MERC · Maharashtra Electricity Regulatory Commission
Public Notice — Comments on Draft Open Access, Rooftop Renewable and RPO/REC Amendment Regulations, 2023
Inviting comments, suggestions and /or objections on Draft Regulations
Public notice on a draftDated 5 Aug 2023Advt No. 27/2023-24 dated 05/08/2023
Draft
Voltaic holds no final regulation made from this draft.
Public notice on the Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — First Amendment, 2023 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is MERC's public notice dated 5 August 2023, issued as Advt No. 27/2023-24, inviting comments on three draft amendment regulations: the Distribution Open Access (Second Amendment), the Grid Interactive Rooftop Renewable Energy Generating Systems (First Amendment), and the RPO/REC framework (First Amendment) (p1). MERC says it is aligning its regulations with MoP Rules under the Electricity Act 2003 for promoting green energy. The drafts and explanatory memorandum are on MERC's website.
Stakeholders may upload comments through the E-Public Consultation tab within 21 days, or file hard copies with the Secretary before 5 PM on 25 August 2023. Only these modes are accepted; comments received by the deadline will be considered before finalisation. Future updates will be on the website only. The Marathi version appears on p2.
Read with this
The regulation
Amendments and corrections
Commencement notices and reasons
- Dated 30 Dec 2019Grid Interactive Rooftop RE Regulations, 2019 — Statement of Reasons
- Dated 16 Nov 2023Grid Interactive Rooftop Renewable Energy Generating Systems (First Amendment) Regulations, 2023 — Statement of Reasons
- Dated 29 Aug 2024Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — Second Amendment, 2024 — Statement of Reasons
Procedures and orders made under it
Other copies of these documents (1)
Proposed changes (drafts with no final yet)
- Released with the notice dated 5 Aug 2023Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — First Amendment, 2023 — Draft
- Released with the notice dated 5 Aug 2023Explanatory memorandum: Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — First Amendment, 2023 — Explanatory Memorandum — Draft
- Dated 24 Aug 2023Notice extending the date for comments: Public Notice — Extension of time for comments on Draft Regulations, August 2023
Earlier drafts
- Released with the notice dated 23 May 2024Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — Second Amendment, 2024 — Draft
- Released with the notice dated 23 May 2024Explanatory memorandum: Grid Interactive Rooftop Renewable Energy Generating Systems, 2019 — Second Amendment, 2024 — Explanatory Memorandum
- Dated 23 May 2024Public notice: Public Notice Inviting Comments on Draft Supply Code and Rooftop Renewable Energy Amendment Regulations, 2024
10 more documents belong here and are not on Voltaic: 5 drafts or notices on a draft not held as English text, 4 drafts or notices on a draft and 1 copy in another language.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.