Skip to content

MERC · Maharashtra Electricity Regulatory Commission

Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — First Amendment, 2023 — Draft

Maharashtra Electricity Regulatory Commission (Grid Interactive Rooftop Renewable Energy Generating Systems) (First Amendment) Regulations, 2023

Draft amendmentReleased with the notice dated 5 Aug 2023

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a draft amending regulation — the First Amendment, 2023 — to MERC's 2019 Grid Interactive Rooftop Renewable Energy Generating Systems Regulations. It is structured as a notification with thirteen amending sections and a new model agreement, and it would take effect from publication in the Official Gazette (p1).

The centre of gravity is the addition of gross metering as a third commercial route alongside net metering and net billing. Section 3 rewrites the Regulation 2 definitions: 'Eligible Consumer' is expanded to cover systems owned or operated by the consumer, the distribution licensee or a third-party lessor, with capacity ceilings tied to contract demand/sanction load — and to 1 MW for net metering, whichever is lower (p1–2). New definitions of 'Gross-Metering', 'Gross Metering Connection Agreement' and 'Prosumer' are inserted, and 'Net Billing Arrangement' is redefined (p2–3). Section 4 brings gross metering and behind-the-meter systems that opt for no arrangement into Regulation 3's scope, and a deeming provision extends references to net metering/net billing in Regulations 4 to 10 to gross metering as well (p3). Section 5 preserves the prosumer's status and rights as an ordinary consumer (p3).

Sections 6 to 8 handle technical arrangements: meter type at the interconnection point, an additional check meter for the renewable energy generation meter under gross metering, the Annexure-1 connectivity procedure with per-day compensation to the consumer for licensee delay, and a model gross metering agreement in a new Annexure-7 (p3–4). Sections 9 and 10 carry the commercial content: a proviso to Regulation 11.4(e) on how a credit balance that keeps growing over three consecutive financial years is paid out, a new Regulation 11(A) setting out net billing energy accounting and settlement (effective date of accounting, meter reading of both meters, mandated bill disclosures, and a billing equation with defined symbols), and a substituted Regulation 12 defining gross metering as sale of the entire generation to the licensee under a power purchase agreement (p4–6).

Sections 11 to 13 make conforming changes to Annexure-1, Annexure-2 and Annexure-4, and Annexure-7 supplies a full twenty-year model Gross Metering Connection Agreement covering eligibility, interconnection, safety, clearances, term and termination, access, liability, commercial settlement, connection costs and dispute resolution (p6–11).

Standard name
Net Metering and Rooftop Solar
Primary topics
Gross metering, Net metering, Net billing

Read with this

Other copies of these documents (1)

Proposed changes (drafts with no final yet)

10 more documents belong here and are not on Voltaic: 5 drafts or notices on a draft not held as English text, 4 drafts or notices on a draft and 1 copy in another language.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document