OrderDated 30 Jun 2026
Made under the Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a two-page MERC Practice Direction that removes the need for a separate physical net metering agreement for rooftop renewable energy generating systems in Maharashtra, replacing it with digital acceptance of agreement terms (p1–2).
The Background section records that MSEDCL wrote on 22 June 2026 asking the Commission to waive separate physical Net Metering Agreements for PM Surya Ghar: Muft Bijli Yojana (PMSGY) domestic consumers and to recognise the National Portal's digital agreement as legally enforceable, and clarified by email on 23 June 2026 that the waiver should extend to all rooftop solar applications, PMSGY and non-PMSGY (p1). The Commission notes that the 2019 Regulations currently require a distribution licensee and eligible consumer to execute an agreement after connectivity approval and before generation, and prescribe model agreements for various arrangements (p1). It also notes that the 2021 Supply Code Regulations already dropped a separate agreement for new connections, but the rooftop requirement remains (p1–2). It relies on a Ministry of Power letter dated 27 August 2025 advising states to dispense with separate net metering agreements and adopt a digital agreement in the online application, extended by the same approach to non-PMSGY applications (p2).
Operatively, the direction binds all distribution licensees in Maharashtra: for PMSGY portal applications the portal's digital agreement is deemed to satisfy the 2019 Regulations and no separate physical agreement may be insisted upon; for non-PMSGY applications the licensee must embed the applicable model agreement terms in the online application form, and the consumer's online acceptance is deemed to constitute execution (p2). It takes effect from the date of issue (p2).
Read with this
The regulation
Amendments and corrections
Commencement notices and reasons
- Dated 30 Dec 2019Grid Interactive Rooftop RE Regulations, 2019 — Statement of Reasons
- Dated 16 Nov 2023Grid Interactive Rooftop Renewable Energy Generating Systems (First Amendment) Regulations, 2023 — Statement of Reasons
- Dated 29 Aug 2024Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — Second Amendment, 2024 — Statement of Reasons
Other copies of these documents (1)
Proposed changes (drafts with no final yet)
- Released with the notice dated 5 Aug 2023Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — First Amendment, 2023 — Draft
- Dated 5 Aug 2023Public notice: Public Notice — Comments on Draft Open Access, Rooftop Renewable and RPO/REC Amendment Regulations, 2023
- Released with the notice dated 5 Aug 2023Explanatory memorandum: Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — First Amendment, 2023 — Explanatory Memorandum — Draft
- Dated 24 Aug 2023Notice extending the date for comments: Public Notice — Extension of time for comments on Draft Regulations, August 2023
Earlier drafts
- Released with the notice dated 23 May 2024Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — Second Amendment, 2024 — Draft
- Released with the notice dated 23 May 2024Explanatory memorandum: Grid Interactive Rooftop Renewable Energy Generating Systems, 2019 — Second Amendment, 2024 — Explanatory Memorandum
- Dated 23 May 2024Public notice: Public Notice Inviting Comments on Draft Supply Code and Rooftop Renewable Energy Amendment Regulations, 2024
10 more documents belong here and are not on Voltaic: 5 drafts or notices on a draft not held as English text, 4 drafts or notices on a draft and 1 copy in another language.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.