Rooftop Solar PV Grid Interactive System based on Net Metering Regulations, 2015 — First Amendment, 2018
Himachal Pradesh Electricity Regulatory Commission (Rooftop Solar PV Grid Interactive System based on Net Metering) (First Amendment) Regulations, 2018
AmendmentDated 6 Nov 2018No. HPERC-H(1)-11/2015 dated 6th November, 2018
Amends the Rooftop Solar PV Grid Interactive Systems based on Net Metering Regulations, 2015.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Himachal Pradesh Electricity Regulatory Commission's First Amendment to its 2015 rooftop-solar net-metering regulations, notified from Shimla on 6 November 2018 and expressed to take effect on publication in the Rajpatra, Himachal Pradesh — the Gazette date itself is not printed (p1). It is a compact amending instrument of numbered clauses, each rewriting a specific regulation of the parent rather than creating a standalone scheme.
Clause 2 replaces the definition of "premises" (p1). Clause 3 resets the ceiling on rooftop capacity a consumer may install: a proportion of sanctioned contract demand for two-part-tariff consumers, and load-slab (Table-1) and voltage-band (Table-2) limits for single-part-tariff consumers. Provisos let a designated licensee officer above a stated rank approve larger systems on dedicated three-phase LT feeder connections, require the computed capacity to be rounded up, and oblige the licensee to keep spare capacity in its network and to augment equipment through its capex plan when loading approaches its rating (p1–2).
Clause 4 recasts the regulation 7 approval process, replacing fixed day-counts with timelines carried in new Tables 3 and 4, permitting the consumer to buy meters where the licensee has no stock, and adding sub-regulation (9) binding the licensee, the consumer, the State Nodal Agency and the Chief Electrical Inspector to those tables: Table-3 runs from application through installation, inspection, synchronisation and first billing; Table-4 covers subsidy application, in-principle approval, inspection and release, with notes allowing extension for deficiencies and shortening through joint inspection (p2–4). A second clause numbered 4 rewrites regulation 9 metering — main solar meter accuracy and communication facility, when a check meter is mandatory, and which meter readings the licensee takes (p5). Clause 5 rewrites regulation 10(9): settlement of surplus energy turns on whether the Letter of Approval issued on or before 15.11.2018, with fixed per-unit rates in that case, or later, when domestic consumers get Commission-determined rates and other consumers get nothing; a subsidy-linked proviso halves the earlier rates, and other charges and the low-voltage supply surcharge are aligned with comparable consumers (p5–6).
Read with this
The regulation
Amendments and corrections
Commencement notices and reasons
- Dated 31 Jul 2015Rooftop Solar PV Net Metering Regulations, 2015 — Finalisation Order
- Dated 6 Nov 2018Rooftop Solar PV Net Metering Regulations, 2015 — First Amendment, 2018 — finalisation order
- Dated 14 Sep 2022Rooftop Solar PV Grid Interactive System Regulations, 2015 — Second Amendment, 2022 — Finalisation Order
- Dated 19 Aug 2026Rooftop Solar PV Grid Interactive System (Fourth Amendment) Regulations, 2026 — Finalization Order
Procedures and orders made under it
Earlier drafts
- Dated 8 Oct 2018Rooftop Solar PV Grid Interactive System based on Net Metering Regulations, 2015 — First Amendment, 2018 — Draft
- Dated 11 Mar 2019Rooftop Solar PV Grid Interactive System based on Net Metering Order, 2019 — Draft
- Dated 5 Jul 2022Rooftop Solar PV Grid Interactive System (Second Amendment) Regulations, 2022 — Draft
- Dated 13 May 2024Rooftop Solar PV Grid Interactive System Regulations, 2015 — Third Amendment, 2024 — Draft
- Dated 14 Jul 2026Rooftop Solar PV Grid Interactive System Regulations, 2015 — Fourth Amendment, 2026 — Draft
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.