Rooftop Solar PV Grid Interactive System based on Net Metering Regulations, 2015 — First Amendment, 2018

Himachal Pradesh Electricity Regulatory Commission (Rooftop Solar PV Grid Interactive System based on Net Metering) (First Amendment) Regulations, 2018

AmendmentDated 6 Nov 2018No. HPERC-H(1)-11/2015 dated 6th November, 2018

Amends the Rooftop Solar PV Grid Interactive Systems based on Net Metering Regulations, 2015.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Himachal Pradesh Electricity Regulatory Commission's First Amendment to its 2015 rooftop-solar net-metering regulations, notified from Shimla on 6 November 2018 and expressed to take effect on publication in the Rajpatra, Himachal Pradesh — the Gazette date itself is not printed (p1). It is a compact amending instrument of numbered clauses, each rewriting a specific regulation of the parent rather than creating a standalone scheme.

Clause 2 replaces the definition of "premises" (p1). Clause 3 resets the ceiling on rooftop capacity a consumer may install: a proportion of sanctioned contract demand for two-part-tariff consumers, and load-slab (Table-1) and voltage-band (Table-2) limits for single-part-tariff consumers. Provisos let a designated licensee officer above a stated rank approve larger systems on dedicated three-phase LT feeder connections, require the computed capacity to be rounded up, and oblige the licensee to keep spare capacity in its network and to augment equipment through its capex plan when loading approaches its rating (p1–2).

Clause 4 recasts the regulation 7 approval process, replacing fixed day-counts with timelines carried in new Tables 3 and 4, permitting the consumer to buy meters where the licensee has no stock, and adding sub-regulation (9) binding the licensee, the consumer, the State Nodal Agency and the Chief Electrical Inspector to those tables: Table-3 runs from application through installation, inspection, synchronisation and first billing; Table-4 covers subsidy application, in-principle approval, inspection and release, with notes allowing extension for deficiencies and shortening through joint inspection (p2–4). A second clause numbered 4 rewrites regulation 9 metering — main solar meter accuracy and communication facility, when a check meter is mandatory, and which meter readings the licensee takes (p5). Clause 5 rewrites regulation 10(9): settlement of surplus energy turns on whether the Letter of Approval issued on or before 15.11.2018, with fixed per-unit rates in that case, or later, when domestic consumers get Commission-determined rates and other consumers get nothing; a subsidy-linked proviso halves the earlier rates, and other charges and the low-voltage supply surcharge are aligned with comparable consumers (p5–6).

Standard name
Net Metering and Rooftop Solar
Primary topics
Net metering, Metering, Renewable energy tariff

Read with this

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.