MERC · Maharashtra Electricity Regulatory Commission

Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — Second Amendment, 2024

Maharashtra Electricity Regulatory Commission (Grid Interactive Rooftop Renewable Energy Generating Systems) (Second Amendment) Regulations, 2024

AmendmentDated 29 Aug 2024No. MERC/Tech/Regulation/0537 dated 29th August 2024

Amends the Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Second Amendment to MERC's 2019 Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, issued as Notification No. MERC/Tech/Regulation/0537 and dated 29 August 2024 (p6, p9). It amends the Principal Regulations, which the text defines as the 2019 Regulations read with the First Amendment Regulations, 2023 (p6). It comes into force from the date of publication in the Official Gazette; no Gazette date is printed (p6). The document itself is the operative amending text — it carries no statement of reasons.

Regulation 2 rewrites the definitional basis for Virtual Net Metering (VNM): it adds provisos letting a residential consumer in a multi-storeyed building site a renewable generating system anywhere in the same distribution licensee's area, and letting multiple residential consumers in a housing society or apartment owners association pool into one common system within a capacity ceiling equal to the sum of each participant's eligible capacity; it also defines "Lead Person" and "Virtual Net Metering" (p6).

Regulation 3 (p7) routes VNM grid connectivity and scheduling to other Commission regulations and lists the Lead Person's duties — being a participating consumer, signing the net metering agreement, serving as nodal contact, and requiring written, unanimously approved change of Lead Person. Regulation 4 (p7) covers technical arrangements: a check meter for gross-metering and VNM systems, a 15-day notice before rejecting an application at a distribution transformer with chronological seniority, and an obligation on the licensee to upgrade distribution infrastructure within Electricity Supply Code timelines, with cost going into the annual revenue requirement.

Regulation 5 (p7–8) sets VNM energy accounting and settlement: crediting in each participant's monthly bill by the agreed procurement ratio, a proviso that credited capacity cannot exceed the consumer's net-metering eligibility, one ratio change per financial year on two months' notice, time-block compensation with surplus treated as off-peak for ToD consumers, carry-forward of surplus as energy credits, year-end treatment via Clause 11.4(c), and exemption of open access charges and losses until rooftop solar in Maharashtra reaches 5000 MW. Monthly settlement applies to non-ToD consumers.

Regulations 6 and 7 (p8–9) amend the annexures: a 15-day feasibility study deadline with deemed feasibility on default, deemed acceptance without feasibility study for applications up to 10 kW, publication of model net metering/billing/gross metering agreement formats on the licensee's web portal, and the VNM clauses to be inserted into the net metering agreement, including a procurement-ratio table.

Standard name
Net Metering and Rooftop Solar
Primary topics
Net metering, Energy accounting and settlement, Metering

Read with this

Other copies of these documents (1)

10 more documents belong here and are not on Voltaic: 5 drafts or notices on a draft not held as English text, 4 drafts or notices on a draft and 1 copy in another language.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document