MERC · Maharashtra Electricity Regulatory Commission
Public Notice Inviting Comments on Draft Supply Code and Rooftop Renewable Energy Amendment Regulations, 2024
INVITING COMMENTS, SUGGESTIONS AND /OR OBJECTIONS ON DRAFT REGULATIONS
Public notice on a draftDated 23 May 2024Advt No. 35/2024-25 dated 23/05/2024
Draft
The draft has since been finalised as the Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — Second Amendment, 2024.
Public notice on the Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — Second Amendment, 2024 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a one-page public notice from the Maharashtra Electricity Regulatory Commission inviting stakeholder comments on two draft amendment regulations (p1). The drafts named are the Draft MERC (Electricity Supply Code and Standards of Performance of Distribution Licensees including Power Quality) (First Amendment) Regulations, 2024, and the Draft MERC (Grid Interactive Rooftop Renewable Energy Generating Systems) (Second Amendment) Regulations, 2024 (p1).
The notice does not reproduce either draft; it says both drafts, with their explanatory memoranda, are available for download on the Commission's website, and directs respondents to the 'E-Public Consultation' tab for online submissions within 21 days (p1). It gives contact details for access problems, and an alternative for those without electronic access: hard-copy submissions to the Secretary, MERC, Mumbai, before 5 PM on 14 June 2024 (p1).
It states that only comments uploaded or received on or before 14 June 2024 will be considered before the drafts are finalised, that submissions through any other mode will not be considered, and that all future communication will be through the MERC website (p1). The notice is dated 23/05/2024 and signed by the Secretary, MERC (p1).
Read with this
The regulation
Amendments and corrections
Commencement notices and reasons
- Dated 30 Dec 2019Grid Interactive Rooftop RE Regulations, 2019 — Statement of Reasons
- Dated 16 Nov 2023Grid Interactive Rooftop Renewable Energy Generating Systems (First Amendment) Regulations, 2023 — Statement of Reasons
- Dated 29 Aug 2024Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — Second Amendment, 2024 — Statement of Reasons
Procedures and orders made under it
Other copies of these documents (1)
Proposed changes (drafts with no final yet)
- Released with the notice dated 5 Aug 2023Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — First Amendment, 2023 — Draft
- Dated 5 Aug 2023Public notice: Public Notice — Comments on Draft Open Access, Rooftop Renewable and RPO/REC Amendment Regulations, 2023
- Released with the notice dated 5 Aug 2023Explanatory memorandum: Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — First Amendment, 2023 — Explanatory Memorandum — Draft
- Dated 24 Aug 2023Notice extending the date for comments: Public Notice — Extension of time for comments on Draft Regulations, August 2023
Earlier drafts
- Released with the notice dated 23 May 2024Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — Second Amendment, 2024 — Draft
- Released with the notice dated 23 May 2024Explanatory memorandum: Grid Interactive Rooftop Renewable Energy Generating Systems, 2019 — Second Amendment, 2024 — Explanatory Memorandum
10 more documents belong here and are not on Voltaic: 5 drafts or notices on a draft not held as English text, 4 drafts or notices on a draft and 1 copy in another language.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.