Grid Interactive Rooftop Renewable Energy Generating Systems (First Amendment) Regulations, 2023 — Statement of Reasons

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (GRID INTERACTIVE ROOFTOP RENEWABLE ENERGY GENERATING SYSTEMS) (FIRST AMENDMENT) REGULATIONS, 2023 — STATEMENT OF REASONS

Statement of reasonsDated 16 Nov 2023

The commission's reasons for the Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Maharashtra Electricity Regulatory Commission's Statement of Reasons dated 16 November 2023, explaining why it finalised the First Amendment to its 2019 Grid Interactive Rooftop Renewable Energy Generating System Regulations (p1–2). It is a consultation record rather than the operative instrument: the draft amendment and Explanatory Memorandum were put on the MERC website on 5 August 2023, comments were invited by 25 August 2023 and extended to 4 September 2023, and 15 stakeholders responded (p1–2). Each issue appears as proposed text, comments received, and the Commission's analysis and decision, with the amended clause wording quoted in the analysis.

Chapter 1 (p3) is a single issue: the compensation a distribution licensee must pay for delay in giving connectivity under Regulation 9.5. The draft was left unchanged.

Chapter 2 (p4–19) is the substantive core and deals with consumer-facing definitions and metering mechanics — who counts as an Eligible Consumer and the system capacity limit under net metering (which the Commission raises, reckoned on AC output, p5, p7–8), the definitions of Gross Metering and Net Billing (p8–9), the categories of arrangement recognised under Regulation 3.1 (p10), the cross-referencing introduced by Regulation 3.3 (p11), the check meter for gross metering (p12), the credit-payout proviso to Regulation 11.4(e) with payment handling and interest for delay (p12–14), a new Regulation 11(A) on net-billing energy accounting with a billing formula (p14–15), the rewritten Gross Metering settlement provision and meter-replacement requirement (p15–16), and the connection-cost clauses in Annexure-4 and Annexure-7 of the model agreements (p16–19).

Chapter 3 (p20–31) collects the remaining points: how self-consumed and surplus renewable energy counts towards RPO compliance (p20); the introduction of Group Net Metering, with its definition, early termination of existing connection agreements, settlement and priority sequence, and an exemption from wheeling charges and losses until rooftop solar in the State reaches 5,000 MW (p21–23); the revised Model Application Form (p23–25) and model agreement clause (p26); meter location and AMI (p26–27); charges for non-conventional generation (referred to the Distribution Open Access Regulations, p27); load factor incentive (p28); unauthorised capacity enhancement (p28); grid support charges and banking charges (p29–30); retention of banking and ToD-based settlement (p30–31); and common frameworks for HT and LT consumers (p31). Annexure-I lists the fifteen commenting stakeholders (p32).

Standard name
Net Metering and Rooftop Solar
Primary topics
Net metering, Gross metering, Net billing

Read with this

Other copies of these documents (1)

10 more documents belong here and are not on Voltaic: 5 drafts or notices on a draft not held as English text, 4 drafts or notices on a draft and 1 copy in another language.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.