MERC · Maharashtra Electricity Regulatory Commission
Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — Second Amendment, 2024 — Statement of Reasons
MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (GRID INTERACTIVE ROOFTOP RENEWABLE ENERGY GENERATING SYSTEMS) (SECOND AMENDMENT) REGULATIONS, 2024
Statement of reasonsDated 29 Aug 2024
The commission's reasons for the Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 or one of its amendments.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is MERC's Statement of Reasons (SOR) for the Maharashtra Electricity Regulatory Commission (Grid Interactive Rooftop Renewable Energy Generating Systems) (Second Amendment) Regulations, 2024, dated 29 August 2024 (p1). It is the consultation record behind the amendment, not the amendment itself: the draft and its Explanatory Memorandum went up on the Commission's website on 23 May 2024, nine stakeholders commented by 14 June 2024 (p2, p21), and the SOR sets out each comment and the Commission's ruling, quoting the final clause wording that underlies the notified Regulations (p1).
Chapter 1 is the substantive core — enabling Virtual Net Metering. It explains the new fourth and fifth provisos to Regulation 2.1(j), which let a residential consumer in a multi-storied building site a generating system anywhere in the same distribution licensee's area, and let multiple such consumers in one housing society or apartment owners' association, with their common connection, set up a system at a common place (pp3–5). It gives the revised definition at Regulation 2.1(z)(a), extended by a proviso for society-level grid-connected micro-grids with or without storage (p8); Regulation 4.4 on grid connectivity and scheduling "if applicable" (p9); Regulation 11.10 on energy accounting and settlement, carry-forward, ratio changes and exemption of open access charges and losses until rooftop solar in Maharashtra reaches 5000 MW (pp9–10); Regulation 11.11 for consumers outside ToD tariff (p12); the new "Lead Person" definition and Regulation 4.5 on that person's duties (p12); and clause 8.7 of Annexure-3 restating settlement mechanics and confirming the exemption lasts the validity of agreements signed before the threshold (pp12–14).
Chapter 2 transposes the MoP Electricity (Rights of Consumers) Amendment Rules, 2024: Regulation 9.7(a) puts cost of strengthening distribution infrastructure into the licensee's ARR (p15), and clause C of Annexure-1 sets the technical feasibility study timeline with deemed acceptance for small systems (p16).
Chapter 3 disposes of residual points: Marathi publication, applicability from Gazette notification, RPO compliance under Regulation 14 of the Principal Regulations, deferral of peer-to-peer trading to a separate regulatory process, and overlapping distribution licensee areas (pp18–20).
Read with this
The regulation
Amendments and corrections
Commencement notices and reasons
Procedures and orders made under it
Other copies of these documents (1)
Proposed changes (drafts with no final yet)
- Released with the notice dated 5 Aug 2023Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — First Amendment, 2023 — Draft
- Dated 5 Aug 2023Public notice: Public Notice — Comments on Draft Open Access, Rooftop Renewable and RPO/REC Amendment Regulations, 2023
- Released with the notice dated 5 Aug 2023Explanatory memorandum: Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — First Amendment, 2023 — Explanatory Memorandum — Draft
- Dated 24 Aug 2023Notice extending the date for comments: Public Notice — Extension of time for comments on Draft Regulations, August 2023
Earlier drafts
- Released with the notice dated 23 May 2024Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — Second Amendment, 2024 — Draft
- Released with the notice dated 23 May 2024Explanatory memorandum: Grid Interactive Rooftop Renewable Energy Generating Systems, 2019 — Second Amendment, 2024 — Explanatory Memorandum
- Dated 23 May 2024Public notice: Public Notice Inviting Comments on Draft Supply Code and Rooftop Renewable Energy Amendment Regulations, 2024
10 more documents belong here and are not on Voltaic: 5 drafts or notices on a draft not held as English text, 4 drafts or notices on a draft and 1 copy in another language.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.