Skip to content

MERC · Maharashtra Electricity Regulatory Commission

Public Notice Inviting Comments on Draft Supply Code and Rooftop Renewable Energy Amendment Regulations, 2024

INVITING COMMENTS, SUGGESTIONS AND /OR OBJECTIONS ON DRAFT REGULATIONS

Public notice on a draftDated 23 May 2024Advt No. 35/2024-25 dated 23/05/2024

Public notice on the Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — Second Amendment, 2024 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a one-page public notice from the Maharashtra Electricity Regulatory Commission inviting stakeholder comments on two draft amendment regulations (p1). The drafts named are the Draft MERC (Electricity Supply Code and Standards of Performance of Distribution Licensees including Power Quality) (First Amendment) Regulations, 2024, and the Draft MERC (Grid Interactive Rooftop Renewable Energy Generating Systems) (Second Amendment) Regulations, 2024 (p1).

The notice does not reproduce either draft; it says both drafts, with their explanatory memoranda, are available for download on the Commission's website, and directs respondents to the 'E-Public Consultation' tab for online submissions within 21 days (p1). It gives contact details for access problems, and an alternative for those without electronic access: hard-copy submissions to the Secretary, MERC, Mumbai, before 5 PM on 14 June 2024 (p1).

It states that only comments uploaded or received on or before 14 June 2024 will be considered before the drafts are finalised, that submissions through any other mode will not be considered, and that all future communication will be through the MERC website (p1). The notice is dated 23/05/2024 and signed by the Secretary, MERC (p1).

Standard name
Electricity Supply Code, Standards of Performance, Net Metering and Rooftop Solar

Read with this

Other copies of these documents (1)

10 more documents belong here and are not on Voltaic: 5 drafts or notices on a draft not held as English text, 4 drafts or notices on a draft and 1 copy in another language.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document