Rooftop Solar PV Net Metering Regulations, 2015 — First Amendment, 2018 — finalisation order

In the matter of draft amendments of the Himachal Pradesh Electricity Regulatory Commission (Rooftop Solar PV Grid Interactive System based on Net Metering) (First Amendment) Regulations, 2018.

OrderDated 6 Nov 2018Published in the Gazette 12 Oct 2018

Read with the Rooftop Solar PV Grid Interactive Systems based on Net Metering Regulations, 2015.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Himachal Pradesh Electricity Regulatory Commission's order of 6 November 2018 (p6) finalising the First Amendment to its 2015 Rooftop Solar PV Grid Interactive System (Net Metering) Regulations. It is the reasoning-and-decision record that closes the public consultation opened when the draft amendment was notified on 8 October 2018 and published in the Rajpatra on 12.10.2018 (p1–2).

The recitals (p1–2) set out the background: the national 40 GW rooftop solar target and MNRE's request for installation timelines; HPSEBL's view that a consumer who generates and consumes, and who gets subsidy, should receive nothing for net surplus energy; and HIMURJA's suggestion on capacity. Newspaper notices and a website posting invited objections, with stakeholders asked to reply by 29.10.2018 (p2). Three parties filed — the State NES department, HIMURJA and the Consumer Representative — and the order summarises each submission, including a proposed benchmark capital cost and a plea for monetary benefit to domestic consumers (p2–4).

The Commission's View (p4–6) decides two contested points. It retains the draft's capacity limits for grid-interactive rooftop systems, refusing HIMURJA's request to lift the LT (3-phase) ceiling to 100 kWp, but adds a further proviso to Regulation 5(2) allowing an officer of Superintending Engineer rank or above to permit rooftop capacity up to the sanctioned connected load, capped at 50 kWp, where the consumer is supplied through a dedicated 3-phase LT feeder (p4–5). On energy settled at the end of the settlement period, it accepts payment only for domestic supply consumers, prospectively, at rates to be determined from time to time taking subsidy into account; the substituted Regulation 10(9)(i)(b) fixes rates of Rs. 5.00 per kWh (single part tariff) and Rs. 4.50 per kVAh (two part tariff) for Letters of Approval issued on or before 15.11.2018, halves them where subsidy or grant exceeds 50% of normative capital cost, and sets a zero rate for non-domestic consumers after the cut-off (p5–6). Old cases continue at the rate already specified. The order records the draft amendment as finalised and directs that it be notified (p6).

Standard name
Net Metering and Rooftop Solar
Primary topics
Net metering, Renewable energy tariff, Subsidy and cross-subsidy

Read with this

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document