original notice set 25 August 2023 as the last date for written comments, suggestions and/or objections. Acknowledging requests from various stakeholders, the Commission extends that date up to 4 September 2023 (p1).
The notice also states that all future communication on the issue will be through the MERC website only (p1). It sets no substantive regulatory content: nothing in the three draft amendments is restated, modified or adopted here, and the drafts themselves are not annexed. Its only operative effect is to move the comment deadline and fix the channel for further communication.
Read with this
The regulation
Amendments and corrections
Commencement notices and reasons
- Dated 30 Dec 2019Grid Interactive Rooftop RE Regulations, 2019 — Statement of Reasons
- Dated 16 Nov 2023Grid Interactive Rooftop Renewable Energy Generating Systems (First Amendment) Regulations, 2023 — Statement of Reasons
- Dated 29 Aug 2024Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — Second Amendment, 2024 — Statement of Reasons
Procedures and orders made under it
Other copies of these documents (1)
Proposed changes (drafts with no final yet)
- Released with the notice dated 5 Aug 2023Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — First Amendment, 2023 — Draft
- Dated 5 Aug 2023Public notice: Public Notice — Comments on Draft Open Access, Rooftop Renewable and RPO/REC Amendment Regulations, 2023
- Released with the notice dated 5 Aug 2023Explanatory memorandum: Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — First Amendment, 2023 — Explanatory Memorandum — Draft
Earlier drafts
- Released with the notice dated 23 May 2024Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — Second Amendment, 2024 — Draft
- Released with the notice dated 23 May 2024Explanatory memorandum: Grid Interactive Rooftop Renewable Energy Generating Systems, 2019 — Second Amendment, 2024 — Explanatory Memorandum
- Dated 23 May 2024Public notice: Public Notice Inviting Comments on Draft Supply Code and Rooftop Renewable Energy Amendment Regulations, 2024
10 more documents belong here and are not on Voltaic: 5 drafts or notices on a draft not held as English text, 4 drafts or notices on a draft and 1 copy in another language.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.