MERC · Maharashtra Electricity Regulatory Commission
Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — First Amendment, 2023 — Draft
Maharashtra Electricity Regulatory Commission (Grid Interactive Rooftop Renewable Energy Generating Systems) (First Amendment) Regulations, 2023
Draft amendmentReleased with the notice dated 5 Aug 2023
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a draft amending regulation — the First Amendment, 2023 — to MERC's 2019 Grid Interactive Rooftop Renewable Energy Generating Systems Regulations. It is structured as a notification with thirteen amending sections and a new model agreement, and it would take effect from publication in the Official Gazette (p1).
The centre of gravity is the addition of gross metering as a third commercial route alongside net metering and net billing. Section 3 rewrites the Regulation 2 definitions: 'Eligible Consumer' is expanded to cover systems owned or operated by the consumer, the distribution licensee or a third-party lessor, with capacity ceilings tied to contract demand/sanction load — and to 1 MW for net metering, whichever is lower (p1–2). New definitions of 'Gross-Metering', 'Gross Metering Connection Agreement' and 'Prosumer' are inserted, and 'Net Billing Arrangement' is redefined (p2–3). Section 4 brings gross metering and behind-the-meter systems that opt for no arrangement into Regulation 3's scope, and a deeming provision extends references to net metering/net billing in Regulations 4 to 10 to gross metering as well (p3). Section 5 preserves the prosumer's status and rights as an ordinary consumer (p3).
Sections 6 to 8 handle technical arrangements: meter type at the interconnection point, an additional check meter for the renewable energy generation meter under gross metering, the Annexure-1 connectivity procedure with per-day compensation to the consumer for licensee delay, and a model gross metering agreement in a new Annexure-7 (p3–4). Sections 9 and 10 carry the commercial content: a proviso to Regulation 11.4(e) on how a credit balance that keeps growing over three consecutive financial years is paid out, a new Regulation 11(A) setting out net billing energy accounting and settlement (effective date of accounting, meter reading of both meters, mandated bill disclosures, and a billing equation with defined symbols), and a substituted Regulation 12 defining gross metering as sale of the entire generation to the licensee under a power purchase agreement (p4–6).
Sections 11 to 13 make conforming changes to Annexure-1, Annexure-2 and Annexure-4, and Annexure-7 supplies a full twenty-year model Gross Metering Connection Agreement covering eligibility, interconnection, safety, clearances, term and termination, access, liability, commercial settlement, connection costs and dispute resolution (p6–11).
Read with this
The regulation
Amendments and corrections
Commencement notices and reasons
- Dated 30 Dec 2019Grid Interactive Rooftop RE Regulations, 2019 — Statement of Reasons
- Dated 16 Nov 2023Grid Interactive Rooftop Renewable Energy Generating Systems (First Amendment) Regulations, 2023 — Statement of Reasons
- Dated 29 Aug 2024Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — Second Amendment, 2024 — Statement of Reasons
Procedures and orders made under it
Other copies of these documents (1)
Proposed changes (drafts with no final yet)
- Dated 5 Aug 2023Public notice: Public Notice — Comments on Draft Open Access, Rooftop Renewable and RPO/REC Amendment Regulations, 2023
- Released with the notice dated 5 Aug 2023Explanatory memorandum: Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — First Amendment, 2023 — Explanatory Memorandum — Draft
- Dated 24 Aug 2023Notice extending the date for comments: Public Notice — Extension of time for comments on Draft Regulations, August 2023
Earlier drafts
- Released with the notice dated 23 May 2024Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — Second Amendment, 2024 — Draft
- Released with the notice dated 23 May 2024Explanatory memorandum: Grid Interactive Rooftop Renewable Energy Generating Systems, 2019 — Second Amendment, 2024 — Explanatory Memorandum
- Dated 23 May 2024Public notice: Public Notice Inviting Comments on Draft Supply Code and Rooftop Renewable Energy Amendment Regulations, 2024
10 more documents belong here and are not on Voltaic: 5 drafts or notices on a draft not held as English text, 4 drafts or notices on a draft and 1 copy in another language.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.